Loading…
Loading…
6,236 results • Best match
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during COH of 2024 25
MTPS I TM UNIT II Providing new rubber lining at inner surface area of Phosphate and Hydrazine Chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during AOH 2023 2024
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I Civil Circle Removal of accumulated silt / slush and debris in the open drain along cooling Tower all area and main gate to central stores area and disposing of accumulated debris to a faraway place
MTPS I TM Unit III Replacing the existing defective Variable load hangers by New Variable load hangers after Providing necessary scaffolding and supporting arrangements during Unit III AOH
MTPS I Mill Plant Unit IV Hard facing of MS bend and multiple port outlets in coal flow lines during AOH 2022 23
MTPS I CA RWS De watering sludge removal cleaning of clarifier with bleaching powder complete overhauling of flocculator drive mechanism strengthening of corroded portion of structure etc
MTPS I CA RWS Misc Clarifier I De watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I M I CA CWS II Complete dismantling inspection Overhaul including renewal of wornout pump components and assembling in any 2 Nos of CWP in stage II
MTPS I Mill Plant Unit I Overhauling load testing and certifying of lifting tackles and movable trolleys
MTPS I Mill Plant Unit IV Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 22 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for one year from the date of commencement of works for 2025 26
MTPS I M I Circle CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre System of GTs UATs MOTs COTs and DOTs of Unit I to IV etc
MTPS I M I Circle CA FP Replacement of worn out puncture Headers pipelines in Hydrant Emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
MTPS I CA CWS II Unit III Replacement of Eroded Corroded Safety grill Hand rails and painting in Cooling Tower III
MTPS I BM Unit I AOH 2025 26 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and allied works
MTPS I BM Unit II COH 2024 25 Replacement of the worn out Impeller wear liner plates and other related works in ID fan 2A including cost of impeller wear liner plate 1 set
MTPS I Mill Plant Unit IV Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in 4A to 4F
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures
MTPS I Mill Plant AC Plant Unit II AOH 2023 24 Air Washer System Epoxy painting of blowers discharge duct and spray system spray nozzles cleaning replacing the damaged 25 mm air line w type eliminator chemical cleaning blower
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
MTPS I TM Unit III Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets Inspection etc
MTPS I BM Unit III Boiler Pressure parts AOH 2026 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I BM Unit III Rotating parts Annual Maintenance 2026 27 Removal and renewal of insulation in FG ducts Air Ducts Air Pre Heaters
MTPS I BM Unit III AOH 2026 27 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints
MTPS I BM Unit III Boiler pressure parts AOH 2026 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I BM Unit III Supply and Erection of deteriorated and dislodged insulation and re insulation with new insulation materials on damaged various portions of the FG duct from APH 45 degree slope end
MTPS I TM UNIT III Replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by IBR Non IBR welding Transporting the variable load hanger assemblies etc
MTPSI BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective Boiler tubes in 9th header Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit III Boiler pressure parts AOH 2026 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS-I BM Unit III Boiler Pressure parts AOH-2026 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS I BM Unit III Pressure parts Removal of deteriorated and peeled of Insulation and re insulation of Boiler burner corners and SADC with new insulation
MTPS I BM Unit III Boiler Pressure Parts Rectification of damaged ERV silencer assembly and other related works during AOH 2026
MTPS I Mill Plant Unit III Complete dismantling of Mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom Mill bottom cover plate etc
MTPS I BM Unit III Boiler pressure parts AOH 2026 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers LRSB overhau
MTPS 1 TM Stage II Unit III IV Load testing of 2 ton capacity EOT crane movable 1 ton chain block trolleys and 1 TON Capacity Electrical Hoists in pumps Compressor and LP Bypass valves area for the year 2026 2027
MTPS I BM Unit III Boiler pressure parts AOH 2026 Dismantling cleaning and rectification of defective seal trough seal plates S S woven wire mesh providing patch plate
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler For rectification of boiler tube puncture at various location HP LP Valves etc
MTPS I CA FP Conducting Hydraulic test on 9 ltr capacity Water CO2 and 5Kg DCP Dry chemical Powder Portable fire Extinguishers 9L 50L and 150 Ltr Mechanical Foam Portable Trolley mounted type fire extinguishers
MTPS I M I circle CA RWS Overhauling of Raw Water Pump No 03 and its butterfly valve painting of pump components and pipe line etc at Raw water pump house
MTPS I BM Servicing of sky climber drive and its auxiliaries Reconditioning of sky climber bed and platform materials and Overhauling of gear box assemblies etc for the year 2026
MTPSI Mill Plant Unit I Fabrication of MS bend 10 deg 15 deg 22 deg 23 deg 27 deg to Suit dia 508 mm 12 70 mm thick coal pipe line during AOH 2026 27
MTPS I Mill Plant Unit I Overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder Renewal of hot air gate seal during AOH 2026 27
MTPS I M I CA CWS I Cooling Tower I Overhauling of Flow Control Valves and including reconditioning of released FCV spares during AOH 2026 2027 of Unit I
MTPSI Mill Plant Unit I Hard facing of MS bend Multiple port outlets in coal flow lines Dismantling reconditioning overhauling and assembling of dia 250mm butterfly valves in mills seal air fan damper assembly of size dia 650mm in the seal air system
MTPS I Mill Plant Unit I Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece in Mill
MTPSI Mill Plant Unit I Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit I during Annual overhaul 2026 27
MTPS I Mill Plant Unit I Overhauling of classifier assemblies Replacement Repairing of eroded inner cone inner cone drum section Venture vanes venturi collars during AOH 2026 27
MTPS I Mill Plant Unit I Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill