Loading…
Loading…
5,884 results • Best match
Balance work for completion of internal drains with one number pipe culvert and incomplete CC Road retaining wall and earth filling on both approaches of completed culvert in the RR colony Jamada for construction of Additional Spillway Hirakud Dam
Improvement to U/S rip-rap such as removing and repacking of disturbed stone pitching within RD 665.00 mtr to RD 743.00 mtr between RL 605.00 ft to 630.00 ft of Left Earth Dam for the year 2025-26
Improvement to U/S rip-rap such as removing and repacking of disturbed stone pitching within RD 300.00 mtr to RD 400.00 mtr between RL 605.00 ft to 630.00 ft of Left Earth Dam for the year 2025-26.
Improvement to U/S riprap such as removing and repacking of disturbed stone pitching within RD 800.00 mtr to RD 980.00 mtr between RL 608 ft to RL 630 ft of Left Earth Dam for the year 2024-25
Construction of Reinforced Cement Concrete Check Dam over Kaliakhal nala near village Nuadihi along the Chain Link Fencing Line of the Treatment and Transit Facilities of Wild lives at Manchabandha RF in Baripada Range under CAMPA-WL- 2024-25
IMPROVEMENT WORK
Building work
Development of parking area
Building work and road works
Road with Drain work
C.C. Lining
Restoration to Pattanalla
P/R of Rathapur to Dam Site Road such as Widening of Road from 0/000 to 0/800 Km and Renewal Coat with 25mm thick SDBC from 0/000 to 7/000Km in the District of Subarnapur for the year 2019-20
Supply ,Fabrication and Erection of Monoblock Gate and Hoist of MV -04 Check Dam (MA -05-0028) over Local Nalla near Village MV-04 in Malkangiri G.P of Malkangiri Block under Minor Irrigation Division ,Malkangiri for the year 2022-23.
Improvement to earth dam from RD.00 to RD.960mt. and construction of left H/R at RD.300mt. and right H/R at RD.527.50mt. of Bhuliakata MIP in Rengali block of Sambalpur district under Critical Grant 2019-20.
Three times cleaning of bushes and up rooting the stumps, roots, etc. of 4th gap RD 31450 ft. to RD 39000 ft. along with toe road of 4th gap Left dyke of Hirakud Dam at Jamadarpali for the year 2025-26
Rubber seal changing replacement of steel wire rope with socket and turn buckle assembly of 05 Five Nos Spillway Radial Gates along with maintenance of Gantry Crane of Upper Kolab Main Dam Upper Kolab Project for the year 2023 24
Improvement to earth dam from RD.00 to RD.600mt. and construction of left H/R at RD.68mt. and right H/R at RD.390mt. of Parmanpurkata MIP in Maneswar block of Sambalpur district under Critical Grant 2019-20.
Improvement to U/S rip rap such as removing and repacking of disturbed stone pitching within RD 1170.00 mtr to RD 1220.00 mtr. between RL 605.00 ft. to RL 630.00 ft. of Left Earth Dam for the year 2025-26
FABRICATION, ERECTION, TESTING AND COMMISSIONING OF TWO NOS. SLUICE GATE (SIZE-2000MM X 1800MM) AND 3 NOS. SLUICE GATE (SIZE-1800MM X 1200MM) OVER BADAHARIPUR TO BEGUNIA JORE CHECK DAM AT RD-4300 MTR. NEAR VILLAGE NISCHINTA UNDER DRAINAGE DIVISION, B
Improvement to Canal and MIP Dam Road from RD 00m to 930m RHS and RD 00m to 976m LHS of Bhaluguda MIP in Chandrapur Block of Rayagada District under Special Central Assistance to State (CAPEX Road) for the year 2024-25.
Improvement to earth dam from RD.00 to RD.600mt. and construction of left H/R at RD.68mt. and right H/R at RD.390mt. of Parmanpurkata MIP in Maneswar block of Sambalpur district under Critical Grant 2019-20
Supply ,Fabrication and Erection of Monoblock Gate and Hoist of MV -12 Check Dam (MA -05-0027) over Local Nalla near Village MV-12 in Malkangiri G.P of Malkangiri Block under Minor Irrigation Division ,Malkangiri for the year 2022-23.
