Loading…
Loading…
7,010 results • Best match
Construction of 5.0x5.0 Mtr R.C.C. Box Culvert on Loni River At Revenue Village Hulasgarh in Rohni Ram Village, Distt. Pratapgarh (Length 0.1.60 Km.) in year 2023-24 (4)
Constrction Box Culvert 6Cell 3x3 mtr span-aapproch road work of Nagria Fatehpur near Old bisalpur road on devha river bridge channage 1-323 to 1-391 work
Construction of 3x3 M Span RCC Box Culvert and Appraoch Road at Barsati Nala on Madhoganj Nayagaon Road to Kursath Nagar Panchayat Link Road at Ch 2-400
Construction of 3x4 M Span RCC Box Culvert and Appraoch Road at Barsati Nala on Madhoganj Nayagaon Road to Kursath Nagar Panchayat Link Road at Ch 3-200
Reconstruction of 3x3 meter Triple cell RCC Box Culvert in place of damaged bridge on Drain at Km 1 of Chhaprawat Kota Sanota link road in Bulandshahr district
Construction of 3x2.00 Meter Span Box Culvert in the Place of Mahmoodpur Sahjaniya Link Road Km. 03 to Village Natthapur Road In Distt. Shahjahanpur. (Fin Year 2025-26)
Janpad Moradabad mai Moradabad-Tanda-marg par chinhit black spot doongarpur evam sankari puliya ke sthano par new box culvert ka nirmaan kariye par road sinage ka kriye
Construction of 3x3 Mtr span 2 cell box culvert, approach road and additional approach road on Raipur Malihabad Road to Sedha road on Kadula River in Distt Bijnor
Construction of 3 cell box culvert of 5x5 meter at km 3 of Ramkola link road in District Gorakhpur in FY 2025-26 LOT No 2 of 2
Construction work of 03 cell RCC box culvert of 4x4 meter span on local drain at Km. 1 of GGIC Bhadaiya to Gautampur link road in Sultanpur district
Constrction Box Culvert 5Cell 3x3 mtr span-aapproch road work of Nagria Fatehpur near Old bisalpur road on devha river bridge channage 1-056 to 2-111 work
In Year 2025-26 Special repair work Construction of Laghu Setu on Umari-Pahthrahi-Jagammanpur to Kanjausa road in km 24 to 26 (4x4) 3 cell Box Culvert
CONSTRUCTION OF SHANICHARA RANIPUR MUDADIH ROAD (ODR) ON PULIYA NO-2/1 KE ASTHAN PAR KM.-2 IN 3X2X2 MTR. SPAN KI RCC BOX CULVERT WORK IN DIST.SANTKABIRNAGAR
Kohdaura se sohna chitahi marg ke km 02 and 07 me damaged puliya ke sthan per 2x2 mtr span ke 02 no. RCC box culvert ka nirman karya.
Construction of 2x6x6 mtr box culvert and approach road on the local drain located in km 27of Salempur Bhanmau Jaidpur Safderganj Badosarai road (MDR-100C) in district Barabanki.
Construction work of 5 Mtr. RCC Box Culvert, Approach Road and Addition Approach Road and Safety work of KM 1,7,9 at PMKSA Road in FInincial Year 2024-25
Construction work of 5x 6x4 m RCC box culvert in place of damaged dip located in km 1 of Kodari Bela Shesh Part link road in Balrampur district
Construction work of 9x 6x4 m RCC box culvert in place of damaged dip located in km 3 of Semri Mode to Khairhania link road in Balrampur district
Construction work of 4x6x4 m RCC box culvert in place of damaged dip located in Km 1 of Sekhia Jeonar link road in the financial year 2020-21
Janpad Siddharthnagar me hasudi aausan pwd road se sulehwa ke beech missing link marg per sthit parasi nale per 5x4x4 mtr span ke box culvert ka nirman karya
Construction of 1x6 m span box culvert over Akbar Ali Katra Nala at Barabanki- Zaidpur-Sidhaur- Deviganj-Subeha road MDR-99 C in km-20 in District-Barabanki.
Janpad Maharajganj me Gram Bhagwanpur Amahwa Jharuta ghat par Seu 5x5x5 M Box culvert pahuch marg awam Atirikt pahuch marg ka Nirman Kary Lot No 1 of 1
Construction of 5x6 M minar bridge over Sasur Khaderi river at Chainage 6.500 (between Arka-Paksarai) of Myohar Khas-Arka Fatehpur-Kaju road in district Kaushambi. (Box Culvert)
Construction of 5 cell box culvert of 5x5 meter in Km 4 of Sonaura Dumariya Road in District Gorakhpur in FY 2025-26 LOT NO 1 of 2
Construction of 2x6x 4 m RCC box culvert in place of the dilapidated and Sakri dip / culvert in km 1 of km-22 from Belha Gaura Itwa Marg (other district route) to Ambernagar link road in district Balrampur.
