Loading…
Loading…
4,871 results • Best match
Restoration of Irrigation System for effective water regulation including Monitoring and Management SG Shuttering Arrangements to Division Dam of Jodimadumulu near Rajagopalapuram (V) in Payakaraopeta (M) of Anakapalli District
Replacement of Rebabbitted Turbine Guide Bearing, Carbon segment seals, Labyrinth seal and fabrication of shaft seal cooling water pipe line for Unit I and II at Dam Power House
Annual maintenance of spillway Radial Gates of Sri Penchikala Basi Reddy Chitravathi Balancing Reservoir Dam site near Parnapalli village,Lingala mandal of Y.S.R Dist for the year 2021-22
Operation & Maintenance of Dam and appurtenant works of Yogi Vemana Reservoir Project near A.B.Palli Thanda (V) in Mudigubba (M) in Sri Sathya Sai (Dist) for the year 2022-23
Construction of Compound wall to safeguard TB Board land in Maruthi Nagar and Medical Officer Quarter (A type) and Providing Cross Drainage, pavements in official colony at TB Dam.
Annual Maintenance of Gallery and supply of watch and ward at top of Kalyani Dam near A.Rangampeta village of Chandragiri mandal in Tirupati District for the year 2025-26
Construction of Road dam from Gollalaguduru to Gotur road at Mallikarjuna Reddy field in Gollalaguduru (V&GP) of Vemula Mandal in YSR Kadapa District, Estimate Cost Rs.10.00 Lakhs.
Providing Road Dam on the Road from Atchavelli to Jalaparthi Road near Local vanka at Atchavelli GP of Pulivendula Mandal of YSR Kadapa District, Est. cost Rs.37.50 Lakhs.
Operation & Maintenance of Dam and appurtenant works of Yogi Vemana Reservoir Project near A.B.Palli Thanda (V) in Mudigubba (M) in Sri Sathya Sai (Dist) for the year 2022-23
Manufacturing and Supply of 2 Nos Throat Ring Liner Plates, repairs and reconditioning of 20 nos of Wicket gates and its shafts of Unit III of Dam Power House
Operation & Maintenance of Dam and appurtenant works of Yogi Vemana Reservoir Project near A.B.Palli Thanda (V) in Mudigubba (M) in Sri Sathya Sai (Dist) for the year 2022-23
Construction of Compound wall to safeguard TB Board land in Maruthi Nagar and Medical Officer Quarter (A type) and Providing Cross Drainage, pavements in official colony at TB Dam.
Re-babbitting of 01 No. damaged Turbine Guide Bearing (Shell type in two halves) using IS 25 Grade 84 Tin based babbit material for Unit3 of Dam Power House
Re-babbitting of 01 No. damaged Turbine Guide Bearing (Shell type in two halves) using IS 25 Grade 84 Tin based babbit material for Unit3 of Dam Power House
Removal and ReConstruction of Damaged Revetment duly Providing the Lateral Toe Walls on U S below + 73.000 M berm level from Km.9.000 to Km.9.520 of Kandaleru Dam
Providing Pipe culvert and road dam on the road from Yannapalli to Kondavandlapalli in Yerrabommanapalli (V&GP) of Chakrayapeta Mandal in YSR Kadapa District, Estimate Cost Rs.11.00 Lakhs.
Manufacturing and Supply of 2 Nos Throat Ring Liner Plates, repairs and reconditioning of 20 nos of Wicket gates and its shafts of Unit III of Dam Power House
Annual Maintenance of Charged Establishment at Gandikota Dam site, GNSS Main Canal Km.23.926 in Kondapuram Mandal of Kadapa district under daily wages basis for the year 2022-2023
AME for Operation and round the clock shift duties at 33/11KV HT substation, GG dam park in Tirumala and attending for emergency breakdowns for the year 2022-23
Leasing of Project Restaurant Opposite to TB Board Official Colony, Main Entrance beside MST Function Hall in Amaravathi (V), Hosapete (Tq.), Vijayanagara (Dist.) at TB Dam on PPP Model.
