Loading…
Loading…
7,010 results • Best match
Reconstruction work of 15 m span RCC Box Culvert in place of minor bridge located at Km 1 of Dibai Karnawas road of Talwar to Khairpur link road in District Bulandshahr
Renewal of Sarakthal Sani to Ibrahimpur Narayan Road, Ditanpur to Milak Puranpur Road, Noorpur Thakurdwara road to nawada kesho road and Approach road of Box Culvert on Gajraula to Habeebwala Road
Construction of Box Culvert 3x3 mtrs Span (height 3.00 mtrs) at Km 1 of Lowani Jajamau link road km-5 to Shatir Bangla link road over back flow of ganga river
RETENDER LOT NO.- 06 CONSTRUCTION OF BOX CULVERT AT KM. 17.350 OF PROPOSED AIRPORT RIGHT SIDE DRAIN FOR WATER DRAINAGE OF UNDER CONSTRUCTION MARYADA PURUSHOTTAM SHRIRAM INTERNATIONAL AIRPORT IN DISTRICT- AYODHYA
Reconstruction work of 3x6 Mtr. RCC box Culvert in place of the Narrow and Damaged Bridge at chainage 0.020 of Kanchrot link road of Syana-Anupshahar-Canal patri in Bulandshahr district.
Construction work of 9 cell 5x5 meter span box culvert and approach road on Dahawar drain located at Km 9 of SDNPDP State Highway 101 road up to Mandi Parishad (Panditpurwa)
Rajy Yojana Antargat Janpad Mirzapur me Vikas Khand Chhanbey, Bagheda Kala v Bagheda Khurd ke bich Karnawati Nadi par 8x6.00x4.00 Miter Spon Box Culvert, Pahut Marg and Surkshatmak ka nirman Kary
Construction of 2 X 3 X 4 meter span minor Bridge (Box Culvert) and Approach Road in place of the Rampur link Road from Dudahi Batarouli pitch road in Dist Kushinagar.
Construction work of RCC box culvert and approach road at Km 04 of Barabanki Deva Fatehpur Road via Kanaujia Road (ODR) from Jyoli Shahabpur Jahangirabad Road in Block Banki district Barabanki
Saimra minor ke km 2.00 avam samari minor ke km 0.921 par puliya punarnirman ka karya tatha tindwari rajbaha ke kmm 24.150 par box culvert ke punarnirman ka karya Lot-75
Box Culvert Construction Work
Box Culvert Construction Work
Box Culvert Construction Work
3 pcs. Box Culvert
Under District Shrawasti ,Construction of culvert (causeway) on the road leading to Nepal border from Majra Rampur intersection of Gram Panchayat Bargada, Lot No 19
Construction of damaged RCC Slab Culvert damaged in Changes 12-450 of Andauli Link Road km 13 of Miyabarauli Manjhila Paras Pakhrauli Bhanti Budhauli from km 34 of Fatehupar Baberu Atra Naraini Kartal Marg
Anti erosion work from Kali ramp to Chhatnag in 2700m length with 5 No. Box culvert (3x2 m), 5 No Pipe culvert 1.20m dia, RCC retaining wall 150m length and interlocking road at the left bank of river Ganga for Mahakumbh 2025.
Construction of 2x6 mtr span RCC box culvert and approcha road with protection and diversion works on nala at km 28 of Itaunja Mahona Kursi Kumbhrawa Dewa Chinhat Road in Distt. Barabanki
Construction of 5.0x5.0 Mtr R.C.C. Box Culvert on Bakulahi River At Tikariya khurd PMGSY road to Vajirpur link road in vill- Vajirpur Distt. Pratapgarh (Length 0.48 Km.) in year 2023-24 (3)
Under the Rajya Yojna Construction work of box culvert of 3x5 mtr Span in place of damaged minor bridge at km-54 of Hamidpur Sikandrabad Kuchesar Road SH-100 in District Bulandshahar
New Construction of 3x3 M 6 Cell Box Culvert Protection work Approach Road and Additional Approach Road on Bajhera Bhagwanpur Road to Kuandanda link road in Distt. Shahjahanpur Fin. Year 2025-26
Construction of 3x3x3 m span box culvert and Approach road over Rari Nala at Newli Near road of the Barabanki Haidergarh Bachrawa road (SH 13) Ch. 109(550) in Harakh District Barabanki
Saloni Mahimapur Kothawar link road ke km 2 se right Patahana harijan and prajapati basti ke Madhya Nale par 2x3.00x3.00 Mtr Box Culvert, Approach road and Additional Approach road in District Jaunpur
Construction work of RCC box culvert and approach road of 3 x 10.00 m span on Akhadiya drain from GMM Road to Km 3 of Kutuwapur Road to Beriyaghat State Fair Ground
Construction of 3x3 mtr Span box culvert, Approach Road and Additional Approach road on patna drain located on ganeshpur road to ghanshyampur pila burj road In Etah District in FY 2025-26
Construction of 2x6 mt RCC box culvert in place of damaged and narrow RCC bridge on Judavani Nala in km 15 of Utraula-Ayodhya-Prayagraj (State Route No. 09) in Balrampur district
Construction of 2x3 M Span RCC Box Culvert at Chaupariya Baspar Link road (VR) with Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 2 of 2
Vidhansabha Jahurabad me salampur sidhagarghat road km 3 to Ramgargh Domdera basfor hote hue bramha sthan link road km1 me barsati nale par 3x3 box culvert and pahunch road ka nirman karya
Construction of 2x4 M Span RCC Box Culvert at Mahrajganj Hanumangadhi Bhitauli road (ODR) with Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 1 of 2
Aliha Rajbaha ke km 15.258 par puliya marammat ka karya tatha aliha rajbaha ke km 17.840 par puliya punarnirman ka karya tatha km11.700 par box culvert ka punarnirman ka karya Lot-63
Anti erosion work from Daraganj Tiraha to Shastri Bridge in 600m length with 2 No. Box culvert (3x2 m) and interlocking road at the right bank of river Ganga for Mahakumbh 2025.
