Loading…
Loading…
7,395 results • Best match
REPAIRS TO KOLHAPUR TYPE WEIR NO 3 AT PIMPALDOLI TALUKA PATURDISTRICT AKOLA UNDER JSA 2 0
11.Repairs to K T Weir at MAU KHADKACHI ASHRAM SHALEJAWAL Tal Maval(Class upto VII)
Construction of Road and 3 Hume Pipe Culverts for Farmers For Transportation on bank of Bordi nalla At D/S side of Borgaon Mohana Dam
Construction of structure at Junction of Mahu Dam, Main Canal No. 1, LBC _ Feeder and under Kudali Medium Irrigation Project, Tal-Jaoli, Dist-Satara.
JOB WORK OF REPAIRS AND MAINTENANCE OF STOP LOG GATES 12 5 MTR 12 NOS BY REPLACING RUBBER SEALS GOLIATH CRANE 16 MT CAP AT SINANKOLEGAON DAM SUCH REPLCACING WIRE ROPES REMOVING OF OLD GREASE LUBRICATION AND GREASING TO GEAR TRAIN, GEAR
Repair and Maintenance of Karanjwan Dam Top and Other Allied Work
CONSTRUCTION OF GATED CHECK DAM Hatid No.4,K.T.Weir Hatid No.4 TAL.Sangola, DIST. SOLAPUR
Construction of Retaining wall on both the flanks at K.T weir no 7 sangve ch 15400m under Nardave medium irrigation project Tal kankavli
M and R to K T Weir at Gajaragaon Gijavane Jarali Nilaji and Khanadal Under Chitri Medium project Deplugging and Plugging 2022 23
M and R to K T Weir at Chambharkhadak Mugali Nandyal Arjunwada Metage Galagale Belunkhi Tal Kagal Dist Kolhapur De plugging and plugging 2022 2023
Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Up keeping of Dam Complex Chhirkila Transit Camp Jamku and Instrumentation Data Observation at Dam site of Dhauliganga Power Station, Manpower Outsourcing Services - Minimum wage - ... of Dam Complex ... at Dam site ... of Dam Complex ... at Dam site ...
Providing and Erecting Chain Link Fencing 1.6 M Height With G.I Chain Link Of Size 50 X 50 mm 8 Gauge Thick and Fixed 75 mm Above Ground Level 3770 Mtr. At Bhama Askhed project Dam of Bhama Askhed Dam under Bhama Askhed Dam Division Pune.
Estimate for construction Drop HPC at4000m on Right Bank Canal of Khasapur M.P.,Dam Safety Work for KhasapurM.P.,Improvement of Approach Road from Paranda Barshi Road to Chandani Dam At Pimpalwadi,Dam Safety Works for Sakat M.P.,Tq Paranda,Dis Dh
Repairs to Main Dam Wall Dam Top with Casing Material Drain repair Pitching Level and Guage Scale Painting Repair to service road Removing Shrubs Bushes and Trees from dam wall Also Repairs to Drain and Irrigation Management work of Dagadparva Mi
Providing and supplying skilled and unskilled mazdoors to Veer dam Sub Division for irrigation management for yearly general maintainance of Veer dam Rest House and for Veer dam maintainance after the flood period for remaining year 2025 26 and othe
Repairing Of Well Near Waghoda Dam At Shahapur Tal jamner Dist Jalgaon
Operation of irrigation outlet submersible pumps in gallery and Maintenance and repair work of Radial gates and complete electrical system of Hatnur Dam in the month of July-2023 to March-2024
Regarding oiling, greasing of automatic Godbole gate on the wall of Yelgaon dam and removal of trees and shrubs on the wall of Yelgaon dam
Engaging Private Manpower for Irrigation Management for Rabi and Hot wheather season, For taking Daily Dam Water levels and Dam Security in Manivali Irrigation Section.
Engaging Private Manpower for Irrigation Management for Rabi and Hot wheather season, For Taking Daily Dam Water Levels and Dam Security in Shahapur Irrigation Section.
Regarding oiling, greasing of automatic Godbole gate on the wall of Yelgaon dam and removal of trees and shrubs on the wall of Yelgaon dam
Maintance and Repearing Gavane M.I. Scheme for Konkan Hungam 2019 20 Repairs of Cannel and Road from Saddle dam to main dam and Irrigation Management
Engaging Private Manpower for Irrigation Management for Rabi and Hot wheather season, For taking Daily Dam Water levels and Dam Security in Jambhe Irrigation Section.
