Loading…
Loading…
7,010 results • Best match
Aligadi Kanpur Marg N.H. -234 SE Rajjapurwa Allahaganjh Hote Hue Jankhat Ausher Ema Pul Tak Marg (O.D.R.) Ke Km. 5 me 3x3 RCC Box Culvert and Approach Ka Karya
CONSTRUCTION OF BOX CULVERT (RCC VRB) AT KM. 2.120, 15.340 OF PENG DY., KM. 1.087 OF ALINAGAR MR., KM. 0.000 OF DEVARIYA MR. AND KM.0.870 OF PAIRDHAI MR.
Thariyaon Asothar marg se Bhairawa sampark marg per Esthit sasur khaderi River per 5x6 m Span ke Laghu setu, (Box Culvert) approach road, additional approach road and Protection work
Construction of RCC box culvert (VRB) at km. 3.960, 8.870 of Sahadat nagar dy., at km. 12.170 of Jajupara mr. and at km. 10.770 of Rabha dy. (Lot-11)
C/O Malhani Koiridiha Itauri Jamuhai road ke km 0.4 se tiwari ka pura ke madhy nale par 2X3X3 mtr ke box culvert Approach road and Additional Approach road
Construction of 5 Cell 4x4.00mtr Span R.C.C. Box Culvert, Approach Road, Additional Approach Road and Protection Work at Chandaha Nala in Gram Panchayat Khargapur in Financial Year 2025-26
Construction of a 3x6 m span box culvert (1.60 km) approach road and additional approach road from Beruijor to Ajanbaba (Shiv Temple) over the Sai river in Dist-Hardoi
Construction of RCC Hume pipe culvert at Hindon river near village sadouli Hariya in Distt.- Saharanpur.
Construction work of a new small bridge (box culvert) of 1 x 6 m span in place of the narrow culvert built on Subeha canal at km 04 of Jais Dakshingaon to Pali Urermau road (ODR) in Amethi district.
Construction of Box culvert and Pipe Culvert on Dudwa Jamauli Ranepur Anehi (ODR) (Near Security Kevin of Block No 4) and Bhikhanpurwa and Madara Ray Guman road na dPura Nadiha road to Jarailapurwa road under 250 megawatt solar project
Special repair work on the road from Kallarpur Subhari Marg to Rajwaha track and CC in the populated part. And construction of drain and construction of box culvert in place of damaged culvert on Rampuri Rajway in km 3.
Construction work of 3x6 m span RCC box culvert and approach road in place of previously constructed culvert from Km 19 of Hasanpur Rahra Gawa road (Other District Road-51) via Dhabarasi to Sodhan Bahadurpur Mishra in Amroha District.
Construction of 3x2 M Span RCC Box Culvert at Chatiya Karnjaha link road in Km 1 at place of damage culvert with Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 01 of 02
Construction of box culvert for water drainage at k.m. 0.725 of link drain between tilaiya drain and northern end of isolation bay of underconstruction ayodhya international airport
Modification of existing monolithic RCC culverts to pre-cast slab cover type culvert at Mathura Refinery (Phase-I)
Construction of 2x6M RCC Slab Culvert and Approach work in Km-9 of CSNTN Road to Vishunpur Sagarahwa Ganeshpur Belahiya Bargadwa Road (ODR) under Nabard (RIDF-30) Yojana (Lot No-5/7)
Construction of a 4.00 m span RCC box culvert at km-1 of Rohta to Barpura road under special repairs in Agra district in the financial year 2025-26.
Construction work of 2 x 2 RCC box culvert and approach road in place of damaged culvert at km-19 of Bansi-Itwa-Belwa road (State Highway-159) and at km-6 of Bahadurpur to Mechuki Devbharia Gaura road (ODR).
