Loading…
Loading…
2,154 results • Best match
The work includes the installation of MS shutters at Pulliyanthoni River Shutter- Type 1 2.5 m X 1.65 m (2 nos), Pulliyanthoni River Shutter- Type 2 2.5 m X 1.3 m(1 no), Branch Canal Shutter 1.25 m X 0.6 m (1 no).
Concrete
Building
metalling tarrring Dry rubble masonry Concrete belt Quarry muck filling
This work Includes Supplying of Pump set- Erection of Pump Set , Fixing Panel board and Supply and erection of Cabin Pump House
Rectification works
GENERAL-CHEMBAKAKUND CHECK DAM CUM BRIDGE-Construction of Check D a m c u m B r i d g e a n d C a n a l a t Chembakakkundu across Kallorpuzha near mathamangalam anganvady in Noolpuzha panchayath-General Civil Work-1
O and M of 220 kV Sabarigiri Theni feeder Cutting and clearing of jungle growth including trees and tree branches along the line route from location No. 30 to 62. First tower after Anathodu dam to border tower of PTA district under LMS, Moozhiyar
Round the clock monitoring and maintenance of all gates of Idamalayar dam
Clearing jungle at Sholayar Dam area premises for the year 2023-24
Drainage Line Treatment Work-Dry Rubble pitching and Dry Rubble check dam
Idmalayar HEP Jungle clearance around the dam for the year 2022-23
Construction of Cement Concrete Retaining wall with Check Dam and Cross check
SGHEP Kakki and Anathode Dam Painting of parapet buildings and allied structure
DRIP II-Kuttiady HEP-Maintenance of Bypass Road to Kakkatam Dam Site
Repairs to MI Structure- Reconstruction of surplus escape structure of Asurankundu dam.
GENERAL-PVIP-Annual Maintenance of shutters and hoisting mechanism of Bhoothathan kettu barrage for the year 2022-23 Mechanical Works- General Mechanical Work
DRIP II- Sholayar HEP-Repair the spalled concrete surface , re-plaster ,re-painting the dam top parapet and connected structures of main, flanking dam at Sholayar and fixing handrails to gallery.
side protection
Desiltation of sand.
Rectification and Maintenance Of Seepage Gallery including Clearing jungle,masonry works, water proofing walls, painting etc
Refer Tender documents
Construction of road, Restaurant, Entrance Gate, Wooden Deck
Road re concrete
Dismantling tiled Roofng with battens ,Demolishing brickwork,Brick masonry,12mm plastering,structural steel work,coolies,wall painting ,fixing on roof pressed clay tile
Renovation of Inspection Bunglow building
A n n u a l P l a n - C H I T T U R B L O C K PANCHAYATH 2024-25-Eduppukulam Check dam Maintenance work and Left river Bank wall construction at Elapully GP P No.178 First Phase-General Civil Work
Monsoon preparedness 2026- Mulaprathodu-Monsoon preparedness 2026 mulaprathodu- Desilting work of downstream side of Mulaprathodu weir cum bridge in Cherupuzha panchayath
Rectification works to Koundan canal in Walayar Main canal of Walayar dam section
Providing ground water tank and firefighting arrangements at the Dam safety Organization building
Rebuild Kerala-Repair works of koodapuzha check dam in Chalakudy river -2019-20
SGHEP- painting and minor repair works of Staff quarters at Pamba dam colony
Desilting of check dam at Idinjapalam area in Vazhachal Range during 2020-21
Rectification Works to the damaged canal
Annual Plan-PADINJARATHARA G P , P r . N o . 2 2 4 / 2 4 , A R R A N G I N G FUNDAMENTAL FACILITIES FOR MADATHUMPARA DAM SITE A N G A N V A D I - W A R D NO14,AMOUNT 150000-General Civil Work
1. Retaining wall 1.20 m height- 216 Rm 2. Check Dam Type B- 5 Nos 3. Check Dam Type A- 2 Nos 4. Deepening and widening of thodu- 216 Rm 5. Pipe laying
construction of a checkdam
Clearing grass,cutting branches of tree, cleaning KIP main entrance yard,cleaning drain,engaging carpenters plumbers,wireman, purchasing etc.
Construction of Weir, Intake structures, leading of equipments, Power house, tailrace, civil work of switchyard, access road and other allied works etc.
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
A n n u a l P l a n - C H I T T U R B L O C K PANCHAYATH 2024-25-Eduppukulam Check dam Left AND Right River bank RCC wall construction work at Elapully GP P No. 186 Phase 2-General Civil Work
Malampuzha Dam is the second largest dam and reservoirs in Kerala,located near Palakkad, built post independence by the then Madras state. Situated in the scenic hills of the Western Ghats in the background
SGHEP - Supplying an operator round the clock for the operation of all gates, valves, generator sets and lights (including minor repair) at Kakki dam and Anathode dam for the period from 01.05.2025 to 31.03.2026
SGHEP - Supplying an operator round the clock for the operation of all gates, valves, generator sets and lights (including minor repair) at Kakki dam and Anathode dam for the period from 20.06.2026 to 31.03.2027
PMGSY-III- 2023-24 (Batch-1) Package No. KR13103 Ollukkara Block, Thrissur District including Maintenance for Five years after construction. (Balance work First Tender)
ROAD CONCRETE
100m deepening , cost of protection wall 62 m length and 3 m ht , const of curtain wall , lining of Apron , Abutment , Body wall , providing dowel bars , FRP shutters and locking arrangements