Providing and Fixing Informatory sign boards in the gallery and lettering of chainage stones of Alwandi Dam and Vaitarna Dam of Vaitarna Hydro Electric Project
1.Design construction and supply of Design Construction and supply of Two No Launch to be delivered at Mulshi dam and Chaskaman Dam Dist Pune
M AND R TO VEER DAM REPAIRING AND COLOURING UPSTREAM SIDE OF RADIAL GATES OF VEER DAM PROVIDING LABOUR FOR FLOOD PERIOD 2021 BY PRIVATE
Construction of collapsed guide wall Extention of NOF section Embankment behind guide wall NOF alongwith Gabbion mattressing Saddle Dam area treatment and Dam Remaining Work
Providing Security arrangements for watch and ward at spill and H.R. room, Generator room and dam Premises of Nand Dam for the year 2024-25
Providing Pitching On Upstream Side of Nira Deoghar Dam At Chainage 1.000 to 1.360 M Servicing Of Steel Work Of Dam and Other Allied Work.
Regarding oiling, greasing of automatic Godbole gate on the wall of Yelgaon dam and removal of trees and shrubs on the wall of Yelgaon dam
Engaging Private Manpower for Irrigation Management for Rabi and Hot wheather season, For taking Daily Dam Water levels and Dam Security in Murbad Irrigation Section.
Repair of Head Regulator, Waste weir and ancillary work for Berda, Gambheri, Mandawa, Mogarda, Bobdo, Hirabambai, Khari, Lawada M. I. Project Tq. Dharni and Construction of Protection wall to Waist Weir of Bhiwapur M. I. Project Tq.Tiwasa Dist. Amrav
Supply, Erection, Testing and Commissioning of decorative fitting in garden and gate of Rest house premises at Dhanodi Dam Tah. Arvi, Dist. Wardha
Repairs of Roads from Main Dam to Tervanmedhe Pick Up weir of Tillari Interstate Ptroject
Construction of Extension to Goliath Crane Rails of Chichdoh Barrage, to keep Goliath Crane in Switch Yard for Safety
CONSTRUCTION OF DIESEL GENERATOR SHED AT UDDHAT BARRAGE UNDER KRISHNA MARATHWADA IRRIGATION PROJECT (LINK-5) TAL. INDAPUR DIST.- PUNE.
Supplying Erecting Testing and Commissioning of Street light arrangement at Verkhede Londhe Barrage Medium Project Tal Chalisgaon Dist Jalgaon
Construction of Drain for rehabilatation site of Asadpur and Shahapur on Gavhan Road at Asadpur for Chandrabhaga Barrage project
Construction of cremation ground and compound wall in kadgaon village under submerged area of Shelgaon Barrage Tal and Jalgaon
Operation of Vertical Lift Gates at Vishnupuri Barrage gate size 15X9 mtr 17 Nos for Year 2023 24 1Year
Conversion Of Bramhnath Yelamb K.T.Weir On Sindphana River into Barrage under extension and Improvement Tq. Shirur (Ka) Dist. Beed
Operation maintenance and providing security of Kawalewada Barrage for year 2025 26 Under Dhapewada Lift Irrigation Scheme Stage II
Providing, Erecting, Testing and Commissioning 11KV HT Express Feeder line for power supply connection at raw water pumping station head works site at Chaskaman Dam for Rajgurunagar Municipal Council
Repairs n Reconditioning of SERVICE GATE No.1 LHS of Size 2.5mx2.00m opening with Down Stream Sealing Type n Having Screw Stem Hoist on LBC with material, Transportation, sundry n labour charges at Gangapur Dam Tal.Dist. Nashik.
Repairs n Reconditioning of SERVICE GATE No.1 LHS of Size 2.5mx2.00m opening with Down Stream Sealing Type n Having Screw Stem Hoist on LBC with material, Transportation, sundry n labour charges at Gangapur Dam Tal.Dist. Nashik.
Repairs n Reconditioning of EMERGENCY GATE No.1 LHS of Size 2.5mx2.00m opening with Up Stream Sealing Type n Having Screw Stem Hoist on LBC with material, Transportation, sundry n labour charges at Gangapur Dam Tal.Dist. Nashik.
Repairs n Reconditioning of EMERGENCY GATE No.2 RHS of Size 2.5mx2.00m opening with Up Stream Sealing Type n Having Screw Stem Hoist on LBC with material, Transportation, sundry n labour charges at Gangapur Dam Tal.Dist. Nashik.
CONSTRUCTION OF GATED CHECK DAM Bandgarwadi Katphal No.1,2,Katphal No.1,2 ,Mahud BK No1,2,3,4.TAL.Sangola, DIST. SOLAPUR
M and R to K T weir Umgaon Nhaveli Chandgad Kokare Kurtanwadi Hallarwadi Mangaon Under jambhare Medium project Tal Chandgad Dist Kolhapur for year 2022 23
Under Scheme DPDC Wardha work of Construction of K. T. Weir At. Khapari, Tah. Seloo, Dist. Wardha