Loading…
Loading…
6,236 results • Best match
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit II Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis
MTPS I TM Unit III IAC 3B Replacing the damaged foundation base plate and Bolts with strengthening of concrete cement plastering works Dismantling the Complete HP LP Cylinder Heads Cross Heads Crank Shaft etc
MTPS I BM Unit IV AOH 2023 24 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B side
MTPS I - Civil Circle - Uprooting unwanted vegetation both sides of road around secondary pond
MTPS I BM DM Plant Unit II and III AOH 2020 Overhauling of Hot well makeup pumps 4 Nos and Boiler fill pumps 2 Nos
MTPS I BM Unit I Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil etc
MTPS I BM Unit III Boiler Pressure parts AOH 2024 Reconditioning and Hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I - Civil Circle - Construction of two wheeler shed with colour coated sheet roofing south side of existing vehicle shed near canteen and allied civil works at MTPS I
MTPS 1 BM Unit IV AOH 2025 26 ESP AB CD E and F Pass Hoppers strengthening of the welding joints patch welding the eroded portions and other related works etc
MTPS 1 Mill Plant Unit III Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I CA CWS II Complete Overhauling of 10Ton Electrical hoist and Load testing of 10 Ton Electrical hoist 1 No 15 Ton Electrical hoist 1 No 2 Ton Electrical hoist 2 Nos and 1 Ton hand operated hoist 1 No in CWS Stage II
MTPS I TM UNIT III Changing the defective BFP Suction valve 3A H2CBP 3A and 3B suction valves 2 Nos by cutting and welding and changing the defective eroded 1 and 2 drain line and vent line valves pipes bends by IBR and Non IBR welding in U
MTPS I BM Unit II Boiler pressure parts AOH 2021 Reconditioning of worn out damaged fin welding Renewal reconditioning of worn out header Shield plates Overhauling of peep hole manhole door assemblies and allied works
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I - Civil Circle - Providing two coats of oil bound distemper to the fire walls in transformer yard and painting two coats with enamel paint of steel structures in transformer yard Unit III of power house building during Annual overhaul period
MTPS I CA CWS II Overhauling of sludge disposal pump and Cold hot water tunnel vent valves Air Vent valves gate valves and Painting of base frame channel structures safety grills handrails Oil line Hub assembly and gearbox in cooling tower
MTPS I TM I Breakdown Maintenance work in Main Turbine and its Auxiliaries in Unit I to IV for a period of One year during 2023 24 as and when required basis
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge etc
MTPS I TM Unit II Inspection and overhauling of Boiler Feed Booster pump 2B and allied works
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G etc
MTPS I TM Unit IV Overhauling of HP Heater Feed water group bypass valve FW I Size 300 mm 250 ATA with supply of spring energized seal ring in Unit IV during Unit under Shutdown period
MTPS I BM Boiler Statutory Inspection 2020 2021 Unit III APH B Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I TM Unit III and IV Complete overhauling and painting of Instrument Air Compressors IAC 3A 3C 4A and 4C
MTPS I CA CWSI Overhauling of CT ID Fan gear boxes 4 Nos including Static balancing of blades in Cooling Tower-I and II of Paharpur make Model 1514 11
MTPS I BM Unit II Boiler pressure parts AOH-2020 Inspection and Rectification of worn out lines and bends of Super heater header drain lines Blow down lines and water wall drain lines and Removal of insulation and refixing over drain line pipes
MTPS I BM Unit II Boiler pressure parts Inspection and rectification of dislocated platen super heater coil assembly removal and bring back to its original position and rectification of defective tube etc
MTPS I BM Unit I Boiler pressure parts AOH 2024 Dismantling cleaning and rectification of defective seal trough seal plates S S woven wire mesh Providing patch plate
MTPS I M I Circle CA FP Break down Preventive maintenance works in Hydrant Emulsifyre headers Service water and Auxiliary cooling water lines etc
MTPS I TM Unit II Overhauling of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines in Unit II during AOH 2021 22
MTPS-I Mill Plant Unit III Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends ceraline bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2023 24
MTPS I BM Unit III Rotating parts Annual Maintenance 24 25 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in Unit III condenser during AOH of 2022 23
MTPS I Mill Plant AC Plant Unit IV AOH 2024 25 Air Washer System Epoxy painting of blowers discharge duct spray system and air filter platform area Renewal of Air filter Overhauling the AWCW Pumps gate valve Spray nozzles
MTPS I BM Unit III Boiler Pressure parts AOH 2022 Tube thickness survey water wall buffing providing platform renewal of shroudings and allied works
MTPS I Mill Plant Unit II Overhaul of Hot air gates and Cold air gates Hot air damper and Reconditioning of Hot air gate power cylinder during annual overhaul 2020 21
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit II Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I BM Boiler Statutory Inspection 2020 2021 Unit III Renewal Reconditioning of Saw tooth expansion joints style 07 in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in Unit II condenser during AOH of 2022 23
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS RHS Inspection and Cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve
MTPS I CA RWS Complete Overhauling of Chlorine leak absorption system pumps blowers and its valves and Chemical dozing system tanks agitators and its valves etc
MTPS I Mill Plant Unit I Fabrication of MS bend 10o 15o 22o to suit dia 508mm 12.7mm thick coal pipe line during AOH 2023 24
MTPS I CA CWS II Overhauling of 20 Nos flow control valve complete assembly and renewal of its worn out components and patch welding of FCV nozzle pipe in cooling Tower IV of stage II during annual overhaul 202122
MTPS I Mill Plant A C Plant Unit II Annual overhaul Air Washer System Epoxy painting of the blowers 2A and 2B Discharge duct and the spray system Air filters renewal Spray nozzles cleaning Flushing the spray system pipe line and Devolution
MTPS I BM Unit II AOH-2022-23 FG Duct A side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints between
MTPS I Mill Plant Unit I Overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder Renewal of hot air gate seal during Annual overhaul 2024 25
E-tender for the procurement of various sizes of computer papers - 5 items as per Annexure furnished
MTPS I TM Unit I Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC1 Ejector 3B and Renewal of Gasket at Deaerator main flange Deaerator