Loading…
Loading…
7,010 results • Best match
In the financial year 2025-26 under special repairs in Moradabad district the work of repairing the damaged RCC slab culvert on the Akbarpur Sihali Nanda road from Shahbad Pipli road damaged due to floods and heavy rains
Balu Mazra Lotni se NDM tak via mora marg ke km 1 va 2(800) mai vishesh maramat evam Km 1 mai satigrast puliya ke sthan par box culvert ka nirman karya
Zone-1 Hive Room No.-43 from four culverts in Foundry Nagar to K.K. RCC till Nagar Basti culvert. Construction work of drain.
Zone-1 Hive Room No.-43 from four culverts in Foundry Nagar to K.K. RCC till Nagar Basti culvert. Construction work of drain
Laharpur Tambaur Road (MDR-83C) km 10 to Ramrudha(Rampura) Link Road km 1 Damaged Culverts on 1x4.50 Mtr Span RCC Culvert work
Construction of Causeway at Km. 4.200 of Kusanda Minor.
Construction of causeway for Pasinpurwa link road.(SPECIAL REPAIR)
Special repair work of Causeway at Purvinpurva link road
Construction of 1x2 m span RCC Culvert at damaged puliya and Approch Road, Repair of Causeway, Ramp at Bhelsar Tikaitnagar Road to Ranimau Barinbag via Kothari Gauriya Road (ODR)
Construction of 3x5 M Span RCC Box Culvert at Gram Bandi tola Belashpur South over Hirne Nala Main Approach Aditional Approach and protection work in year 2025-26 in District Mahrajganj Lot No 1 of 1
Janpad siddharthnagar me DC ghaat se tahsil mukhyal hote huve regharwa jakhauli arani hokar bewa utraula road ke km-5 me chhatigrat puliya ke asthan par 1x6 mtr span ki RCC box culvert ka nirman karya.
Work No.23 Under 15th FC Ward No 12 me Vidhya Nagar Colony ko jaane wale mukhya marg par sthit Rajwaha Crrosing par purani nichi v kshatigrast puliya ko todkar RCC Box Culvert dwara punarnirman karya.
Construction of 2 x 3 M Span RCC Box Culvert at Sohagi Barwa link road in Km. 1 with Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 2 of 2
Construction of 3x6 M Span RCC Box Culvert at Bhuvana Kaptanganj road on Medanipur Jarjar and Sakare ke Sthan par Main Approach and protection work in year 2025-26 in District Mahrajganj Lot No 02/02
RECONSTRUCTION OF VRB (RCC BOX CULVERT) AT KM. 7.745 OF RABHA DY., KM. 3.979, 0.220 OF ABDULLA NAGAR MR., KM. 4.020 NAYAGAON MR., KM. 4.500 OF MANDWA MR. AND KM. 4.481 OF RAINGAI MR. (Lot-11)
Construction of Block-Gilaula me Lengdi Gular se via Nasirganj Dikauli Road (ODR) ke Km.-16 me purw Nirmit Damage Puliya ke asthan per 3x4x3 mtr. Span RCC Box Culvert Year 2025-26 in District-Shrawasti.
Construction of 3x7x5 meter span Box Culvert, Approach Road and Additional Approach in place of narrow and damaged minor bridge on Gangi River at Km-3 of contact road from Itahara via Satmesara to Baburam house
Construction of a Minor Bridge Box Culvert with a 3x3x3 m Span and Approach Roads replacing the old dilapidated bridge over the Manday Nala near the Amar Shaheed Rajendra Nath Lahiri Memorial under the Chavani Sarkar
Construction of a 2x4m span box culvert to replace the narrow and dilapidated minor bridge situated over the Amethi Distributary at the 10th kilometer of the Barauliya-Manmatipur-Kauhar road Other District Road in Amethi district.
Construction work of box culvert of 1 X 4 X 2.50 m and 1 X4 X3 span respectively in place of the damaged culvert constructed earlier on the barsati drain from ch- 0-950 km and ch- 3-50 km of Dhuantikar Bandhwa Sekhui Suryanagar road in Dist Kushinaga
Year 2022-23 Gram Panchayat Aasmanpur me Harera Nale par Pathakpurwa jane wale marg par Causeway nirman karya. (Block Mahsi) (17 dar ka Causeway)
Repair of 900 mm dia Hume pipe culvert Parapet (4 Row) Haidergarh road to Motipur (Bhogla Menahuwa) link road in km-2
RCC drain work from Kailash culvert to Balmiki (Holi) culvert in village Sauram Garhi (Alhadadpur).
