Loading…
Loading…
7,010 results • Best match
Construction of 3x4.00 mtr span minor bridge (RCC Box Culvert) in place of damaged/narrow minor bridge at Km-09 on Haiderpur Maltinpur Parsehramal Firozpur road
Janpad Bhadohi me Gyanpur Asnav Babhnouti marg (ODR) ka km 5 me sthit kshatigrast puliya ka sthan par 3x3 meter span box culvert ka nirman karya
Construction of 3x6 Mtr. Span RCC Box Culvert, Approch and Diverson at Hetmapur- Suratgang-Shudiyamau-Shihali road in Km.1(ODR) in Block Suratganj Distt Barabanki.
WARD NO. 12 ME MUBARAKPUR ME MISHRA JI KE GATE KE SAMNE CHHATIGRAST PULIA KE ASTHAN PAR 1x2.00x2.00 MTR. RCC BOX CULVERT PULIA KA NIRMAN KARYA
Construction work of RCC box culvert of 2 x 2 m span from Km-66 of FNBS to Km-1 of Singhorwa road to Chandwa road.
BEHSUMA CHANDPUR THAKURDWARA JASPUR SH 147 ROAD KM 111 PER STITH KHALIYA NADI PER SANKRA PUL KE STHAN PER NAYE LAGHU SETU BOX CULVERT NIRMAR KARYE
Construction and protective work of RCC box culvert at Km 4 of Kandhesidhar link road from Udi Chakarnagar road in Chakarnagar development block of Etawah district
Construction work of small bridge (box culvert) at Km-106 (Change-105.250) of Firozabad Fatehabad Saiya Kheragarh Kirawali Bharatpur Border Road (SH-143) in Agra district
Widening and Strengthening and Construction of R.C.C Drain and Box Culvert On Delhi NittiPass Road) Km1.00 (Gupta Resort to Velhna Chock and Km 9.00 to Km11.600)
Construction work of RCC box culvert (Minor bridge) of 5 X 5 m span in km 4 of Bangra to Chandwari Link Road in Jhansi district.
Special Repair ofJaugarh Pitch Road to Jogani Link Road Km 1, 2, 3 and Construction of 2x3.00x3.00 Meter Box Culvert Year 2020-21 in Distt. Shrawasti
Construction of 5 cell box culvert of 5x5 meter on Ghonghi nala near Gerui in District Gorakhpur in FY 2025-26 LOT No 1 of 2
Godila link road to Shivpur Prathmik Pathshala chauhan and Rajbhar basti ke madhya Nale par Box Culvert, Approach road and Additional Approach road in District Jaunpur
Construction of Pratapgarh Dilippur Jamtali Jagnipur (ODR) Road ke Jargoiya Nala per 2x5.0 Meter Spawn RCC Box Culvert, Pahunch Marg evan Surakshaatmak Work in District Pratapgarh
Construction of Box Culvert 3x3 mtr Span of 2 cell and approach road at Dhampur Noorpur Road to Madhi road via Eidgah road at Ekra Nala.
Reconstruction work of 1x6 mtr span box culvert at Km 1 of Mursaina Azimnagar Milkkhanam road to Khimautia Bakhti via Alinagar Sumali road in Rampur district.
Construction of a 2x4 meter span box culvert in place of the dilapidated small bridge at kilometer 12 of the Baraulia Manmatipur Kouhar other district road
janpad Deoria me Karamtar se Barasaili ke km 2 me stith Kshatigrast Arch/puliya ke sthan par naye box culvert evam pahuch Marg ka Nirman Kary
Construction work of 03 cell 4x4 meter box culvert, small bridge, approach road, additional approach road and protection work in place of arch culvert located on Gutaiha road from Pilibhit Vasti road in district Pilibhit
Construction work of box culvert in place of 6x6m span in place of old arch culvert destroyed by flood/excessive rain located at chainage 0.025 km of Azamgarh Asut-Mirzapur- Mahul Belwai Road (MDR-158E)
Construction of 2 32 0 box culvert and access road in place of damaged and narrow culvert at km 36 of NH 73 new NH 344 to km 21 of Sarsawa road via Gagalhedi Saharanpur
Construction of C type 20 Nos. shop, Auction platform 01 Nos. (9x40) Civil and shade work, Development work, Internal road, Crossing culvert (04 Nos.) RCC box culvert Nala (0.9x0.9) water stand post SMY Unchahar Raebareli.
