Loading…
Loading…
2,154 results • Best match
Construction of check dam ( re e tender)
Earth Work Exacavation CC 1_4_8 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering dry stone pitching dismantling pipe drain filling available and contractors own earth etc
CSM -2019-20 Construction of urgent temporary bund across ventway portion of Cheerakuzhy weir
Thottiyar HEP(40MW)-Construction of security cabin cum panel room at Valara weir site
G E N E R A L - M I T / A M / 2 0 2 4 - 2 5 - A n n u a l maintenance of Poomala Dam for the year 2024-25-General Civil Work
GENERAL 3788 2024 WP 2024 2025 Urgent works for clearing weeds and obstructions during the water distribution Emergency tree cutting Emergency bund strengthening using earth filled bags etc for various canals under Walayar dam section Genera
GENERAL AP- 2024 25 Mangalam Project- Dam Section Engaging Labour for water distribution for 2024 25 between 0 000 to 5 400 km of LBC, 0 000 to 10 800 km of RBC and its branches
Maintenance of RWSS to Nedumkunnam and Kangazha - Providing temporary check dam near the down stream of Manimala river near Kulathoormoozhi inteke well cum house using sand filled cement bags and repair of existing Dry Rubble paving.
Jal Jeevan Mission-CWSS to Kavilumpara Maruthonkara-Construction of Check Dam RWGM 75000 Litre capacity GLSR cum Filter tank 50000 Litre and 25000 Litre GLSR CWGM Distribution system and Providing balance FHTC in Kavilumpara Grama Panchayath
PVIP-rectification work-fencing
clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared,.Labour engaged for cleaning, removing bio degradable and non biodegradable waste Removing cluster of Banyan trees
Boundary stone laying and casting
CIVIL WORK
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, TRIAL RUNNING, REGISTRATION, SUCCESSFUL COMMISSIONING AND MAINTENANCE OF 25HP BOAT WITH FOUR STROKE ENGINES WITH REMOTE CONTROL AND STEERING SYSTEM OF CAPACITY 10PAX
DESILTING OF RIVER
Removal of mud and debris
CC WALL
JALJEEVAN MISSION 2020 21 Supplying, laying, testing, commissioning and maintenance of distribution line from 24.5 LL OHSR at Mangalam Dam WTP providing FHTCs ( 6055 Nos) in low level zone of Vandazhy Grama panchayath including construction of RCC
GENERAL-DTPC Palakkad - Malampuzha Dam - Flower show- 2024-25- Providing temporary illumination in Main entrance and main garden in connection with Flower show in Malampuzha garden from 16/01/2025 to 22/01/2025-Temporary Electrical Work
G E N E R A L W P M O N S O O N PREPAREDNESS 2026 27 Clearing Weeds, Removing Saplings And Other Obstacles In Walayar River Between Walayar Dam To Vadassery General Civil Work
Supply installation testing trial run and commissioning of 15 hp submersible centrifugal pump set for Construction of Check dam across Thattekallu Pazhayarkandam thodu in ward No.8 of Kanjikuzhy Panchayath Lift Irrigation Scheme under MI Divn Idukki
GENERAL-Action Plan 2026-2027- Malampuzha dam- Emergency Debris Removal for the RBC Sluice Shutter-1 Nos and LBC Sluice Shutter-3Nos emergency grooves by the help of underwater divers.-Urgent Mechanical works under workshop subdivision Malampuzha
Checkdam construction
Poringalkuthu Small Hydro Electric Project (1x 24) MW - Miscellaneous balance works in Power House
Action plan 2025 26 NIP Annual maintenance Periodical removal of waste material and garbage from the LB and RB main canals 0m to 17000m each and five branch canals under Neyyar dam section for one year General Civil Work
GENERAL-Monsoon preparedness - 2025-Monsoon preparedness and flood damages for the South West Monsoon of year 2025 - Clearing obstructions in canals of LI schemes and cutting branches of trees along canal bund and Poomala dam area-General C
Sale of Processed clay/slurry at walayar Dam
STONE PITCHED CONTOURBUND ,WELL ,RECHARGERETAINING WALL,CHECK DAM
Urgent Protection Works
Clearing juncle Clearing grass, engaging man mazdoor
Clearing grass, clearing jungle, Labours for cleaning
GENERAL Vathikkudy GP 2022-23 Investigation P No 04 Investigation works for the construction of check dam cum bridge across Chinnar river near Madampadi in Ward No 08 of Vathikkudy Panchayath and Ward No 01 of Nedumkandom Panchayath
Rewiring and electrical provisions for garden office and Electrical office at Malampuzha
GENERAL-Annual Maintenance at Mudaputhur 2024-25-Annual Maintenance of Weir across Anjarakandy river near M u d a p a t h u r i n C h i t t a r i p a r a m b a Panchayath,Kannur distict for the year 2024- 25-General Civil Work
SGHEP- Rand M of Dam Safety Sub Division, Moozhiyar-Hiring a vehicle (full body covered) with driver on contract basis for the use of Assistant Engineers and Staff for a period of 12 months for the year 2025-26
SGHEP-R and M of Dam Safety Subdivision, Moozhiyar-Hiring a vehicle (full body covered) with driver on contract basis for the use of Assistant Engineers and Staff for a period of 12 months for the year 2026-27
Supply and Installation of 10 Mtr High Mast system with 6 x 200W LED Flood Light at Vazhani Dam premises, Ward- 5 in Thekkumkara Grama Panchayath, Wadakkanchery LAC, Thrissur District under MLASDF 2025-26 of Sri. Xavier Chittilappilly MLA
checkdam
Repairs and Renovation of existing KIP Canteen At Thenmala
G E N E R A L - A n n u a l M a i n t e n a n c e - Chadalapuzha-Annual maintenance of weir across Chadalapuzha in Panniyannur Panchayath, Kannur District for the year 2023- 24-General Civil Work-1
KDP-2016-17-WSS to maloth- additional distribution pipes.
Electrical works
Sale of plant Out/Waste Mud at Walayar Dam
Materials required for construction of check dam BOQ Attached
Protecting eroded left abutment portion of Cheruthuruthy check dam
Construction of side protection works, construction of check dam
Manitenance works to Kombanpara Check Dam in Pariyaram Gp
Malampuzha Dam is the second largest dam and reservoirs in Kerala,located near Palakkad, built post independencethen Madras state. Situated in the scenic hills of the Western Ghats in the background it is a combination of a masonry dam with a
Work Name Mangalam Project Dam section Improvement of LBMC from ch 2 500 to 2 600 VAKKALA Including Removal of floating materials waste and blockages for smooth water distribution during water distribution period in RB main Canal between ch 0