MTPS I Mill Plant Unit I Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge chute platforms coal pipes mill floor and mill gearbox
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 2 Nos Cooling Water Pump of capacity 16000 M3 Hr Single Stage 64 inch VMF Model 1175 KW motor in stage I
MTPS I Mill Plant Unit I Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in any one Mill 1A to 1F
MTPSI Mill Plant Unit I Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2026 27
MTPSI Mill Plant Unit I Dismantling of existing elliptical feeder discharge chutes mill 1A 1B reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2026 27
MTPS I M I CA CWS I Unit I Cooling Tower I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I
MTPSI Mill Plant Unit I Dismantling the eroded 30 45,75 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
MTPS I BM Unit I Annual maintenance 2026 27 Hot primary air Ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and ducts and other related works etc
MTPS I TM Unit III Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit III during AOH 2026-27
MTPS I BM Unit III AOH 2026 27 Renewal Reconditioning of various Saw tooth Expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I TM Unit III Renewal of piston seals and piston rod packings in HP LP Bypass valves and its spray valves actuators including servicing of oil filters during the AOH of 2026 27
MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2026 2027
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective rear arch goose neck bends tubes and water wall reducer tubes and allied works in the rear side of the boiler at goose neck portion in the rear arch area
MTPS I BM Unit III Boiler Pressure parts AOH 2026 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit III Boiler AOH 2026 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPS I CA CWS II Unit III Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking renewal of Nitrile rubber seal Replacement of eroded corroded portion of bolt fixing area in Intake Screens of CWPs 3A 3B 3C
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in 7 9m S panel area and side water wall tube in boiler 1st pass
MTPS I BM Unit III Annual maintenance 2026 27 Hot primary air Ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and allied works
MTPS I BM UNIT III Boiler pressure parts Replacement of worn out pipe lines Bends and Flanges of LRSB lines and Removal of insulation and refixing over LRSB line pipes and bends after completion of work etc
MTPS I CA CWS II Unit III Overhauling and painting of Sludge Disposal Pump and Cold Hot water Tunnel vent valves Air Vent valves Gate valves Non return valve and painting of Safety grills Handrails Oil line Hub arm sleeves etc
MTPS I BM Unit III Boiler pressure parts AOH 2022 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled
MTPS I BM Unit II Boiler pressure parts AOH 2022 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I st and II nd pass area
MTPS I BM Unit III Boiler pressure parts Economiser coil banks RHS of boiler Cutting the Eco coil banks lifting from its position leading outside the boiler and allied works
MTPS I TM UNIT IV Replacing the Defective valves VDAS 122 DW 14 Modification of HPT IPT existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line
MTPS I BM Unit II AOH 2023 2024 Renewal of Various types of heating elements in APH A and B Sides and other related works
MTPS I Mill Plant II Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly etc
MTPS I Mill Plant Unit I Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 1A to 1F and Dismantling of seal air fan motor and overhauling reassembling and setting the alignment
MTPS I Boiler Maintenance Providing 1 No Diesel driven van having seating capacity 8 and above including driver on hire basis for the official use of EE BM MTPS I for the period of one year from the date of utilization of vehicle
MTPS I Mill Plant Unit IV Hard facing of MS bend multiple port outlets in coal flow lines and Fabrication of MS bend 15deg 22deg to suit dia 508 mm X 12 7 mm thick coal pipe line during AOH 2024 25
MTPS I TM Unit IV Cleaning Hydraulic Testing of Lub oil Coolers Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs CEPs Renewal of BFP leak off line and suction discharge flange Gaskets Inspection OH of mechanical
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends and pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2022 23
MTPS I TM UNIT I Replacing of the Defective valve VDAS 122 Modification of HPT IPT existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc
MTPS I BM Unit III Boiler Pressure parts AOH 2023 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit II Boiler AOH 2020 Pressure parts Inspection and strengthening of various sizes of hanger and it s supports marking Hot and Cold hanger loading position cleaning checking of tie rods and adjustments in critical pipe lines etc
MTPS I BM Unit I Boiler pressure parts AOH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube etc
MTPS I Mill Plant Unit III Applying two layers ceramic wear coat Eromat at mill outlet elbow Ceraline bends and inner cone released from Unit III during AOH 23 24
MTPS I BM Unit II Inspection Renewal of Guide bearing in Air pre Heater A and B sides and dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2023 2024
MTPS I BM Unit IV Boiler AOH 2021 Reconditioning and hard facing of used and worn out nozzles fixing of driver plates and allied works
MTPS I TM I Breakdown Maintenance work in Main Turbine and its Auxiliaries in Unit I to IV during 2021 22 for the period of 120 Days
MTPS I BM Unit IV Rotating parts AOH 2020 21 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work
e-Tender procurement for the supply of various sizes of Stainless steel shrouding (shield) for Boiler tubes at MTPS-1 site - 7 items as per Annexure enclosed
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts etc
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I BM Unit I Annual Overhauling 2020 21 Overhaul of ESP AB pass Internals and related works
MTPS I SE M I Circle Provision of One Number Diesel Driven Tata Indica Tata Indigo or Equivalent Car including driver on hire basis for the official use of Superintending Engineer Mechanical I MTPS I for the period of One year from 01 09 2023
MTPS I CA CWS II De watering complete cleaning and sludge removal cleaning with bleaching powder including painting the structure of clarifier IV during AOH 2022 23
MTPS1BM Unit III Inspection Renewal of Guide bearing in Air pre Heater A B sides and dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2024 25
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Maintenance of Burners and replacement of worn out fasteners at cover plates