Construction of box culvert at k.m. 4.505 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction of box culvert at k.m. 4.355 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction of box culvert at k.m. 5.070 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction of box culvert at k.m. 4.930 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction of box culvert at k.m. 5.225 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction of box culvert at k.m. 6.800 of airport right drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district
Construction of box culvert (4.0 multiply 3.0 M.) at km. 2.615 of Mandawar Dy. In place of damaged V.R.B. in distt. Bijnor (Year 2022-23)
Construction of box culvert at k.m. 0.045 of chandpur harbansh drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Construction work of box culvert and access road at 3/65/0 in place of 8/1 damaged narrow and RCC culvert in km 0-8 of Daulatpur Nanauta Mangalore (SH-167) road in Saharanpur district.
External Development of Road, drain and culvert of Sector-75, 76, 77, 78 and 79 (C/o RCC box culvert at 45M wide road between Sector-113, 80, 81, and Sector-79 near Metro line), Noida
Construction work of 2/32/0 RCC box culvert in place of the damaged narrow culvert at km 20 of Sarsawa road from Km. 36 of old NH-73 (new NH-344) to Gagalhedi via Saharanpur.
Construction of 2 x 2 meter span RCC box culvert in place of damaged culvert at Km-1 from Roinihwa to Baghi Nepal border via Mahadev Railway Station and construction of drain at Km-2 (150).
Construction work of a 5x5 meter RCC box culvert in place of the damaged bridge located at km 2 of the Guwawan-Sampatipur road in Amethi district.
Construction work of 5 X 5 X 5 m span box culvert on Majhne drain between Pakdi Mahulia road odr and Ahirauli Jolhapur ODR in Kushinagar district
Construction work of 5x4 m span RCC box culvert and 1-90 km additional approach road on Samaspur drain in the middle of village Samaspur Kanhaua road
Construction of 4x6 m Span RCC Minor bridge (box culvert) and approach road of Mahulara Marg km-2 to Tulapur Shau ka Purwa link road Km-2
Construction of 1x6.00 Mtr. Span RCC Box Culvert, Approch Road on local nala at Teergaon Sarefabad Banki Tindola Chhidwahi Behta ODR Road KM-30 in Distt. Barabanki
BEHSUMA CHANDPUR THAKURDWARA JASPUR SH 147 ROAD KM 102 PER STITH JABDI NADI PER SANKRA PUL KE STHAN PER NAYE MAGHU SETU 1/85/0 BOX CULVERT
New Construction of 4x4 M 5 Cell Box Culvert Protection work Approach Road on Nala at Katiya Mazra link road in Distt. Shahjahanpur Fin. Year 2025-26
Construction of 4x4 mtr span 6 cell box culvert and approach road in place of damaged wooden bridge on Kohli Farm Nala in Village Navalpur Link Road
Janpad Chandauli me Chandauli Chakia marg ke Km 4 me Navahi ke pas Kshatigrast puliya ke asthan par 4x4x3 m span ka box culvert ke nirman karya
Construction work of 03 cell RCC box culvert of 2x2 meter span on local drain at Km. 1 of Sadhapur (Lohia Samagra) link road in Sultanpur district
Construcation of RCC Box Culvert 3X3x3 Meter span and Protection Work At Approach road of Pashu Maha Vidyala road in Distt Gorakhpur Lot No 1 of 1
Construction of 3x3 Mtr Span 2 Cell Box Culvert and Approach road at Ekda Nala in KM-01 of Nindru Athai Meemla Road (ODR) in District Bijnor
Construction work of 7x5 M Span RCC Box Culvert on Sukhta Nala in Km-4 of Chimna Nasauli Damar road in District Hardoi in F.Y. 2025-26
Construction of 3x4 M Span RCC Box Culvert and Appraoch Road at Irrigation Nala on BUA Road KM-10 to Ghanghaiya Link Road at Ch 1-500
District Ghazipur me Gahamar Shayar bareji rajmal sewarai road ke km 10(800) me Kshatigrast puliya ke sthan par 1x6x3 mtr ke box culvert ke Nirman kary
Strengthening of Road (Raising of Road, C/o RCC Drain and Box Culvert from Plot No B-191 to B-208A both sides road Phase-II) Noida