Loading…
Loading…
4,871 results • Best match
Construction of CC Drains a) from Gundla Kamma Vaagu Dam to Kubra Majeedu in 7th ward b) Kubra Majeedu to Uppu Narayana House D.No. 17-107/42/12/4/2 in 7th ward in Atmakur Municipality
Construction of CC Drains a) from Gundla Kamma Vaagu Dam to Kubra Majeedu in 7th ward b) Kubra Majeedu to Uppu Narayana House D.No. 17-107/42/12/4/2 in 7th ward in Atmakur Municipality
Providing Semi Skilled workers in between Km.0/000 to Km.20/200 of Power Canal in HLC No.1 Sub Division, TB Dam for the year 2026-27 i.e., from May-2026 to February 2027
Supply of LT bushings for 10 . 6 MVA , 11 / 66 KV Generator Transformers (MAKE : ABB / Siemens / Toshiba or equivalent models suitable as per field conditions ( as per sample ) pertaining to outdoor Section of Dam Power House
Manufacturing, Supply and Testing of Runner Blade Guide Bearing Bush Assembly, Guide Vane Lever Assembly for the turbine as per Drawing or sample Provided and Polishing of Thrust Runner of Unit III of Dam Power House
Supply,installation,testing and commissioning of 960mm x 320mm and 4mm pitch outdoor LED ticker display boards for the work of Providing permanent queue lines upto GG dam circle along the outer ring road at Tirumala
Construction of Compound wall around the Sy.No.534 B/2 (Right side of Canal), Back side of Sy. No. 268B and opposite to NB Type Quarters in T-2 Section, TB Board, TB Board, TB Dam
O&M of Dam, Main canal and Distributaries from KM 0.000 to KM 38.121 of Sri. K.V.Rama Krishna (Surampalem) Reservoir Project for the year 2025-2026(from 01-06-2025 to 31-05-2026 (2nd call)
Manufacturing, Supply and Testing of Runner Blade Guide Bearing Bush Assembly, Guide Vane Lever Assembly for the turbine as per Drawing or sample Provided and Polishing of Thrust Runner of Unit III of Dam Power House
Supply of LT bushings for 10 . 6 MVA , 11 / 66 KV Generator Transformers (MAKE : ABB / Siemens / Toshiba or equivalent models suitable as per field conditions ( as per sample ) pertaining to outdoor Section of Dam Power House
Design, manufacture, assembly, inspection and testing at the manufacturers works, packing, loading & unloading, supply and delivery F.O.R (Destination) and Erection, testing and commissioning of 2MVA, 66/11KV, 3 Phase Station Transformer at TB Dam Power House
PIPHW Investigation, Preparation of Designs and Drawings and Execution of works of Scour Treatment, Construction of Parallel Diaphragm Wall including improvements to Degraded D-wall in ECRF Dam Gap I and Gap II L.S. Contract System.
Soil investigation for the proposed work Drilling of bore holes and extraction of UD soil samples also testing of UD soil samples in earth dam of Alaganuru Balancing Reservoir near Alaganur (V), Midthur (M), Nandyal District.
Providing Semi Skilled workers in between Km.0/000 to Km.20/200 of Power Canal in HLC No.1 Sub Division, TB Dam for the year 2026-27 i.e., from May-2026 to February 2027
AME Working Estimate for Replacement of Old Damaged Gi pipe line with new GI pipes in Right bank colony & supply of essential materials to WS and S section in V P South colony N S Dam
Construction of Vented Road Dam across Local Vanka for the Road from Velidandla to Bidinamcherla field Road near Gopal field of Velidandla (V&GP) of Lingala Mandal in YSR Kadapa District, Est. cost Rs. 40.00 Lakhs.
Improvements to Gauging Section of NSRS Srisailam Project
Improvements to 3 Nos of 1360 KGs capacity (OTIS MAKE) Elevators in 4th, 8th and 18th blocks of NSRS Srisailam Project
Improvements to the Instrumentation section of NSRS Srisailam Project
FDR-2025 - Repairs to Body wall and apron of Nallavagu Anicut near Narsireddypalli (V) Cumbum (M) Prakasam (Dt)
Providing private security at critical reaches for watch and ward for Khariff season in between km 0.00 to 40.00 of RBHLC of No.1 Sub Division, T B Dam for the month of August and September 2016.
Removing hazardous locations from Tower No.53 to Tower No.57 of 66KV T.B.DAM HAMPI DC line and Providing intermediate towers extension tower in Sanklapura village limits pertaining to Lines section, operation sub-division. TBHES, TB Dam
Preparation of 3D ornamental designs for the work of Hire charges for arranging temporary illumination to the roads and buildings etc, in connection with Srivari Annual Brahmotsavams-2023 in ESD-K and P dam,Tirumala(Part-B)
AME for Preparation of 3D, 2D ornamental designs during Srivari Annual and Navarathri Brahmotsavams and other Fairs and Festivals etc, in Srivari Temple connected areas in ESD-K and P Dam,Tirumala for the year 2026-27
APGENCO-NSTPD-Labour charges for carrying out the centering and bearing gap setting of generator (UGB and LGB),thrust bearing and turbine guide bearing pads for unit-2 at power house of Nagarjuna Sagar Tail Pond Dam.
