Loading…
Loading…
277 results • Best match
Provision of Boundary Wall at locations prone to encroachment in the approach of Nangal Dam & Kiratpur Yard under SSE/W/NLDM on MRND-DLPC section. (Cast-in- situ/ precast RCC wall)
Providing consultancy services for carrying out survey, designing, working drawings, detailed estimates with BOQ for the work of constructing of Check Dam in Hilly area of village-Musnota in Nangal choudhary area.
Construction of Silt Detention Dam cum Water Body (Earthen) at Sar Ka Khala, Tibbi Beat, Balouti Block, Panchkula Range, Morni Pinjore Forest Division under CAMPA NPV Scheme during the year 2023-24
Detailed Project Report of realignment of PMDA water pipeline from Kaushalya Dam near Amravati Enclave including detailed design of supporting structure within the Kaushalya River at Panchkula in the state of Haryana.
Construction of various damaged streets from H/o Bobby cable to H/o pappu aggarwal, Diwan gate chowk to H/o virender Pt. and H/o amit singhal to H/o Ravi aggarwal etc. near diwan gate and chopta bazar in ward 6, MC jhajjar
Restoration of settled/Damaged 700mm dia brick sewer line in front of Gate no. 2 Hisar Bus Stand.
Replacement of existing damage Sewer Line in NGM at Bhiwani
Temporary protection on damaged/settled patches of side lining of Munak Canal from RD 0-8.77 before kharif 2026
Temporary protection on damaged/settled patches of Supplementary channel from RD 0-4000 before Kharif 2026.
Temporary protection on damaged/settled patches of supplementary channel from RD 4000-29000 before kharif season 2026.
Construction of boulder masonary with RCC Diaphgram Water Harvesting Structure / Check Dam No 2 in Sukhi Khali (C-15) at kalesar Beat In Kalesar Block of kalesar range (Labour and Carriage of Material )
Custom Bid for Services - Geotechnical investigation for the work of Preparation of Detailed Project Report DPR for 1X12MW Telengiri Dam Toe Small Hydro Electric Project in Koraput District in the state of Odisha
Consultancy services for carrying out feasibility study and preparation Detailed Project Report of realignment of PMDA water pipeline from Kaushalaya Dam near Amravati Enclave including detailed design of supporting structure within the Kaushalaya Ri
Construction of Silt Detention Dam cum Water Body (Earthen) at Panni Wala Choe C-103, Bunga Beat, Balouti Block, Panchkula Range, Morni Pinjore Forest Division under CAMPA NPV Scheme during the year 2023-24
Prov and laying of 745mm MS Pipe 8mm thick for Repair jointing of existing pipe line and all other works contingent thereto for Raw Water from Kaushalya Dam to Sec 1 Water Works Panchkula
Estimate for construction of RCC wall between existing pillars of intake at ITO Barrage Delhi.
Scope of Work is Construction of Cofferdam for Execution of Dilution Tank at Massani Barrage.
Estimate for Replacement of Damaged HT AB Cable 395 Sqmm unwinding with HT XLPE 3c95mm2 on 11 KV line STP Independent feeder fed from 66 KV SStation Sohna under OP Sub Division Sohna During the year 202122
Laying of 200mm DI pipe line in village Raipur
Providing and fixing of damaged RCC Gully Trap cover and frame and cleaning of Gully Trap including connecting pipe to Manhole in ward no. 13 and 14 Hisar Town
Special estimate for replacement of damaged windows and glass with aluminum windows at 132Kv S/Stn Chandoli.
Providing and fixing of damaged RCC Gully Trap cover and frame and cleaning of Gully Trap including connecting pipe to Manhole in ward no. 19 Hisar Town
sewer lines
Replacement of damaged 150 mm AC pipeline in pond with 150 mm DI Pipeline Village Gijaroad
Widening of Exiting and Damaged street and Re-Constructed of Street by Providing of IPB from Govt. Boys School to Meer Singh Park, at Village Jhojhu Kalan Scheme FFC
Restoration of road cut damaged due to flood on 02 no. link roads i.e. Meham PWD Road to Puthi PWD Road at Samain (ID 1778) and Bedwa to Puthi (ID - 1849) in Meham Constituency
Providing and fixing of damaged RCC Gully Trap cover and frame and cleaning of Gully Trap including connecting pipe to Manhole in ward no. 15 and 20 Hisar Town
Restoration of Road cut damaged due to Flood on 02 no. link roads i.e. from village Nigana Phirni that connects the four other villages namely Gudhan, Katesra, Sangahera and Pilana (ID - 9734) and Bhali Anandpur to Bahu Akbarpur (ID - 1873) in Kalana
Providing and fixing of damaged RCC Gully Trap cover and frame and cleaning of Gully Trap including connecting pipe to Manhole in ward no. 16 Hisar Town
Providing and fixing of damaged RCC Gully Trap cover and frame and cleaning of Gully Trap including connecting pipe to Manhole in ward no. 10 Hisar Town
Repair of Damaged Patches
Repair of Damaged patches
Services required for arrangements to be made for testing of Plate Load Test and cast in Situ Shear Test by CSMRS at Adi Badri Dam site near Himachal Pradesh AND Haryana Boundary on Somb Nadi
Estimate for Replacement of damaged chequered plates from gate no 27-32 at ITO barrage Delhi.
