Loading…
Loading…
49,040 results • Best match
GENERAL-DRIP-Dam safety-Stilling basin dewatering (Balance work)-General Civil Work
Providing RCC Safety wall for Right Flank Approach Road of Bisalpur dam
Supply of cable for main power supply for gates of Madikheda Dam
Development of Eco Tourism Site at Nevta Dam, Tehsil Sanganer, District Jaipur
Govt.GIRLS SR.SEC.SCHOOL WEIR
Construction KT Weir
Construction of Temporary Connecting Road (Left Bank to Song Dam Top) in Upstream of Song Dam Distt.- Dehradun.
Fabrication of Stiffeners to Strengthen of available M.S. Pipes for execution of Gravity Feeder Pipeline from Kochi Barrage to Pench Right Bank Canal at RD 28.86 Km and Allied works for Kanhan River Project (Kochi Barrage) Ta.Saoner, Dist. Nagpur
Gravel road construction work from culvert of Mahua Wale Road to Rama Meena house, Ward No. 25 weir
CC road construction work from HDFC Bank to Old Court Court including Tawale Well, Ward No. 6 weir
Cleaning of berm drain, sweeping of dam road and galleries and cleaning of chemical deposit from weep holes and foundation holes of Konar dam galleries at Konar Dam.
2_Construction of Anicut (4) construction work and Pucca Check Dam (1) construction work, Gram Panchayat Dheer Ji Ka Kheda, Bhadesar, PS Bhadesar, Project MJSA 2.0 District Chittorgarh
Changing hoisting operation of Pickup Anicut shutter from Manual mode to Electrical mode and Construction of Generator Room of Vaigai Dam in Periyakulam Taluk of Theni District
CONSTRUCTION OF ANICUT OR PAKKA CHECK DAM AT W.C. PARAPEEPLI, RANAYRA OR KOLVI URF MANDI RAJANDRAPUR UNDER PMKSY-2.0 (WDC-3) P.S. DAG DISTRICT JHALAWAR ( 7 Work)
Construction of Pakka Check Dam, RTWHS, Anicut Renovation in Gram Panchayat Mal ki Toos, Gupari, Bathera kalan, Majawara, in Panchayat Samiti-Vallabhnagar District Udaipur (By PMKSY 2.0)
Construction Of Anicut, Pacca check dam, Farm Pond, Amrit Sarovar, Talab renovation Work With Retaining wall in PMKSY-2.0 (ALWAR-WDC-1/2021-22) In Block Govindgarh
Minor Irrigation Construction of 5 Nos of Check Dams across Manair vagu near Karimnagar Bridge near Karimnagar Cable Suspension Bridge of Karimnagar Urban (M) and near Chegurthy (V) near Check Dam - I and Check Dam - II of Bommakal (V) of Karimnagar Rural (M) Karimnagar District
M and R to K T Weir at KURANI BASTAWADE AND CHIKHALI Tal Kagal Dist Kolhapur for the year 2023 24
Making and Applying six monthly compliance report of Gomti River front Channelization Project from harding bridge to Gomti weir, Dristrict Lucknow.
Anicut
Construction of Chunpara Check Dam, at Mouza-Chunpara, JL. No. 122, G.P.Malam, Block - Nayagram
Providing supply arrangement to gate motor by fabricating control panels, laying cables and providing illumination arrangement with LED fitting, at Kharda Barrage Ta Deoli ,Dist Wardha.
Providing Supply Arrangement to Gate Motor by fabricating Control Panels, laying cables and providing illumination arrangement with LED fitting at Pulgaon Barrage Ta. Deoli Dist. Wardha
Construction Kotan KT Weir No 3 Kotan KT Weir No 4 Gandhanwadi KT Weir No. 2 Tq. Shirur Dist Beed
REPAIRS TO K.T WEIR FAKATE, K.T WEIR AT TALEGAON DHAMDHERE ( JAGTAP WASTI ) AND K.T WEIR PRHADWADI TAL-SHIRUR DIST -PUNE
Construction Of KalegaonGhat KT Weir 1 ,KalegaonGhat KT Weir No 2 And Ladegaon KT Weir No 1 Tq.Kaij Dist Beed
Construction of Balance Work of Head Regulator for Kanhan River Project Kochi Barrage Ta Saoner Dist Nagpur
Construction of wire fencing and FTL stones for Acquired Land of somanthali Barrage Tal. Phaltan Dist. Satara.