Removal and Re-Construction of disturbed dry rubble stone revetment on U/S below berm level from Km.8.00 to Km.9.520 of Kandaleru Dam Nellore SPSR Nellore District
Collection of red soil and miscellaneous plants to development of Meridian from GGB Dam Checkpoint to Parvetmandapam (1.50 KM) Phase-I in Papavinasam Road, TTD, Tirumala in GGB Range
NEERU CHETTU CONSTRUCTION OF GATED CHECK DAMS WITH FIBRE REINFORCED SHUTTERS ACROSS THE AADAVI MANU KUNTA VAAGU NEAR S.R.PURAM VILLAGE, CHINA VAAGU NEAR S.R.PURAM VILLAGE, DONDAPANDU VANKA NEAR S.R.PURAM VILLAGE, MADYAGUMPU VAAGU NEAR S.R.PURAM VILLAGE, POOLA CHERUVU VAAGU NEAR DEVAMMACHERUVU VILLAGE AND RAMKUBAVI VAGU NEAR S.R.PURAM VILLAGE IN S.R.PURAM MANDAL OF SPSR NELLORE DISTRICT(Item No.8)
NEERU CHETTU CONSTRUCTION OF GATED CHECK DAMS WITH FIBRE REINFORCED SHUTTERS ACROSS THE NALLAVAGU NEAR VELIGANDLA VILLAGE, LOCAL VAGU NEAR ISKADAMERLA VILLAGE VOTIGUNTA BADAVA VAGU NEAR AUDIMURTHYPURAM VILLAGE, BOMMOTLA VAGU NEAR JANGALAPALLI IN KONDAPURAM MANDAL AND PALLAVAGU NEAR CHAKALAKONDA, NERELLAVAGU NEAR THAMIDAPADU AND THURPU VAGU NEAR UTTUKUR IN VINJAMUR MANDAL OF SPSR NELLORE DISTRICT (Item No.10)
Neeru Cheetu CONSTRUCTION OF GATED CHECK DAMS WITH FIBRE REINFORCED SHUTTERS ACROSS THE RALLAVAGU NEAR YERUKULAREDDYPALEM VILLAGE, BANKA VAGU NEAR PADAMARA GUDLADONA VILLAGE BADAVATHOTA VAGU NEAR VEERA REDDYPALEM VILLAGE DAKSHNAPUVAGU NEAR THIMMAREDDYPALEM LOCAL VAGU NEAR PEDDA ANNALURU VILLAGE, LOCAL VAGU NEAR KAVALIMISTAPURAM VILLAGE, MIDATHA VAGU NEAR KRISHNA REDDYPALEM VILLAGE IN KALIGIRI MANDAL in SPSR Nellore Dist (Item No.7)
Construction of Head regulator across kundu river, excavation of flood flow canal from kundu river near Nagarajupalli village of Peddamudium Mandal to Penna river near Peddasettipalli village of Proddatur Mandal in Kadapa District including ... subsurface dams across ...
NEERU CHETTU CONSTRUCTION OF GATED CHECK DAMS WITH FIBRE REINFORCED SHUTTERS ACROSS THE NALLAVAGU NEAR VELIGANDLA VILLAGE, LOCAL VAGU NEAR ISKADAMERLA VILLAGE VOTIGUNTA BADAVA VAGU NEAR AUDIMURTHYPURAM VILLAGE, BOMMOTLA VAGU NEAR JANGALAPALLI IN KONDAPURAM MANDAL AND PALLAVAGU NEAR CHAKALAKONDA, NERELLAVAGU NEAR THAMIDAPADU AND THURPU VAGU NEAR UTTUKUR IN VINJAMUR MANDAL OF SPSR NELLORE DISTRICT (Item No.10)
Rerouting of 11 KV line in PLC passing over houses to front side of ICE Plant, strengthening of LT line in PLC area for all existing 250 KVA Transformers, Numbering of HT and LT poles and painting of code numbers to DTS under dam jurisdiction and ... TBHES,TB Dam
Providing Temporary Illumination arrangements to Pushkaraghats in Kurnool district for 12 days on eve of Tungabhadra Pushkaram 2020 for the period from 20.11.2020 to 01.12.2020. (i.e.,1. Gangamma Temple of Gundrevula (V) and 2. U/s of Sunkesula ... Sunkesula barrage , ...
