Loading…
Loading…
7,395 results • Best match
Construction Of Takli Amiya K T Weir No.2,Hivra Gated C.N.B.No.3 Tq.Ashti. Dist. Beed
Construction of K. T. Weir At. Ashti, Paradi and Shiva (Savanga) Tah. Nagpur Gr, Dist. Nagpur
Under Scheme DPDC Nagpur Construction of K. T. Weir At. Kalmeshwar-3, Tah. Kalmeshwar, Dist. Nagpur
13.Repairs to Storage Weir at Sathesai (Near Tukaram Houshiram Sathe) Tal Mulshi(Class upto VII)
JSA 2 0 CONSTRUCTION OF GATED STORAGE WEIR AT KITWADE NO 02 TAL AJARA DIST KOLHAPUR
SPECIAL REPAIRS TO K T WEIR ON UTTARMAND RIVER AT MAJGAON 1 TAL PATAN DIST SATARA
Under Scheme DPDC Wardha Construction of K. T. Weir At. Goji-1, Tah. Wardha, Dist. Wardha.
Repair To HR Of LBC And Guniting To Waste Weir Of Mankarnika LMI Tal.Dist Beed. (UEE)
Providing and Fixing of New MS Needle of KT weir Under Disaster Management for Dhule District
Gated check Dam Zaregaon no.1,Mirzanpur no.1,Dahitne no.1,Sangamner no.1,2,3,4, Hatij Tal.Barshi Dist.Solapur
Electrical works of Dudhganga major Dam. Tal-Radhanagari, Dist - Kolhapur
Repair Work of Pitching of Patgaon Dam and Maintainance work, S.T And B.T Of PATGAON DAM BYPASS ROAD under Patgaon Medium Project, Tal.Bhudargad, Dist. Kolhapur.
Operation and maintenance of 11/0.440 kV switchyard equipment at Dhanodi Dam Dist Wardha for the year 2021-22 under Lower Wardha Project Division, Wardha.
CONSTRUCTION OF GATED CHECK DAM POUT NO. 4, BAVCHI NO. 1, 2, TAL. MANGALVEDHA, DIST. SOLAPUR
Construction of Jodparali High level Barrage on Purna river near village Jodparali Tq. Basmat Dist. Hingoli Including Civil and Mechanical Work
Construction of Mamdapur High level Barrage on Purna river near village Mamdapur Tq. Purna Dist. Parbhani including Civil and Mechanical Work
Repair and reconditioning of Emergency Gate 01 No and its hoist, Service Gate 02 No. and its hoist, Fabrication Erection of CRCA Cabin 01 No for Emergency Gate Hoist, approach bridge repair and reconditioning at Haranbari Dam Nashik
M and R to earthen portion Left side Ch-0 to 2800 M and Right side Ch-3100 to 5200 M dam portion and Toe drain and Rock Toe of Bahula Medium Project Tal-Pachora
Repair and reconditioning of Cabin for POEG gate Hoist POEG Hoist Cabin roof structure, CCRS cabin roof structure, Fabrication and erection of AG bridge extension platform including labour, material etc. complete job at Dhudhganga Dam
Repairs to down stream Approach Road of Ghod Dam and Repairs to Both Head Regulators of Ghod Dam.
Restroration of vasant bandhara which comes under Uchangi earthen dam by pipe crossing at th ds side of earthen dam Tal Ajara Dist Kolhapur
Repair work of office building of Katepurna Dam Management Section, M I Section Mahan Pinjar as well as Inspection Bungalow on Katepurna Dam wall
Carrying out detail survey for submergence area and fixing alignment of dam and Taking trial bores for Proposed Bondarwadi Dam Tal. Jawali, Dist. Satara
Special Repairs to Nira Deoghar Dam By Applying Anticorrosive Paint to Radial Gates and Other Parts of Dam. Tal.Bhor Dist. Pune. For 2019 20
Construction Of Section Office at Dam site and Construction of Chowki on both side of dam for security and maintenance under Dhamani Medium Project
M and R to Barvi Dam Repairs and Strengthening to cable channel by providing Glass Reinforce Plastic Trench Covers at sub station Barvi Dam
Providing Man power arrangement for Main Dam, Forebay Dam, Power canal from 1 to 15 KM and Colony at Tillarinagar during the year 2020.
