Loading…
Loading…
2,531 results • Best match
Construction of RCC Drain with CC Road and 1 no Culvert from Station main Road to OT Road via- Matrusakti Hospital Road in ward no-19
CONSTRUCTION OF CEMENT CONCRETE ROAD WITH SIDE DRAIN OVER COVER SLAB AND RCC CULVERT FROM NH 26 TOWARDS ELECTRICAL OFFICE AT COLLEGEPADA IN WARD NO 02
SR to Road from Godal to Kaseipani such as 2 nos of (1x6x3) Culvert Railing repair, wearing coat and approach road in the district of Nuapada
S/R to S.N.K.U.B.M Road (SH-19) such as Restoration to Culvert Approach with BUSG, PMC and SC at km 58.500 for the year 2020-21.
Completion of Incomplete Road from RD 0.00KM to 10.00KM of Salandi Right Main Canal (SRMC) with Road Widening and Construction of Boxcell Culvert at RD 6500M
FDR to Sansada to Engarsingi road such as Construction of Box cell culvert at Ch 5/250 Km and approach road for the year 2018-19.
S/R to RD Road to Brahmanikansa Road and Construction of Boxcell Culvert (3x6.0x3.0) under AMP in the District of Keonjhar for the year 2025-26.
Reconstruction of Boxcell Culvert at 3.500 km on Angul Town road DIC chhak to Hulurisingha chhak in the district of Angul for the year 2023-24.
Construction of Paver road , drain and one culvert from Gopalpali Village Main road PWD CC road TO nh Service road( Via Honda Service Centre) Ward No-13
Construction of RCC Box drain wall and culvert from Mahadev timber to C-Lee photo studio, Laxmisagar CTC road to Drain no 5 in ward no. 42
SR to Gochhapada to Salaguda road such as construction of Box cell culvert (1x4x3) at Ch 0.150Km for the year 2023-24 in the district of Kandhamal
RD Road to Khasapada_Road_Repair to such as box-cell culvert of size (1 x 3 x 3) along th approaches_At 1/150 km At 4/920 km
Construction of RCC Drain with Culvert from Plot No 1337 to Plot No 1324 of main Drain No.05 at Laxmi sagar village, in ward no 43
Construction of Paver road and Raising of drain wall with laying of R.C.C Plate from Canal culvert to Nua Bandha in ward No. 5 of N.A.C Polasara
REPAIR MAINT TO HARD STANDING INTERLOCKING TILES PATH CHAIN LINK FENCING CULVERT SAUCER DRAIN AND JAFFRY WALL OF ZONE B AREA AT GMS UNDER GE I GOS
S/R to Hudukudihi Chhak to Barpan Boarder road such as construction of 3.00m x 2.50m RCC culvert at 3/100 Km for the year 2019-20
Construction of Box Cell Culvert at 3/550 Km on Dhamnagar Dobal Sendhpur Road in the district of Bhadrak under State Plan for the year 2022-23.
CONSTRUCTION OF CC ROAD WITH SIDE DRAIN WITH COVER SLAB AND CULVERT FROM SURYA NARAYAN MUND HOUSE TO LALIT THAKUR HOUSE AT FATEHNAGARPADA IN WARD NO 07
Construction of Retaining wall including R.C.C Drain with cover slab From Xavier road to Siva Mandir culvert drain adjacent to Loyala school pond in ward no-20
Construction of RCC Covered Drain with culvert from Purna Chandra Nayak Res towards Rajiv Lochan Panda Res at Ananta Vihar in Ward No.05 of NAC Daspalla
Replacement of Critical Leaky portion of FO jetty line near JSPL/JSW railway crossing through existing culvert by Hot Tapping Method at Paradeep under Odisha State Office
Renovation of RCC drain with cover slab from Jobra Fish Market Chhack to Dasa Sahi culvert via Purna Ch. Beura res located at Jobra in W.No 40.
