Loading…
Loading…
5,884 results • Best match
Renovation of Mahanadi Left Canal from RD 9.230km. to 13.300km. for the year 2022-23. (MBD02/2022-23)
M/R to PRD from RD 13400 mtr. to RD 20000 mtr. for the year 2020-21 (MBD 29/2020-21)
Restoration to Mahanadi Right Embankment from Brajabiharipur village to Chahata from RD 0.00 to 7.45km. for the year 2022-23. Working RD 2150m. to 2375m. and RD 5825m. to 6150m.
Bed clearance to PLBC from RD 8.000 to 15.000km for the year 2020-21 (MBD 24/2020-21)
Weed clearance and jungle clearance of MLD from RD 00 mtr. to RD 3070 mtr. for the year 2020-21 (MBD 27/2020-21)
Renovation of Mahanadi Left Canal from RD 14.400 km. to 15.400 km. for the year 2022-23. (MBD04/2022-23)
Weed clearance and jungle clearance of MLD from RD 6200 mtr. to RD 7800 mtr. and Olagada Minor for the year 2020-21 (MBD 30/2020-21)
EMBANKMENTWORK
Earth Work, RCC,PCC, Rigid smooth,Providing weep hole,RCC hume pipe,Rough stone dry packing etc
Restoration to Pattanala
Restoration to Pattanalla
Bank protection work
Embankment protection
Embankment protection
Clearance of bushes and Jungle with unwanted grass at U/S , D/S of Dam and Cleaning of top and longitudinal drain, front side of Gallery and right side of right HR gate of Pitamahal Irrigation Project for the year 2025-26.
Improvement to U/S riprap such as removing and repacking of disturbed stone pitching within RD 520 Mtr to RD 665 Mtr between RL 605 ft to RL 635 ft of Left Earth Dam under lump critical for the year 2023-24
Improvement of upstream slope portion riprap such as removing and repacking of disturbed stone pitching within RD 780.00 Mtr to RD 915.00 Mtr between RL 608 ft to RL 630 ft of Left Earth Dam under lump critical for the year 2023-24
Design,Drawing of RCC Intake well of 4.50 mtr. Inside dia 20 mtr. Deep including construction of coffer dam,pump house on the well crane arrangement RCC walk way to Intake well pump house for Multi GP PWS to Beredakia and Raikia
Construction of longitudinal drain of toe road of right dyke of Hirakud Dam from RD 21900 ft. to RD 23300 ft., RD 24700 ft. to RD 25330 ft. and dRD 25950 ft. to RD 26600 ft. at Burla for the year 2024-25
Improvement to Canal and MIP Dam Road from RD 00m to 1470m of RMC and RD 00m to 702m of BC of Tandipur MIP in Kolnara Block of Rayagada District under Special Central Assistance to State (CAPEX Road) for the year 2024-25
Improvement such as widening and strengthening of road from Buguda - Polosara PWD road to Singhasini via Ch. Sasan upto Ganjam Border (R.D. Deptt.) Saila Dam road (ODR) from 0/000km to 10/000km in the District of Ganjam for the year 2025-26
Improvement to U/S riprap such as removing and repacking of disturbed stone pitching within RD 1440.00 Mtr to RD 1500.00 Mtr between RL 605 ft to RL 630 ft of Left Earth Dam under lump critical for the year 2023-24
Road works
CANAL ROAD WORK
Proving paver tile at Down Stream area of Dyke No-I for development of parking place of Lower Indra Irrigation Project.
Road works
Building works
Procurement of Goods
Building works
Building repair works
Supplying, fitting and fixing of Street light to Dyke-II and Dyke-I of Lower Indra Irrigation Project
Improvement and protection to Market Area in partly submerged village Pendrawan under Lower Indra Irrigation Project.
Repair to Ogee of Spillway in Block No 2 3 4 5 6 8 and 9 of Lower Indra Irrigation Project
Improvement to stone riprap in U/S of Dyke-III near LMC H/R of Lower Indra Irrigation Project
Widening of Gallery Road from Main Gate of Gallery entrance at RengaliDam Site
Improvement to vented causeway at the downstream of spillway of LIIP
Request for Proposal for Engagement of Consultant for Forest Diversion Proposal (F.D.P) of Pipalapanka Dam Project (Rushikulya Dam Project at Pipalapanka) in Suruda block of Ganjam district, Odisha.
maintenance work
survey work
Supply and installation of DG Set
Civil works
Civil Work
Repair Work
Earth Work, Stone Work, Concrete Work
Three times cleaning of bushes and uprooting the girth of 4th Gap RD 31450 mtr. to RD 41600 ft. and 5th Gap RD 43000 ft. to 44969 ft. along with link road of Left dyke of Hirakud Dam at Jamadarpali for the year 2024-25
Construction of FPE on Ong Left from Diversion weir at Ghuchhepali to Agalpur RD 00M to 11500M (Working Length 7000M).
CONSTRUCTION OF CONCRETE DAM AND SPILLWAY COMPONENT STRUCTURE OF CHHELIGADA IRRIGATION PROJECT.
Construction of Foot Bridge
Improvement to inspection road
Restoration and protection of River Embankment