S.R. to Kurze Dam at D.P. Dapchari ( Rearranged piching of U/S side, D/S side , Toe Drain and Cross Drain of kurze Dam)
Providing Erecting Testing and Commissioning of Street Lighting at Hoist Deckbridge Radial Gates Earthen Dam and Gallery of Isapur Dam Tq Pusad Dist Yavatmal
Providing Security Arrangements for watch and ward at spill and HR room Generator room and dam Premices of Nand Dam for the year 202324
Supplying Erecting Testing and Commissioning of 11 KV line DTC and electrification work at Shivana Takli Dam Tal Kannad Dist Chhatrapati Sambhajinagar
Jangamhatti Medium Project M R to K T Weir Jangamhatti Turkewadi Karwe Mandedurg Dholgarwadi Kowad Kamewadi Tal-Chandgad Dist Kolhapur for year 2022 23 Plugging Deplugging
Providing skilled manpower for collecting Irrigation Revenue, Canal and dams water rotation work and Rest house maintenance under Panchaganga Irrigation Sub-Division Kolhapur for 2021-22.
To prepare a documentary film of 10 minutes of 12 dams Major projects medium projects under Jalgaon Irrigation project circle Jalgaon from drones and 4K cameras
M and R for Fixing and Removing of M S Needles to K.T. Weir KHANAPUR and HILLI Tal . AKKALKOT for the Year 2022-2023.
M and R to K T Weir Gunjegaon, Marapur, Gharniki and Mallewadi for Year 2022 23 Tal Mangalwedha Fixing and Removing M S Needles
Fabrication and Erection work of EOT for Irrigation Outlet EG. Design, Manufacturing and Erection of 10 MT capacity EG Hoist. Material,Fabrication, Erection of CRCA Cabin at Dam top and left bank EG. Repairs and maintenance of LBIO SG and EG. At Gir
Repair and Maintenance of Radial gate size 12.479 x 8.224 Mtr- 14 No. and Repair and Maintenance of River Sluice SG and EG gates size 1.9 mtr x 2.44 mtr SG-3 EG-1 no by at Girna Dam Tal. Chalisgaon Dist. Jalgaon.
Constructio of 4 Dry Rubble Chek Dam and 2 Water Storege Tank At- patan Range (Shidrukwadi, Kadhane, Salve and Kalgow)
Providing and Installing 3 phase On Grid Solar Power System at Lower Dudhna Dam Selu under Subdivision No 2 Selu
Construction of Approach Road and Store Room for Khatav(Bhosalewasti),Khatav-2 K.T.Weirs , construction of Approach Road for Khatav-3,Shiraswasti K.T. weir, Construction of Store Room for Pusegaon(Katkarvadi) and Khatgun K.T. weir and Supply of nidd
Name of Work Consructing Cement Bandhara / Recharge Weir / Storage weir At Hanumanwadi (Ratan Suryawanshi Gut No 464), At Mandaki, Near High School (Sanjay Bhagwan Rannavare Gut. No. 747), At Kothale (Bhagwan Vavare Gut No 101 Nathuram Wagh Tathy
Employing watchman on dam Site from 15/06/2022 to 15/10/2022 to take watch on dam site and to reports of Dam daily water levels of Gadnadi, Gadgadi, Ozar, Rangav, Shelarwadi ,Talwat, Tangar and Kakewadi M.I. Projects
Repair to main dam wall of kardi MI Tank and work suggested by dam safety organization. ( Repair to dam embankment, pitching, cleaning trees and shrubs and maintenance -repair to spillway gate (6 x 1.5 m ,35 No.) leakage thro
Employing watchman on dam Site from 5/06/2023 to 31/10/2023 to take watch on dam site and to reports of Dam daily water levels of Gadnadi, Gadgadi, Ozar, Rangav, Shelarwadi ,Talwat, Tangar and Kakewadi M.I. Projects.
JOB WORK FOR MOTORISATION REPAIRS AND MAINTAINCE TO SERCIVE GATE AT LEFT SIDE CANAL FOR VADIWALE DAM
Providing compound to approach road of left and right side of Palkhed Dam, and other related work.
Supplying, erecting, testing and commissioning of 2x250 kVA Transformer with DP structure equipments and LT panel for 11/0.433 kV switchyard at Dhanodi Dam Tah. Arvi Dist. Wardha
L-Earthworks Construction of Embankment in breached portion of Left Bank Canal Ch.0 to 3150 m and on Diversion Weirs at Zero Bandhara, Vaijanath Bandhara and Dhar Bandhara of Rajanala Irrigation Scheme,Tal-Karjat,Dist-Raigad.
2702-Minor Irrigation Project M. and R. to K.T. weirs under M. I. T. at Here, Jelugade, Kalasgade ,Kitwad No. 2 , Shippur , Ambewadi and Kajirne Tal. . Chandgad, Dit. . Kolhapur for year 2020-21. De-plugging and plugging