Construction of Box culvert and protective work in place of damaged minor bridge at km 1 on Deoria Hata to Belwa Bazaar road 3x4x4-5 m span approach road in Deoria district
Construction work of 2x6x4m span box culvert access road and additional access road on the local drain between Km-21 to Naubasta link road of Utraula Pachpedwa Chandanpur road in district Balrampur
Construction of a 1x7 meter span RCC box culvert in place of the damaged small bridge on the drain at kilometer 1 of the Nizamuddinpur to Mohiddinpur link road in Amethi district
Construction of two no. Box culvert at Km.1191.380 2 cell 3MX3M at Km.1193.300 2Cell 2MX2M in Baran Shivpuri Jhansi Section of NH 27 in the state of Rajasthan 2nd call
CONSTRUCTION OF BOX CULVERT FOR DRAINAGE AND FILLING WITH EARTH AT KM 5.000 (DHOBAHA CUT) OF NEPAL BUND ON RIGHT BANK OF RIVER GANDAK IN DISTT NAWALPARASI OF NEPAL TERRITORY. LOT 5
Construction of 2x3 M Span RCC Box Culvert at Mahrajganj Hanumangadhi Bhitauli road ODR with Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 02 of 02
Construction of 1x6.00 mtr span minor bridge (RCC Box Culvert) in place of the narrow minor bridge on irrigation department canal at Km-45 on Maholi Hargaon Laharpur Bhadfar road (SH-21)
Construction work of 5x5 three cell box culvert on Gorra drain located at Km-1 of the link road from Raiganj to Sanha Chawari via Dumnital in Gorakhpur district LOT (2/2)
Janpad Siddharthnagar me ahirauli se bhilauri ke beech parasi nale per 3 x 6 x 5 mtr span ki rcc box culvert laghu setu pahuch and atirikt pahuch marg ka nirman karya
Construction of a 1x6 m span R.C.C. box culvert, approach road and additional approach road on Tadiyawan road Km-7 to mampur Bhaisari Road Km-2 to Bharav Road in Dist-Hardoi
Construction of 4x6M RCC Slab Culvert and Approach work on Pharenda Brijmanganj Road Km-19 to Sahajanwa Babu Gujarauliya Mishrauliya to Kharkhori Road (ODR) Matiyarawa Tal under Nabard (RIDF-30) Yojana (Lot No-4/7)
Construction of 3x16.50 mtr span R.C.C. minor Bridge Well Foundation, Approach road and Protection work in place of damage R.C.C. slab culvert of S.D.N.P.D.P. road (S.H.-101) Km-57 to Daultapur link road Km-3.
Construction of 5 x 6 meter span raft foundation culvert approach road and protection work in place of damaged causeway at puranpur Bijauri road Km 11
Construction work of 1x6 mt. box culvert in place of the damaged minor bridge at Km-1 (212) Bilwa Bhuda Saidpur road in Bithri Chainpur development block under state plan in Distt. Bareilly
Construction of RCC box culvert (VRB) at km. 3.840 of Karsua grant mr., at km. 0.750 of Alamnagar mr., at km. 1.480 of Hariharpur mr., at km. 6.000 of Natayanpur mr. (Lot 13)
Vidhan Sabha Badalapur me gram saraichandi (Karanpur) Harijan Basti and Asuwapar gupta basti brahaman Basti Sumeri ka pura ke madhya Nale par Box Culvert, Approach road and Additional Approach road in District Jaunpur
Construction work of 3 cell 6x5 meter box culvert, approach road and protection work on the supplementary drains on Devha river located in chainage 0.650 of Rampura Uzhaniya Ehatmali road in district Pilibhit
Construction of 3x3 M RCC Box culvert (Minor Bridge) and approach road at Sukheta Nala Sandi Shahabad road Km-28 to Rupapur road under RIDF-25 in District- Hardoi financial year 2019-20
Construction of RCC box culvert (VRB) at km. 0.801 of Akohara mr, at km. 1.820 of Tandauna mr., at km. 1.380 of Gopamau mr. and at km. 5.970 of Panderwa dy. (Lot 14)