Work No.-05 Under 15th FC - Ward no 12 me Anand Vihar Colony ke raste par (Madhusudan Flat ke pass) sthit Rajwaha Crrosing par purani nichi v kshatigrast puliya ko todkar RCC Box Culvert dwara punarnirman karya.
construction work of 2/33/0 box culvert in place of the damaged mini bridge on Saharanpur Badgaon road km 4 via Dehri border via Malhipur Sherpur Gurjar Fatehpur Gurjar Kankarkui Chandanpur Nalhera road In Saharanpur district.
Financial Year 2019-20 under Rajya Yojna- Const. of RCC box culvert (3x6m) span in Kaluia River with both side approach road in between Chaddha Paper mill to Kartarpur Sua Nagla Road and Khanpur road Km.11
RCC box culvert of 8.5 and 5.00 m height, approach road, additional approach road and protective work on Kalyani river near Madhapur at Km-2 on Tejapur to Katri Alipur via Madhapur link road in Unnao district.
Construction work of Box Culvert of 3 X 6 Mtr Span in place of the previously damaged mini bridge on Majhane Nala at Km-27 of Gorakhpur Pipraich Kaptanganj Naurangiya Road in Dist Kushinagar FY 2023-24
Construction work of 5x5 two cell box culvert at Km 0-3 of Maharajganj to Kudriha Bandha link road in Gorakhpur district under the state plan in the financial year 2025-26 LOT NO 2 of 2
Construction of 2 x 1000 dia Hume pipe culverts in place of damaged culverts No. 12/1 and 12/2 on Dhourra Balabehat Road (O.D.R.), repair of parapet and construction of return wall on damaged culvert No. 9/1.
Construction of RCC Slab Culvert Mo. Ghosiyan Ward 20
CONSTRUCTION OF WATCH TOWER AND CAUSEWAY IN BANKATWA AND TULSIPUR RANGES OF THE SOHELWA WILDLIFE DIVISION
Special repair work of damaged causeway in Taparia link road
Reconstruction of Causeway at harewali Kuankhera road in Km 14
Repair of Causeway at Bansgaon Link Road Under SR Yojna
Special repair work of damaged causeway in Laraun link road
Construction of Hume pipe culvert and boundary wall in low-land for proposed MRF site on east side of Mahul-Ambari main road.
Reconstruction of 3.00 X 5.00 X 5.00 meter span RCC box culvert and approach road in place of the previously constructed narrow/damaged bridge on Non River Jagdishpur to Bhainsau road under Shivrajpur block in District Kanpur Nagar
Work No.-02 Under 15th FC - Ward No 12 me Samar City tatha Pink City ko jaane wale mukhya marg par sthit Rajwaha Crossing par purani nichi v kshatigrast puliya ko todkar RCC Box Culvert dawara punarnirman karya
Janpad Maharajganj me SNG km-18 par Bhaisahiya via Kaulahi Narkataha Mark ke Km 1 me Chhatigrast Puliya ke Sthan par Laghu Setu 3X3X3 m Box culvert awam Pahuch marg ka nirman karya Lot No-1 of 1
Construction work of 3 X 5 meter span box culvert in place of the previously constructed damaged small bridge on Bettiah drain at km-2 of Bhiura link road via ITI from Kaptanganj Pakriya part in Kushinagar district
Construction of a 3x3 meter span RCC box culvert in place of the narrow and damaged small bridge on the Aurangabad Rajwaha canal at kilometer 5 of the Tikra Baijnath Karthuni Lalganj Dadra Gajnpur Duwariya other district road
Remaining construction work of culvert in village Keshari.
Loha Mandi Zone Room No. 30 Construction of culverts at various places near Shankargarh culvert, near Mali Charan Clinic and Faran General Store in Balajipuram.
Construction work of box culvert on the scrap coming on 45.00 m wide Atal Marg road under Transport Nagar Yojna, work of laying DBM on part-B of Atal Marg and BC on part-A, B of Atal Marg.
Construction work of two cell box culvert of 3x3 m on South Fulwaria Canal from Chhota Tola of Gram Sabha Nakin in Gorakhpur district under the state plan in the financial year 2025-26 LOT No 3 of 3
Repair work of RCC box culvert, approach road, additional approach road and protective road in place of cutting of flood damaged parts at kilometer 2 of Mataina to Ghungchai link road from Puranpur Diyoria Kalan road in Pilibhit district.
Design and Construction of RCC Box Culvert Approach Road and Additional Approach Road in Place of the Narrow Minor Bridge located at Mari Mata Temple at Km10 of Lucknow Sultanpur Road in District Lucknow Uttar Pradesh on EPC MODE
As per Tender Notice
BOQ