Repair works of Anupu LIScheme on Foreshore of N.S dam near Chintalathanda village in Macherla Mandal of Guntur District -Arresting of leakages in Gravity mains & sub - gravity mains and Repairs of Electrical items (Transformer yard & panel board)
Procurement of Petrol Grass Cutting Machines, Chain Saw Machine, Blades, Nylon Trimmer wire and Other Accessories for Maintenance of the Outdoor Section and Factory Section of Hampi Power House and Outdoor Section of TB Dam Power House
Removing hazardous locations from Tower No.53 to Tower No.57 of 66KV T.B.DAM HAMPI DC line and Providing intermediate towers extension tower in Sanklapura village limits pertaining to Lines section, operation sub division. TBHES TB Dam.
Design, Engineering, Manufacture, Supply, Installation, Testing and Commissioning of Water Mist Fire Protection System for 4x9 MW Generators duly dismantling of existing old Co2 flooding system at Tungabhadra Dam Power House, Hospet, Vijayanagara District of Karnataka State
Hire charges for arranging temporary illumination to the roads and buildings etc, in connection with Srivari Annual and Navarathri Brahmotsavams and fairs and festivals etc, in ESD-K and P Dam,Tirumala for the year 2026-27
Hire charges for arranging temporary illumination to the roads and buildings etc, in connection with Srivari Annual and Navarathri Brahmotsavams and fairs and festivals etc, in ESD-K and P dam,Tirumala for the year 2026-27
Re-routing of 1000mm dia gravity main pipe line from Narava 42mld WTP to Vepagunta GLBR with 1000mm MS pipe line at 3rd and 4th lines railway crossing bearing Railway bridge No.1646 near MGR dam gates
Outsourcing of Operation, maintenance and shift works in Mechanical section of TB Dam Power House through outsourcing agencies by deploying semi skilled labours ITI holders, unskilled labours and LV Drivers for the period from 01.08.2024 to 28.02.2025
Providing protection arrangements on South side of 33/6.6 KV Sub-Station yard of Kandaleru Left Canal Lift Irrigation Scheme along the left bank of LLS Channel at KR Dam in Rapur Mandal of SPSR Nellore District.
Re-routing of 1000mm dia gravity main pipe line from Narava 42mld WTP to Vepagunta GLBR with 1000mm MS pipe line at 3rd and 4th lines railway crossing bearing Railway bridge No.1646 near MGR dam gates
Annual Maintenance Estimate for Madduru Vijjeswaram Arms and 3 Head sluices, Scour sluices of Sir Arthur Cotton Barrage for the Year 2026-27 Annual Maintenance Estimate for Dowlaiswaram and Rali Arms of Sir Arthur Cotton Barrage for the year 2026-27
Repairs to surplus weir of Sakunal MI Tank in sakunala (V), Orvakal (M), Kurnool District
Repairs and improvements to Surplus Weir of Tolisapuram M.I.Tank near Basavapuram (V), Kurnool (M) & District.
FDR-Temporary restoration to Yarlapudi tank and diversion weir shutter near Yarlapudi (V) Tirupati (Dist)
Improvements to Damline Section Office of TB Dam
Underwater pointing to upstream face of TB Dam
Strengthening to downstream divide walls of TB Dam.
Formation of earth dam across sitapalli vagu including construction of spillway Regulator and construction of head sluice for Bhupathipalem Reservoir Project Scheme near Bhupathipalem (V) Ramachodavaram Mandal Construction of Lascar, Electrician and watchman quarters at Bhupathipalem Reservoir site
Construction of Vented Road Dam across local stream for the road from Theranampalli to Dondlavagu-Peddakudala Road 0/2 to 0/4 KM of Lingala Mandal of YSR District Kadapa with an Estimate cost of Rs.30.00 Lakhs
Fixing of boundary pillars in between Km.10/000 to Km.75/000 at R.L 1635 Feet along the foreshore area on both sides of TB Dam (45.80 Kms length on both sides at 1633 and 1635 Contours)
Replacement of rubber seals, erection of new walkway bridge, sand blasting & painting to radial crest gates, supply & erection of new main control panel boards, sub distribution panel boards, control panel boards, dam beautification to Mid Pennar Project, Ananthapuramu
Supplying of Human Resources ( Labourer) for watch and ward for the period from 16/11/2017 to 31/03/2018 from Km 0/000 to Km 21/300 of Power Canal , Tb Dam for the year 2017-18
Construction of Crash Barriers, CR masonry to central dividers, formation of foot path, slope stabilization works and other ancillary works to the Tiruvenkatapadam Phase-III Ring Road at Tirumala (Narayanagiri Rest House-I Junction to GG Dam Junction)
Construction of Crash Barriers, CR masonry to central dividers, formation of foot path, slope stabilization works and other ancillary works to the Tiruvenkatapadam Phase-III Ring Road at Tirumala (Narayanagiri Rest House-I Junction to GG Dam Junction)
Providing improvements to the inspection track on top of bund, filling of rain cuts, D/s side slopes of bund, silt removal in Toe drain on D/s of bund from KM 8.000 to 10.752 in KR Dam