Loading…
Loading…
11,168 results • Best match
Providing CC Road and Culvert at Pattavarthi AD colony in Saluppai Panchayat in Jayamkondam block of Ariyalur District under Scheme for AGAMT II 2024-25
Desiliting the Existing Storm Water Drain and Reconstruction of damaged Culvert at Muthusamy Colony, LIC Colony and Thillai Nagar in Ward No 79, South Zone.
TCMC - Construction of Raising RCC Culvert at Balaji Nagar 12th Street , Balaji Nagar 15th Street and Balaji Nagar 3rd Main Road in Ward No.2
Nagercoil Corporation Providing Paverblock,Small Culvert,Soak pit and 200mm PVC pipe in CSI Church,3rd crs street and Alexandar street at ward no.6
Construction of Pipe culvert At across Mudhukadu - Perumagalur link road in mudukadu Panchayat at Sethubavachatram Block in Thanjavur District under UNION GENERAL FUND 2024-2025
VELLORE DISTRICT Construction of Drainage and Culvert from Anandhan house to Channel at Melmurungai in M.V.Kuppam Panchayat PERNAMBUT BLOCKGENERAL FUND 2024-2025 PACKAGE NO 04
Construction of Storm Water Drain and Culvert at Ward No. 24 Ram Nagar temple to Concardia School, Ganapathi Nagar Pallam in Hosur City Municipal Corporation
Reconstruction of Storm water drain and culvert at Avarampalayam bridge road 162028R06878 from SBI Bank to Panariamman kovil opposite in ward no.28, north zone.
Construction of Storm Water Drain and Culvert Mariyamman Koil Street no-2 and Mettu Street -3 at in Division no - 55 of Kondalampatty Ward Office.
Construction of new RCC culvert in Maruthu Pandiyar Street, Vasuki Street, Nadana Gopal Street, Vivekananadar 1st Cross Street Junction in Ward No.91 Zone 5
Natham Town Panchayat Construction of Drainage at 10th ward South Street Ahamad House near and Culvert at Lokal Kani House near in Natham Town Panchayat
onstruction of RCC Culvert at Subbu nagar in ward no. 30 and Storm water drain at Mill road in ward no.29 in Gobichettipalayam Municipality
Providing Minor Culvert and Drainage at Pallivasal Street in Thirikoodapuram Village and Pachayat in Kadayanallur Panchayat Union, Tenkasi District under PUGF 2025-26 (EST.AMT- 1.00L)
Construction of storm water drain and culvert at ward no.1 Sellanur new colony 3rd cross street to sellanur main road in Annur Town Panchayat
Providing CC lane and Construction of Culvert at Mariyamman kovil street north cross-3,Kasakaranur main road in Division No. 18 of Suramangalam Ward Office.
Construction Strom Water Drain and Culvert at Perumal koil medu street -4, in Division No.59 at Kondalampatty Ward Office in Salem City Municipal Corporation
PROPOSED CONSTRUCTION OF SUMP AND PUMPING ARRANGEMENTS FOR BAILOUT THE WATER FROM OUTLET OF RAILWAY CULVERT NO 45 IN DIV-132,U-31,Z-10
Providing Box Type Culvert at Jayaram Nagar 12th Street 1st Cross and Jayaram Nagar 12th Street 2nd Cross in Dn 148, Unit 33, Zone 11
Contruction of Storm Water Drain and Culvert at Shunmuga Nagar,Periyathambi Street,Najappa Garden, Rajarathinam Nagar and Thiruvaluvar Nagar in Ward No 77, South Zone,
Construction of Storm Water Drain and Reconstruction of Culvert along the western side road of Bharathi Colony Main Road in Ward No.27, North Zone.
SA Div: Rebuilding of existing pipe culvert into Precast RCC boxes in ADEN/PTJ Sub Division.( Maintenance period 4 years from the date of completion)
Providing and Strengthening of CC Road 260M with Drain 10M and Culvert 1 No at Ward No.1, Chinnammasamudhiram kudi street (Ist Cross Road) in Pethanaickenpalayam Town Panchayat, Salem District.