Construction work of RCC box culvert of 2x4x3.00 m span and approach road at the damaged and narrow culvert located at Km-3 of Bharatpur Girant main road from Jhalari Ka Purwa via Bangaon Nibiahwa Pokhara in Ambedkar Nagar district
Construction of 05 Nos. B type shop, C type 20 Nos. shop, Auction platform 01 Nos. (9X40) Civil and shade work, Development work, Internal road, crossing culvert (04 Nos.), RCC box culvert, nala (0.9x0.9), water stand post, SMY Gurubakshganj, Raebare
Construction of 5 Cell 3x3.00mtr Span Box Culvert, Approach Road, Additional Approach Road and Protection Work at Badela Tall on Gurchahi to Munderwa Thakurain Road in Financial Year 2025-26
Construction of Pandeypur Ekauna Road (ODR) Km.-9 me isthit Damage Puliya ke asthan per 2x3.00x3.00 mtr. Span RCC Box Culvert Year 2025-26 in District-Shrawasti. (05 Years Maintenance)
Construction of RCC Box Culvert of 5x4mx4m Span, Approach road and Additional Approach Road on Tamsa river Sitiuated in between Aihar mangi chandpur road to Amawasufi village in dist Ayodhya
Construction of 4x3m box culvert at Existing Barrel No. 7 on Lohiya Path, Gomti Barraj to Khurram nagar at Ring road Via Left Bundh of Kukrail Nala in Lucknow District
Construction of RCC Box Culvert 5x5x5 Meter span approach road and additional approach raod on Bhawapar Bela Bandha road to Bhilorhi Farshi road Distt Gorakhpur Lot No 3 of 5
Re-construction work of RCC Box Culvert of 3x6m span in place of short bridge of narrow and damaged arch at km 13 of Jhagirabad Daulatpur Road Under Nabard Yojna
Construction of RCC box culvert (VRB) at km. 6458, 7.625 of Sikandarpur mr., Km. 4.085 of Baraha mr., 0.000 of Kamrauli mr. and Km. 2.610 of Tiriya mr. (Lot-06)
Construction work of 5x6 m span box culvert, approach road and protective work in place of damaged minor bridge at Km-62 of Bahraich Sirsia Tulsipur Gulriha Road (SH 158)
Construction of 3x4.00 Mt. RCC Box Culvert, Approch Road on Canal at Bajgahani Road to Raigwa Mohanpur Danditala Akhaipur Pipriha Ghunghter (ODR) Road Km. 7 in Block Nindura District Barabanki
Construction of RCC Box Culvert of size 2x3x3 M in place of Hume Pipe pulia on Banideeh ke aage se Gandhauna Link Road ke Km 1 me in Distt Jaunpur
C/o Box Culvert 25M length 5x5m, Approach road and add. Approach road at Nasopur Sipah hote huye chitai patti tak road sipah ke pas nale par in District Ambedkarnagar
Construction of 5 Cell 3x3.00 Mtr. Spam Box Culvert, Approach Road and Protection Work on Huzoorpur Jagdishpur Road to Yadavpur Matehiya Via Gangtahiya Link Road in Financial Year 2024-25.
Construction of 2x2 Mtr. Span 3 Cell Box Culvert on Mehti Nadi Nala at Khanpur to Raipur Khader Road KM 2 Ch. 1.975 in Distt. Bijnor in year 2019-20
Tindwari rajbaha ke km 7.700 par box culvert ka punarnirman ka karya tahtha tindwari rajbaha ke km 7.660 km 12.576 avam km 11.100 par puliya marammat ka karya Lot-68
Construction of 3 Cell 4x4Mtr. R.C.C. Box Culvert on Jarwal Gandara to Deeha Link Road in Km.-2 Under Rajya Yojna Samanya in Financial Year 2020-21. Vidhan Sabha Kaiserganj
3 cell 4x4 meter box culvert access road and protective work on supplementary drain of Deoha river located in chainage 0-30 of Rampura Ujhania Ehtmali road in district Pilibhit
Special Repair of 1X2.0X2.0 single cell RCC Box culvert At Mahrajganj Chandapur Semrauta Km-8 to Janai dautara road km 4 to sitaram ka purwa link road At Chainage 0.000
Under Nabard scheme reconstruction work of 3x6 meter RCC box culvert in place of narrow and damaged bridge located in km 19 of Lakhoti Khanpur Gesupur Basighat Road in Bulandshahr
Construction of 2x3 m clear span(total span 7.10 m) box culvert over Bajpur Nala Emerging Rari River and both side approach of Bajpur and Kuwarpur Road in District Barabanki.
Construction of 5 Cell 4x4 meter R.C.C. Box Culvert on Sumerpur to Talab Bagel hote hue Krishna Nagar Colony L/R in Financial Year 2020-21. (Vidhan Sabha Bahraich/ Payagpur)
Construction of Box Culvert Approach road and Additional approach road in 5x5meter 5 cell at Hasudi Nala of Kandrai Khortha Barwal road in District Gorakhpur Lot No 1 of 1
Construction of a 5x5 m span box culvert,1570 Meter approach road and additional approach road In between of Semramau to Mehruniya In Middle of Behta Nale at Dist-Hardoi
Construction work of damaged approach road and wing wall of slab culvert located at Km-2 of Kutra link road from Km-10 of Kulpahar Naugaon road to Jaitpur railway station Km-2
Construction work of culverts and drains in various wards of Nagar Panchayat (10 Nos.)
Janpad Maharajganj me Ramgarhwa Gram ke Bhargai tola me Jharahi Nala par Laghu Setu 5x5x5Mtr Box Culvert Pahuch Marg amd Atirikt Pahuch Marg ka Nirman Karya Lot No-2 of 2
Construction of 3 x 6x 4 m RCC box culvert in place of damaged bridge in km-24 of HLB road to km 2 of Phulwaria link road in Balrampur district
Construction work of 3x4 meter span RCC box culvert approach road and additional approach road on Laukha Nala between Gandhipur Road and Bansura Chiraiyya Road in Block Fatehpur of District Barabanki
Construction work of 4x4 meter single cell box culvert and CC road and drain in Sanita Aabadi area at km-3 of Falavada to Gadhina via Sanota road. (Assembly Assembly- Sardhana)
Construction work of 3x6m span RCC box culvert and approach road over the Bhaista River on Kuiyan to Umarseda road at km 22 of Hardoi Pihani Chapartla road in Block-Hariyawan
CONSTRUCTION WORK OF 3X4X4 M SPAN BOX CULVERT IN PLACE OF THE DILAPIDATED BRIDGE OF IRRIGATION DEPARTMENT BUILT AT KM-1 OF KHAMRIYA SHUKL LINK ROAD IN BAHRAICH DISTRICT VIDHANSABHA-MAHSI