Sand blasting and painting of radial crest gates, Scour sluice and Head sluice, 20 Ton Gantry crane, 60 Ton gantry crane including fabrication, supply and erection of walkway bridge @ Trunion level of Sri Kotla Vijaya Bhaskar reddy Barrage (Tungabhadra) near sunkesula village in Kurnool District
Restoration of Bund on U/s of Pickup weir and drainage Improvements to Pinneru Vagu Pickup weir at Sankranthipalle Village, Rapur Mandal of SPSR Nellore District.
Improvements to Kurapalli Anicut in Kurapalli(V) in Padmanabam (M) of Visakhapatnam District.
Improvements to Kanamam Anicut in Kanamam(V) in Anandapuram (M) of Visakhapatnam District.
Improvements to Krishtnapuram Anicut in Potnuru(V) in Padmanabam (M) of Visakhapatnam District.
Improvements to Balaramnaidu Poonu Anicut near Banjerupeta Village Palasa mandal of Srikakulam District
Impts. to Chandrayya Tank (Boyedu Tank) Cascading System of repairs to Slab Culvert and Dividing Dam of Nagiri Tank (Bopyedu Tank) in Billimilli (V) limit of Koyyalagudem (M) in W.G.Dist.,
Supply and fixing of GI chain link mesh for temporary Q-lines in view of Vaikuntaekadasi from GG dam to Batagangamma temple (via kalyanavedika, seva sadan compound , Thiruvenkatapadham at Tirumala
Replacements of rubber seals, bolts and nuts to service gate No. 1 to 5 of Annamayya Project, Dam site , Badnagadda (v), Rajampet (M), Kadapa District for the year 2016-17
Emergent Repairs to road from Km.13/8 to 14/2 of Anantapuramu - Bellary road (R&B) connecting to P.Kowkuntla (Via) Jellipalli, PABR dam road in Anantapuramu District (2nd call)
Providing machinery such as Hydraulic Excavator and Tractor on hire basis for removing illegal pipe lines etc. in HLC No.1 Section, TB Dam for the period of two months.
Improvements to the water discharge conveyance system by replacing existing damaged old discharge conveyance lines including its related materials (Motors, cable ,stators etc) in dam galleries of NSRSS Srisailam Project
Repairs to Improvements to Existing Check Dam across Tududagedda R/s Channel Ch 0.00 Km to 0.15 Km near Patha Bishnumguda Village Pedalabudu Panchayat Araku Valley Mandal of Visakhapatnam District
Special Repairs for road safety interventions from km.13/6 to 14/8 of Anantapuramu to Bellary road (R&B) Connecting P.Kowkuntla (via) Jellipalli, PABR Dam road in Anantapuramu District.
CONSTRUCTION OF CHECK DAM ACROSS VOORU KALAVA BESIDE R RAMANA REDDY LANDS OF NAGULAKUNTA H/O OF V R AGRAHARAM GP IN YERRAVARIPALEM MANDAL OF CHITTOOR DISTRICT ITEM NO 03
Imtps. to Ava Tank to Kurukuru Dam Cascading System of repairs to slab culvert and Gravelling of Gandi tank surplus cource in Yernagudem (V) limits of Devarapalli (M) in W.G.Dist.,
Construction of Public Toilet Blocks at various places in PPV Dam sub-Division covering the area of car parkings at Kousthabham R.H area HT Shopping Complex RBRH Bus stand Tirumala
Impts. to Hukumpeta to Ramakoneru tank Cascading System of repairs to 2 Nos Pllapai Check Dam of Pallapai Channel Cascading system in Saripalli (V) limits of Koyyalagudemd (M) in W.G.Dist.,
Providing Guide walls and strengthening of banks under Yallur Dam Cannel(Gurrappa Chanu) under R/Side Sub-Minor Channel of km 0.000 to 0.120 near Yallur village in Gospadu mandal
Hire charges for arranging temporary illumination to the roads and buildings etc, in connection with Srivari Annual Brahmotsavams-2021 in ESD-K&P dam, Tirumala for the year 2021-22
Annual Maintenance of Charged Establishment at Mylavaram Dam Site in Mylavaram Mandal of YSR District under daily wages basis for six months during flood season for the year 2024-25.