Anti erosion work from Pure surdas to PWD store in 800m length with 2 No. Box culvert (3x2 m), 1 No Pipe culvert 1.20m dia and interlocking road at the left bank of river Ganga for Mahakumbh 2025.
Construction work of paved road from Gram Sabha Bangai Badki Mai Sthan to Saraiya Bassthan and 2 cell box culverts of 3x3 in Gorakhpur district under the state plan in the financial year 2025-26 LOT No-1 of 2
Patna Jiginiya Causeway Link road
Construction of V.R.B. (R.C.C. Box Culvert) at km. 15.300 of Nakahi Dy.
Widening Extension of RCC Slab culvert 1x5.0mx5.50m in chainage 416.700 LHS 1x5.2mx5.50m in Chainage 417.190 LHS 1x2.6mx2.00m in chainage 419.300 Both Side of NH 91 in the State of Uttar Pradesh.
Construction of Kodra se dhadhaila se Anant Bahadur Singh ke ghar ke samne huye Bahuchra Inter College tak road and slab culvert under Rajya Sadak Nidhi in year 2021-22 (2)
janpad sankabirnagar me nahardeeh se oniya hote huve githani tak marg par 2x6x4 mtr span ke box culvert ka nirman karya
Construction work of 1-4 m (4 m height) box culvert at km-1 of Basaria road from Kulpahar Naugaon road to the remaining part of Rajauni road (Kudai)
Construction work of 3/33/0 box culvert and aproach road in km 3 of Dhaulahedi Dudhgarh Narayanpur Gurjar road from km 5 of Chilkana Gandevad in district Saharanpur.
ReConstruction of V.R.B. (Box Culvert) in place of damaged V.R.Bs. at Km 2.615, 3.279, 8.648, 9.770, 10.458, 13.274,15.468, 17.699, 22.828 and head regulator at Km 0.000 of Amausi Dy.
Reconstruction work of a small bridge (RCC box culvert) of 3x6 rate system in place of the dilapidated arch bridge located at Km. 9 of Jahogirabad-Ahar road (ODR)
In the financial year 2025-26 Construction work of box culvert in place of narrow and damaged bridge at Km 5 of Kakripur to Kirthal road in Baghpat District
New construction of 3x5x3 mtr Box Culvert, Approach road and Additional Approach road at Arind River on Bhopatpur road to Pipahara Road in district Etah under FY 2025-26
Construction of 5x6x4 m RCC box culvert in place of damaged dip at km-13 of Maharajganj Rupnagar road in km-13 of Lalia Maharajganj (ODR) in Balrampur district
Construction work of Mednipur Yuvrajpur Rampur Revatipur road par km 11 me 6.00 m span 03 slab puliya and km 1 me 3x3 mtr 1 cell ka box culvert
Construction work of 2 x 2 m span RCC box culvert at Km 2.00 of Mahadev Ghurhu to Bhavpur Pakri Pathan Dumariaganj Dhebarua road (other district road) on BTIB
Janpad Ambedkar nagar me vidhansabha Alapur ke antargat Rajesultanpur Garhawal marg ke km-8 me Pikiya Nale par (7x5.00M Span) Ke Box Culvert avam Pahunch marg ka nirman Kary.
Construction of Approach Road and 2X5 Meter Span Box culvert of NH-2/19 to Patari Durwasha Rishi Ashram Nigohi Baraur Gudgao Road in Km. 6 in Kanpur Dehat
CONSTRUCTION WORK OF A 3 X 5 X 3 BOX CULVERT IS UNDERWAY AT THE LOCATION OF THE NARROW BRIDGE OVER THE GADRA DRAIN ON THE HASTAM CONNECTING ROAD
Construction of RCC Box Culvert (5x5x5M) Approach and Additional Approach work at Ch 0-000 of Ramgarhwa Pul to Dagarupur link Road under Rajya Yojana (Lot No-7/7)
Construction work of 2x2 meter single cell box culvert at km-1 of Nangla Sanota to Pinai road and CC road and drain construction work in Kunda Aabadi area
Year 2025-26 Under SR Construction of Box culvert at Lodhipur Madhan Tanda Asmoli road (ODR) and Construction of CC road and drain in Madhan and tanda Abadi portion.
M/o Drain (Maintenance of drain and RCC Box culvert work at 45m. wide road from Kent R.O. Sector-87 to Sec-83 Metro Line along Sector-83,84), Noida
Construction of Roads, RCC Drain and RCC Box Culvert in Phase-3 and approach road with RCC drain along D type Plots in Phase - 1 sector- 23, GIDA Gorakhpur
Construction work of Dabba pul (Box Culvert) and Approach road of Bridge over Qila river between of Bakerganj dauli raghuvar dayal in distt. Bareilly in Financial Year 2020-21