Manufacturing fabrication Providing and fixing of Doging pin Sliding Arrangement at Sulwade Barrage Tal Shindkheda Dist Dhule
Estimate for survey Investigation and preparation of DPR for Weir series of check dam on Gagas River at Block Bhikiyasain Under CM Ghoshna 271 2024
Supply, Erection, Testing and Commissioning of starter panel and other electrical work at Barrage on Painganga River Dist. Washim.
CONSTRUCTION OF RIVER CROSSING TEMPORARY PATH ON BANGANGA RIVER COMING UNDER SUBMERGENCE OF SOMANTHALI BARRAGE TQ PHALTAN DIST SATARA
Pothundy Project 2019 - 20 Maintenance and repairs to Dam and Head works Clearing light jungle growth of Dam and periphery including uprooting of thick vegetation in the upstream rip-rap.
Routine civil Maintenance of Power House, Office buildings, residential Camps through work contracts for Mettur Dam Power House and Tunnel Power House at Mettur Dam for the year 2025-2026
M and R to earthen Dam with cleaning and premosoon cleaning work of main canals Aqueduct, Pipe drain and Slab drain Nalla etc of Mangrul Dam And other allied works
10_Construction of Anicut(5), Anicut Cum Causeway(2) GP Sankhali, Rewara, Pahuna under IWMP-28 Rashmi
FARM POND, SUNKEN POND, MINI PERCOLATION TANK, ANICUT, ANICUT RENOVATION, PAKKA CHECKDAM, BAL VATIKA NIRMAN KARYA
Repair work of Heekar anicut Part-IInd stage anicut on river Parwati Tehsil Kishanganj District Baran
Special repair of Downstream Floor, Energy Dissipation Arrangement (EDA) and placement of CC blocks for protection of toe of EDA of Under Sluice Bays (bay No. 1 to 6) of Dakpathar Barrage
Consultancy services related to design and drawing for construction of Energy Dissipating Arrangement EDA and appurtenant works at downstream of Joshiyara barrage of Maneri Bhali HEP Stage II in Distt Uttarkashi Uttarakhand
SITC of CCTV Camera system at Vyasi Dam Juddo, Dakpathar Dehradun
Maintenance and repairs to approach road wearing coat on waste weir road surface Repairs to Piezometers and Wire fencing compound towards Mahad road side for dam safety purpose also other allied works repairs of Nira Deoghar Dam
Resectioning work of dam section near Head Regulator from Chainage 415 to 445 m for prevention of leakages through dam body and Pointing work of Guide wall on downstream side of Waste weir at Deocope MI Scheme
Drain, Cross Repair and ferocover work in municipal board weir at various place
Detailed Survey, designing and drawing, Construction of Weir with allied work etc. All complete job for Construction of Weir Check Dam on Banai River for Murhu Block Rural Water Supply Scheme under D.W. and S. Division, Khunti on turnkey basis
Detailed Survey, designing and drawing, Construction of Weir with allied work etc. All complete job for Construction of Weir Check Dam on Banai River for Murhu Block Rural Water Supply Scheme under D.W. and S. Division, Khunti on turnkey basis
Facility Management Services - LumpSum Based - R and M of HTLT Lines HM Equipments and Electrical Installation of Baira Dam Bhaledh Weir Siul Weir Nakrod Chilli and Tissa of BSPS; O&M of Electrical Work; Consumables to be provided by service provider..
Survey Of Ranipur Barrage On Morand River, Makdai Barrage And Pipalber Barrage On Indra River Vidhan Sabha Seoni Malwa
Opening and closing of stop dam/barrage M.S. Shutters before and after rainy season under jurisdiction of Ujjain
Providing Security Arrangements for watch and ward at Spill and H.R. Room Generator Room and Dam Premises of Nand Dam for the year 2022-23