Loading…
Loading…
6,236 results • Best match
MTPS I BM Unit III Boiler pressure parts AOH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers etc
MTPS I BM Pressure parts Unit III Boiler Statutory inspection 2020 21 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS I TM Unit II Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit II during AOH 2021 22
MTPS I Mill Plant Unit II Overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venturi vanes and venturi collars in Mills 2B to 2F during Annual overhaul 2023-24
MTPS I - Civil Circle - Extension of existing driver rest room and toilet room in front of canteen building
MTPS I - Civil Circle Replacing the damaged RCC Cover slabs in the existing drains in the A-Zone area and providing new drainage in boiler area of Stage I and II and new MS gate in the west side of DM plant area at MTPS I
MTPS I BM DM Plant Unit II and III AOH 2021 Overhauling of Hot well makeup pumps 4 Nos and Boiler fill pump 2Nos
MTPS I Mill Plant Unit II Renewal of eroded worn out Expansion Joint and Renewal of insulation and GI sheets in hot air duct during AOH 2022 23
MTPS I TM UNIT III Changing the defective BFP Suction valve 3A and Gasket renewing changing the eroded HD 1 2 14 HD 15 control valve outlet side reducers bends and allied works
MTPS 1 Mill Plant Unit IV Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I CA CWS I CT II Painting of Hot water basin sun shield roof doors and Cleaning the algae and other foreign materials on CT ID Fan blades etc
MTPS I BM Unit III AOH 2024 25 Renewal of various Saw tooth expansion joints in FG ducts Air ducts and other related works etc in both A and B sides
MTPS I CA RWS Replacing the eroded vertical outlet pipe line 350NB of Service water Overhead tank and Extension of Raw water pump RC pipe line to river bed
MTPS I - Civil Circle Providing RCC gate pillar and fixing of MS gate in the existing chain link fencing in the road leading to RWPH at MTPS I
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 5 Nos including static balancing of fan blades painting of gear box base frame channel structures fan blades hub and arm sleeves grills and hand rails etc in cooling tower Stage II
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 4 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower Stage II
MTPS I BM Unit I to IV Boiler Pressure Parts Deployment of expert for Safety Valve floating by Trevitest method during AOH 2022
MTPS I BM Unit II AOH 2022 23 Flue Gas duct B side Patch up works and other repair works between APH out let to ESP inlet
MTPS I BM Unit I Rotating parts Boiler Statutory Inspection 2020 21 Overhauling reconditioning of CERM and EERM gear boxes and other related works
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I TM UNIT II changing the defective valves of IPT Flange and Stud heating line AS 8 BFP RC 2A by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line
MTPS I TM Unit IV Steam leak arresting by Renewal of Discharge Cover O Ring in Boiler Feed Pump 4A and Steam leak arresting in Boiler Feed Booster Pump 4C
MTPS I Mill Plant Unit IV Strengthening of reject chute mouth area At under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 4A to 4F during Annual overhaul 2023 24
MTPS I Civil Circle - Supplying and fixing of Eye wash system in 13.50mtr TG floor stage I and II and 10.20mtr station battery room of Power house building at MTPS I
MTPS I Mill Plant Unit I Strengthening Rectification of raw coal bunkers 1A to 1F leak arresting work by patch welding and Providing stiffeners during AOH 2023 24
Mettur TPS I Mill Plant AC Plant AC Compressor 3 Evacuation of Mettron gas from Compressor overhauling of compressor gas line valves Cleaning the Refrigerant line etc
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Servicing of various size actuators and allied works
MTPS I BM Unit II ESP COH 24 25 Cutting and removing the damaged bottom portion fabrication and fixing the new plate for the collecting electrodes etc
MTPS I TM Unit II Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit II AOH 2022 23
MTPS I Mill Plant Unit II Overhaul of hot air dampers cold air Dampers cold air gates hot air gate power cylinder renewal of hot Air gate seals during Annual overhaul 2023 24
MTPS I TM Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera of 9 1 seating capacity or an equivalent Vehicle on hire basis including driver for the official use of EE TM for the period of one year from 06 10 2024 to 05 10 2025
MTPS I Civil Circle - Repair works to the TMTM union office building in temporary shed in front of main gate at MTPS I
MTPS I BM- Servicing of sky climber drive and its auxiliaries, Reconditioning of sky climber bed and platform materials and Overhauling of gear box assemblies etc, for the Year 2021
MTPS I TM Inspection and Rectification of defects in Limit Switches Control panel circuits in the 125 30 tonnes Station EOT Crane No 1
MTPS I Mill Plant Unit III Reconditioning of released SS elliptical feeder discharge chutes from Unit III and Unit IV
MTPS 1 Mill Plant Unit II Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy etc
MTPS I BM Unit III Boiler pressure parts AOH 2022 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling Checking and renewal of Nitrile rubber seal of CWP 1A 1B and 1C of Unit I during AOH 2021 22
MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2024 2025
MTPS I BM Unit I to IV Boiler Pressure Parts Deployment of expert for Safety Valve floating by Trevitest method during AOH 2023
MTPS I Civil Circle Forming and raising the east side LAD bund using ash mixed with mill reject and red gravel for a length of 100m from ash over flowing portion (Reach III)
Supply of Rubber Discs for Impact idlers 560Nos. as per Annexure enclosed
MTPS I CA FP Break down Preventive maintenance works such as patch welding in Hydrant Emulsifyre header replacement of fire hydrant post etc
MTPS I BM Unit III Annual overhauling 2022 23 Overhaul of ESP CD pass Internals and related works
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge etc
MTPS I TM Unit IV Overhauling of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling work 2023 24
MTPS I CA CWS I Strengthening and renewal of the most damaged corroded and eroded portion of existing Hot water header Raiser MS Pipe of 1600 mm dia 11 meter height western and eastern side and including painting in Cooing Tower I of Unit I
MTPS I Mill Plant Unit II Removal of accumulated ash from the Horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level for mills 2A to 2F during AOH 2023 24
MTPS I Mill Plant Unit III Renewal of eroded worn out Expansion joint and renewal of insulation GI Sheet in hot air duct during AOH 2023 24
MTPS I TM UNIT IV Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2021 2022