Wdg from IL to TL and Stg at km 0/0 - 4/0 of Alankuppam-Konerikuppam -via- Avanipur road including reconstruction of Box culvert at km 0/2,6, 10 i,ii, 1/2, 6,10,2/8,3/6 and 3/10 and construction retaining wall at km 0/4 and 1/4.MDR-748 - VPM-39
Widening from IL to TL and Strengthening at km 2/4 - 4/0 of Trichy-Cidambaram Road branching at km30/2 to kallakudy-Thappai Road including construction of protective wall at km 2/6, 2/8, 2/10, 3/2 and 3/4 and widening of box culvert at km 2/6. TRY 22
Wdg from SL to IL and Stg at km 0/0-2/0 of Keelakavattankurichi - Alambady - Metthutheru road including Reconst of Box culvert at km 0/2, 0/4 (i), 0/4(ii), 0/8, 1/8, 1/10 Const of drain at km 0/0- 0/8 and 0/10-2/0-VPM-1-
Construction of Strom Water Drain with Culvert Slab at 12th Ward Rajagopalapuram 3rd Cross street in Thadikombu Town Panchayat, Dindigul District.
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 9/2 OF MADAVANAGAR-SOORANAM ROAD IN LIEU OF EXISTING CAUSEWAY
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 2/4 OF KALAKAD - CHITHAMBARAPURAM ROAD IN LIEU OF EXISTING CAUSEWAY
Construction of High Level Bridge at Km 0/2 of Vijayapathi - Koothankuzhi road in lieu of existing causeway
Reconstruction of Minor Bridge at km 0/6 of Mangalur - Lakkur Road in Lieu of existing piped causeway
Construction of Minor Bridge in lieu of existing piped causeway at Km 13/6 of Thalavadi - Konganhalli Road
Construction of High level Bridge at km 9/4 of Melamadai -Palavanatham road in Lieu of existing causeway
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 10/8 OF MADAVANAGAR-SOORANAM ROAD IN LIEU OF EXISTING CAUSEWAY
Construction of High Level Bridge at Km 8/8 of Sakkottai Paravayal Road in lieu of existing causeway
Providing Retaining wall with causeway at ward no 5 at Mayanam VAO Road Alandurai in Alandurai Town Panchayat
Construction of High Level Bridge at Km 0-10 of Athanoor -Milagunatham road in lieu of existing causeway
Construction of High Level Bridge at Km 17/8 of Mudukulathur Veeracholan Road in lieu of existing causeway
Construction of High level Bridge at Km 0/10 of Valavanthalpuram - Kuppampatty road in Lieu of existing causeway
Construction of High Level Bridge at km 1/10 of Nerkuppai - Velangudi road in lieu of existing causeway
Construction of High Level Bridge at Km 0/2 of Samusigapuram -Vadakarai road in lieu of existing Causeway
Reconstruction of High level Bridge at Km 0/6 of Ekkur road in lieu of existing piped causeway
Restoration to the Causeway at km 24/8 of Pudupadi- Illuppai- Vadailluppai- Perumpakkam-Vishar- Kancheepuram road - TVM 52
Temporary Restoration to the Flood damaged piped causeway at Km 11/8 of Tiruttani - Nagalapuram road (Nagalapuram Side)
Construction of High Level Bridge at km 0/8 of Athikulam - Ulakkudi road in lieu of existing Causeway
Construction of High Level Bridge at km 15/2 of Udaiyarpatti - Seevalaperi Road in lieu of existing causeway
Construction of High Level Bridge at Km 17/10 of Radhapuram - Idayankudi road in lieu of existing causeway
Reconstruction of Minor Bridge at km 3/10 of E.Keeranur Pudukulam road in Lieu of existing piped causeway
Construction of High Level Bridge at Km 4/8 of Sirugavayal Thalaiyur Road in lieu of existing causeway
Construction of High Level Bridge in lieu of Existing causeway at km 3/10 of Sundavilai - Vadankkankulam Road
Construction of High Level Bridge at Km 16/10 of Mudukulathur Sikkal Road in lieu of existing causeway