Improvement to earth dam from RD.00 to RD.960mt. and construction of left H/R at RD.300mt. and right H/R at RD.527.50mt. of Bhuliakata MIP in Rengali block of Sambalpur district under Critical Grant 2019-20.
Jungle cutting.
Renovation of Chitrotpala Right Branch Canal from RD 9.100 km. to 15.200 km. for the year 2023-24. (MBD06/2023-24)
Construction of Foot Bridge at Guali Mathasahi over Mahanadi Left Canal for the year 2023-24 (MBD10/2023-24)
Repair and renovation to Link Canal from RD 0.000 to 8.600km. (Working RD 0.000 to 6.000km.) for the year 2023-24. (MBD02/2023-24)
Improvement to Mahanadi Left Canal from RD 0.280 km. to 9.200km. for the year 2022-23. (MBD05/2022-23)
Improvement to Chitrotpala Right Canal from RD 7.500km. to 15.200km. for the year 2022-23. (MBD06/2022-23)
Permanent breach and piping closing of MLC at RD 0.450 km. (L/B) for the year 2020-21 (MBD 33/2020-21)
Renovation of Mahanadi Left Canal from RD 16.920km. to 21.980km. for the year 2022-23. (MBD01/2022-23)
Weed clearance and jungle clearance of MLD from RD 7900 mtr. to RD 11700 mtr. for the year 2020-21(MBD 28/2020-21)
Renovation of Mahanadi Left Canal from RD 13.300 km. to 14.400 km., RD 15.520 km. to 16.920km., RD 22.000km. to 24.700km. and 25.710km. to 28.030km. for the year 2022-23. (MBD03/2022-23)
M/R to Nuagaon Minor, Manpur Minor, Janardanpur Minor, Mirzapur Minor, Behedpur Minor and Jaipur Minor for the year 2020-21 (MBD 26/2020-21)
Improvement to Paika Right Distributary from RD 00 km. to 10.000 km. for the year 2023-24. (MBD07/2023-24)
Restoration to Mahanadi Right embankment from RD 1007 mtr. to 1094mt. with launching packing and laterite stone masonary near Brajabiharipur village for the year 2023-24. (MBD01/2023-24)
Improvement to road from Civil Section office to Mechanical Section Office from RD 105 m. to RD 240m. at Nimpur Irrigation Colony for the year 2023-24. (MBD14/2023-24)
M/R to Mahanadi Left Branch Canal from RD 5500 mtr. to RD 11400 mtr. for the year 2020-21 (MBD 31/2020-21)
M/R to PRD from RD 900 mtr. to RD 7000 mtr. for the year 2020-21 (MBD 23/2020-21)
Restoration to Mahanadi Left Distributary RD 2.50 km. to 11.70 km. Working RD 2.50km. to 2.70km. and RD 4.00km. to 4.50km. for the year 2022-23.
M/R to PRD from RD 7300 mtr. to RD 13000 mtr. for the year 2020-21 (MBD 25/2020-21)
Restoration to Paika Right Distributary RD 9.00 km. to 20.200 km. Working RD 13.60km. to 14.10km. for the year 2022-23.
Improvement to road of Mahanadi right embankment from Brajabiharipur to Madhusudan Setu (from Working RD 3.450km. to 4.000 km.) for the year 2023-24. (MBD13/2023-24)
Renovation of Mahanadi Left Distributary from RD 00 to Tail for the year 2023-24 (MBD05/2023-24)
Renovation of Mahanadi Left Branch Canal from RD 00 to Tail for the year 2023-24. (MBD08/2023-24)
Improvement to Paika Right Distributary from RD 11.000km. to Tail for the year 2023-24. (MBD09/2023-24)
Improvement to Paika Left Branch Canal from RD 0.000 km. to 15.200km. for the year 2022-23. (MBD07/2022-23)
Permanent breach and piping closing of CRC near Purunapari (R/B) for the year 2020-21 (MBD 32/2020-21)