Constructing Katchha Drain in bed of defunct Barsati nala from Village Karoli to Jorasi dam from KM 15.170 of Hassanpur Disty for recharging ground water table in Narnaul and Nangal Choudhary Constituency under Atal Bhujal Yojana.
Replacement of outlived Digital Electronic Telephone exchanges with IP Based Digital Electronic Telephone exchanges at Saharanpur, Jagadhari Workshop, Dhuri, Patiala, Rajpura, Sirhind, Roopnagar, Nangal Dam, Chandigarh, Kalka, Bathinda, Shimla & Ambala Cantt Railway stations over UMB Division.
CONSTRUCTION OF ROAD FROM VILLAGE KHAIRKAN TO OTTU ON THE WAY OF GHAGGAR DAM RD 0.00 TO 18.90 KM IN DISTT. SIRSA (UNDER SDO OP S/DIVISION DHBVN RANIA (PDG. SHIFTING OF H POLE STRUCTURE ONLY).
Design, supply, erection, testing & commissioning of 50Hz, single phase 25 KV AC OHE in c/w Provision of full length shunting neck by extension of line no. 1 towards Nangal Dam end at Kiratpur Sahib station.
PAV.OF RASTA FROM H/O GUGAN TO DAM
Construction of roads, EPHS services near Kaushalaya Dam and behind of Himshikha colony alongwith construction of RCC retaining wall along the road in sec-5, Pinjore Kalka Urban Complex including 3 year defect liability period free of cost
Improvement to Water Supply Arrangements including Replacement of Old Dilapidated Water Supply Pipelines, water Storage Tanks and Other Allied Works in Railway Colonies of Sirhind, Kurali, Morinda, Amb Andaura, Una Himachal and Nangal Dam station under the Jurisdiction of ADEN/SIR.
Repairing Alignment and Replacement of Electrically Operated Hoist with Spares of Gantry Crane and stop log gates of Kaushalya Dam Panchkula.This rough cost estimate amounting to Rs. 20.05 Lacs has been approved in 55th meeting of HSDRandFCB at Sr. N
CONSTRUCTION OF ROAD FROM VILLAGE KHAIRKAN TO OTTU ON THE WAY OF GHAGGAR DAM RD 0.00 TO 18.90 KM IN DISTT. SIRSA (UNDER SDO OP S DIVISION RANIA) (PDG. SHIFTING OF H POLE 4 POLE STRUCTURE 33 KV OTTU LINE ONLY).
Const and repair of 80mm thick interlocking tiles from batra dairy to sandep kiryana store, near masjid tubewell wali gali gurudwara dam dama sahib to thandisadak and grover kiryana store to babbi delori wali gali purewal colony in ward 24 forSociety
Construction of brick manhole for sewer and laying sewerline and water supply line DI pipe in Himshikha Sector 5, PKUC complete in all respect as per entire satisfaction of Engineer-in-charge ( Construction of roads, EPHS services near Kaushalya Dam
In-house Manufacturing of Nursery Bags at HFDC Nursery Bags Factory, Near Masani Barrage, NH-8, Village- Khailywas Distt. Rewari
CONSTRUCTION OF ROAD FROM VILLAGE KHAIRKAN TO OTTU ON THE WAY OF GHAGGAR DAM RD 0.00 TO 18.90 KM IN DISTT. SIRSA (UNDER SDO OP S/DIVISION DHBVN PANJUANA (PDG. SHIFTING OF 11 KV LINE HT LT LINES AND DISTRIBUTION TRANSFORMER ONLY).
Providing tube well bore (2 nos.) at Krishi Vigyan Kendra Chiniyalisaur, Uttarkashi. (SH : 1 no. tube well bore behind residential campus of KVK Chiniyalisaur and 1 nos. tube well bore in the premises of the farm of KVK near Devisour bridge & Tehri ... Tehri Dam reservoir). ... Tehri dam reservoir).
The estimate has been prepared with the objective of expediting the Phase-I works of the main project and to ensure that the construction activities can be taken up without delay due to site constraints, water flow conditions, and accessibility issue
Carrying out sedimentation bathymetric survey of reservoir at Kaushalya Dam Panchkula