Loading…
Loading…
6,236 results • Best match
MTPS I TM Unit IV Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit IV
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal and Painting of Intake Screen of Cooling water Pumps 2A 2B and 2C during AOH 2022 2023 of Unit II
MTPS I TM Unit II cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets
MTPS I BM Unit IV Boiler Pressure parts AOH 2020 21 Overhauling of HP LP valves and replacement of defective valves
Mill Plant Unit IV Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge chute platforms coal pipes mill floor and mill gearbox of mill 4A
MTPS I BM Unit II Boiler pressure parts AOH 2022 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I TM I Unit II Dismantling Inspection and Overhauling of Alfa Laval Centrifuges 2A and 2B during COH 2024 25
MTPS I CA CWS I De watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier II and Overhauling of Sludge disposal pump and Overhauling of Air vent valves during AOH 2021 22
MTPS I BM Unit II Boiler Pressure parts AOH 2022 Maintenance of boiler drum and all safety valves and allied works
MTPS I Mill Plant AC Plant AC Cooling Tower Stage II Strengthening the damaged portion of the FRP coated MS sump tank by removing the structural frame work and damaged Fills grid etc
MTPS I TM Lifting of spare HP IP LP Turbine Rotors from Rotor box Rotating 180 degree and kept in Rotor box etc during 2024 25
MTPS I BM AOH 2023 2024 Unit I Complete overhaul of APH A and B Sides and other related works
MTPS I Mill Plant AC Plant UCB stage I and UCB stage II Conference hall and CE and SEs chambers dismantling the existing air diffuser and return air grill closing the opened portion with GI sheet dummy by providing air holes temporally etc
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I Mill Plant Unit IV Complete inspection of Mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft if necessary and renewal of worm gear hub etc
Mettur TPS I Mill Pant Unit II Renewal of the worn-out Mill under bowl Door frames Doors in Mill 2A to 2F during Annual Overhaul 2023 24
MTPS I Mill Plant Unit IV Hard facing of vertical coal pipe 1 mtr length after Transition piece 24 Nos in Mill 4A to 4F during Annual overhaul 2022 2023
MTPS I Mill Plant Units I to IV Cold Vulcanizing of 1200mm width feeder Belts
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Over hauling of secondary air dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
MTPS I TM Unit II Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring etc
MTPS I TM Unit II Overhauling and renewal of worn out spares and Bearings and Commissioning of Heater Drip Pump 2A and 2B during COH of 2024 25
MTPS I Mill Plant Unit II Hard facing of MS bend during AOH 2020 21
MTPS I TM UNIT II Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2021 2022
MTPS I TM Unit III Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Boiler License Renewal Work 2020 21
MTPS I TM Unit III Overhauling and commissioning of Heater Drip Pump 3A and 3B during AOH of 2021 22
MTPS I BM Unit I Boiler Pressure parts AOH 2021 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine and Phosphate Dozing Pumps during AOH of 2022 23
MTPS I BM Unit I Boiler pressure parts AOH 2024 Maintenance of boiler drum and all Safety valves
MTPS I - Civil Circle - Construction of Security room with rest room for the use of Security guards in the FODPH area in 169W road side near compound wall at MTPS I
MTPS I Civil Circle - Cleaning of service water tanks of Residential Buildings and Ground Level Water tank and white washing one coat to the inner surfaces of tank with white cement in Thermal Nagar-11
MTPS I BM Unit II AOH 2021 22 FG Duct B side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
MTPS I BM Unit III Rotating parts AOH 2022 23 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I BM Unit III Boiler pressure parts AOH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I Mill Plant Unit I Releasing the journal spring assembly from the journal door dismantling the assembly for inspection complete servicing of journal spring assy etc
MTPS I Civil Circle Periodical removal of accumulated silt and Slush in E-W and N-S main drains meant for WT 2 and 4 in CHP area in MTPS I
Procurement of 200 NB Butterfly valve 02 Nos
MTPS I Mill Plant AC Plant Unit I Annual overhaul Air Washer System Epoxy painting of the blower 1A and 1B Discharge duct and the spray system spray nozzles cleaning Flushing the spray system pipe line
MTPS I - Civil Circle - Replacing the damaged ACC Sheets with new galvalume sheets (0.8 mm) for the South side roof top of Boiler Unit-IV at MTPS I
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during AOH of 2023 24
MTPS I - Civil Circle - Periodical Cleaning of Underground sump and Residential service water tanks in Thermal Nagar 1 to 10 areas for the period of six months from the date of commencement of the work
MTPS I Mill Plant Unit IV Overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venturi vanes and venturi collars during annual overhaul 2022 23
MTPS I - Civil Circle - Replacing the existing thermocool false ceiling by new one to the old IB suit No.1 and replacement of steel sections instead of timbers in roof of portico and painting the interior and exterior walls of old IB at MTPS I
MTPS I Mill Plant Unit I Reconditioning of mill outlet elbow released from Unit I during AOH 2021 22 by applying ceramic wear coat
MTPS I BM AOH 2025 Unit III Boiler pressure parts Cutting and removing of heavily wornout CRH and HRH tubes roof plate and fabrication and erection of new corten steel sheet 3.15mm thick and allied works in the penthouse area at 52 mtr level
MTPS I Mill Plant Unit IV Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills in Mill 4A to 4F during AOH 2024 25
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in Unit IV condenser during AOH of 2022 23
MTPS I - Civil Circle Renovation works to the old damaged mosaic floor by replacing the tiles and other allied civil works to enhance the stability and aesthetic environment of the CEs residence V type quarters in Thermal Nagar-1.
MTPS I TM Unit II Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 GC 1 Ejector 2B and Renewal of Gasket at Deaerator
MTPS I TM I Dismantling Inspection and Overhauling of Pennwalt Centrifuges 3A and 3B in Unit III during 2020-21
MTPS I TM Unit III Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH- 3 and 4 GC 1 Ejector 3A etc