Loading…
Loading…
2,152 results • Best match
URGENT MAINTENANCE WORK OF RESEARCH AND DAM SAFETY DIVISION OFFICE AT PAMBLA COLONY
PHEP- Strengthening and painting of existing chain link fencing at Madupetty dam top
AMRUT 2017_18 _ FLOATING INTAKE STRUCTURE AT PEECHI DAM providing anchor and thrust blocks
IHEP- Jungle clearance- Annual maintenance of Idukki dam for the year 2023-24.
Repair works to Bridge connecting Kakkayam dam in Kozhikode district General Civil Work
Construction Of Mini Check Dam Stage II - in ward -07 in Kottukal Gramapanchayath
KUMARAMPUTHUR GP 2024-25 AVANAKUNN CHECK DAM BYPASS ROAD CONCRETE (129/2024-25)
Panniar HEP- Maintaining hydraulic structures of Ponmudi dam for the year 2020-21
GENERAL-SP - Electrification of new mess building at Siruvani Dam-ElectrificationGeneral Electrical Work
The Improvement of Basic Amenities at Mangalam Dam Police Station in Palakkad District.
Vista Clearance on both sides of the road from Manjaboard to Parambikulam Dam
Panniar HEP - Maintaining Hydraulic structures of Anayirankal Dam for the year 2025-26.
Construction of a check dam across Akavandathodu in Ambalapara Panchayath of Palakkad district.
NHEP- Rectification of chain link fencing at Right Bank downstream of Kallarkutty dam
KEEZHMAD GP-93-2025-2026 Completion of Chirappuram Check Dam in ward 6
Annual maintenance of Pathazhakundu Dam for the year 2019-20 in Thekkumkara Panchayath.
PROJECT No 100/24 Ward 7- Variyanikkadu Pinnakkanadu Check Dam Road Protection Wall
Mannarkkad Block panchayath 24-25 pro no 254 Kornakkunnu Dam thodu side protection
LPHEP-Operation and maintenance of hydraulic structures of Pambla dam for the period from 01.07.2024 to 31.03.2025
Construction of New Check Dam at Mannamparambu -Palakkathode Kavassery GP -Palakkad Dist.under State Plan Scheme 2024-25
GENERAL-EMERGENCY WORKS -MVIPEmergency replacement of the damaged rubber seal of Spillway Radial Shutter No. 3 at Malankara Dam and minor maintenance work in connection with monsoon preparation- General Mechanical Work
GENERAL-MI/WKY/AM/2025-26-Annual Maintenance of Pathazhakundu Dam for 2025- 26 in Thekkumkara Grama Panchayath-General Civil Work
Construction of Mini Dam at Chellankavu in Pudussery Panchayath
GENERAL-MIC/Desilting-muttikkal/2022- Desilting of Muttikkal Dam Kadamthodu in Vallachira panchayath-General Civil Work
Garden Maintenance
PVL HEP Repairing the retaining wall of river near the channel from weir in the river to Pallivasal tail race channel
DRW/Mace 2022/ MWSS -Mace Putting up timber Planks and watching to storage weir at Chamakkayam in Panakkad village, Malappuram Municipality
DRW 2020-21- MWSS-Mace - Putting up timber Planks and watching to storage Weir at Chamakkayam in Panakkad village, Malappuram Municipality
DRW/MACE-2022- MWSS to Malappuram - Putting up wooden planks and watching to the storage weir at Nambrani in Malappuram Municipality
Construction of weir across Palliyara thod near Nellipathy Attara bridge at Nellipathy in Agali grama panchayath in Attappadi in Palakkad district..
Desilting work of Chek Dam at 2nd mail Bottom in Vallakkadavu Range During 2022-23
Annual Plan-Konnathady GP works - Injappathal Kakkacity purayidamcity dam top road maintanance- pro no 182-General Civil Work
Constructing a retaining wall and drain at the side of road infront of intake gate of Sholayar Dam under Dam Safety section, Sholayar
Retender Taliparamba BP-2018-19-Project No 177/18-19-Construction Of Retaining Wall To Paravoor Check Dam In Kadannappilly-Panappuzha GP.
GENERAL-PVIP- Bhoothathankettu-Replacement of damaged post top fittings and faulty accessories near barrage -General Electrical Work
Soil Sample and Survey
Investigation estimate for the construction of Weir in Achenkovil river near Vyazhi kadavu in Pramadom panchayat Investigation Work
Construction of retaining wall for protecting the road leading to Cheruthoni dam bottom.
GENERAL-Replacement of Damaged FRP Shutters-Replacement of Damaged FRP Shutters of Padne Anicut at Edachakkai in Padne GP in Kasaragod District-General Civil Work
Annual Plan-Project No.336/2024-25-Construction of Shutter for Udumbanasseri Check dam in ward no.6 of of Puzhakkattiri GP-General Civil Work
PMGSYIII 2023-24 Package No. KR-13-103, Ollukkara Block, T27-Kallidukku poolachodu peechi dam road Thrissur District including Maintenance for five years after construction.
GENERAL-MSN/WS/2022-23-MVIPOverhauling and annual maintenance of main canal shutters at Malankara dam (Mechanical) -
This work is meant for removing floating debris from in front of LBMC, RBMC canal shutters and Spillway shutters in Malankara Dam.
Repair works to main road connecting Peechi dam and KERI
GENERAL-MVIP Action plan 24-25-MVIPMalankara Dam fully comprehensive annual maintenance of shutter motors and other connected electrical installation at Malankara dam Electrcial work for the year 2024-25- General Electrical Work
GENERAL-Peechi Dam 15HP Motor pump house-GENERAL-PSM-Annual maintenance and electrification works in Peechi Dam for the year 2023-24-Annual maintenance-Standardization of panel board and rewiring-General Electrical Work
GENERAL- 29th JCB action plan - SITC of 15 KVA DG set and electrification for Siruvani Dam - Installation of DG set and electrification for River Sluice - Emergency shutter at Siruvani Dam -General Electrical Work
Rerouting and Dismantling of 11kV Line from Kallarkutty Dam Site to Pannickarpady Under Electrical Section, Adimali.
DRIP II -KAS - Construction of Office building for Dam Safety Division and Sub Division at Thariode
Ring Check dam construction and ARS Implementation