Construction of CC Road and Drain from N.H. to Nagbacha Mandir and Nagbacha Mandir to Sadabrata Mandir (Culvert infront of School) in W.No.09 under NAC Barpali
Improvement to PS road to Kukurbindha PMGSY road A such as new Boxcell culvert 6x4m double span at 1100 mtr under SR for the year 2022 23
Repair and Restoration of Rural Roads of Puri Arakhakuda road such as construction of Box cell culvert for the year 2020-21 in the Dist of Puri.
Construction of Box Cell Culvert at Ch.0/250 Km near Town Thana from Nalini Chowk to Ambedkar Chowk Road of Sonepur, in the District of Subarnapur
S/R to Mandasa - Meliaputi - Paralakhemundi - Kasinagar -Gunupur road (SH 4) Such as construction of Box cell culvert (1x4.00x2.00)at 26/200Km for the year 2019-20
Construction of new BT Road of width of 18mtr and length 505mtr with 2nos. of single row 900 dia. RCC Culvert at Jayamangal Industrial Estate, Khurda, Odisha.
Tanginiguda - Dasmantpur-Bodaput Road_Road_Potholes repair by WBM GR-III, PMC and Sealcoat./Shoulder filling, and RCC Culvert (1X3X3)_6/000 to 12/000 At 8/450 km
FDR to Trilochanpur Champaghat ROAD FOR THE YEAR 2020-21 (Provision of 1000 mm dia Double Row HP Culvert at RD 0.350 km and CC Approach road)
Construction of Box Cell Culvert 1 x 3 x 3 mtr at 28/400 Km on Telkoi - Bimala - Petraghati - Raisuan - Kaliahata Road for the year 2024-25.
Construction of R.D. Road to Arjunchua Road for the year 2019-20 (Affected by Super cyclone FANI Such as Construction of RCC Culvert ( 6mx2.50m) at 2/000Km)
Construction of Box Cell Culvert of Size (2x4.00 m x 2.00 m) at ch.11/250 km on Sitaguda to Ranipanga road for the year 2023-24
Construction of (1 x 2000 x 2000 x 9000) New Box Cell Culvert on Light House Approach road ( at Ch. 4.350 km of Balasore Bye Pass Road)
Construction of Box Cell Culvert at 0/030Km on Bhadrak-Barpada-Bonth-Basantia Road in the district of Bhadrak under State Plan for the year 2022-23.
S/R to Kukudabai to Umuri road such as Boxcell Culvert (1x 6x 3) m At 7/000 Km in Tentulikhunti Block for the year 2024-25
Constructionn of C.C Road in different lanes and RCC Culvert on side of Bibekananda School and near Kamala Nandi house at Mausimasahi Ward No-09 , KONARK N.A.C
S/R to PWD Road to Maharajore (Boxcell Culvert 4x6x4 at Ch.1.500 Km) under Boden Block in the District of Nuapada for the year 2022-23
S/R to S.N.K.U.B.M Road (SH-19) such as pothole repair to Culvert approach with BUSG, PMC and SC at km 67.020 for the year 2020-21.
Construction of Road and Drain with Cover Slab from Guru Kaibarta house to Krushna Kaibarta house and Culvert near Prasad Dansena in Ward No.06, N.A.C.,Junagarh
Construction of Boxcell Culvert at 5th Km on Link Road to Temurupalli under Biju KBK (State Sector) in the District of Malkangiri for the year 2023-24
Construction of Box Cell Culvert at Canal Crossing at Ch. 3/380 Km (Road Ch. 7/280 Km) in Ramachandrapur - Harichandanpur Road in the District of Keonjhar
Providing Barricading and Preparation of ground in the PTS field at Nayagarh for Celebration of Independence Day 2026.Such as field levelling tree culvert and stage painting
Construction of culvert and approach road near football playground and supply, fixing of overhead tank at Uttamsingh hutting and Damu hutting in Ward No.13 and 14
S.R to Ramagiri- Jeerango- Narayanpur road such as cutting of bush, painting of trees and Culvert from 15.000 km to 30.400 km for the year 2025-26.
CANAL WORK
CANAL WORK
Culvert Work
Culvert Work