Loading…
Loading…
6,231 results • Best match
Mettur Workshop LM section IV Manufacturing of electrical line materials Welding of Channel cleats with angle for fabrication of HTTI Fittings including Lifting and Transporting Painting and delivery at central stores for the month of June 48000
Mettur Workshop LM section VI Manufacturing of Electrical line materials Fabrication of 3.5 Feet V Channel cross arms for the month of March 11500 Nos.
Watering and trimming the lawn in front of Canteen, Chemical lab, Fire station building, Dispensary and south side of CWPH and CTBD tank etc, for a period of 180 days from the date of commencement of work.
Welding of Three and half Feet V Channel cross arms including receipt of cleats partially fabricated V Channel cross arms from Workshop transportation V cutting V forming v Channel welding cleat round hole punching cleat welding Painting etc..
Transporting, Welding, Bending, Greasing of threaded portion, painting of 33KV stay Rod AS per Drawing including receipt of cut lengths from workshop and delivering as Stay Rod 33KV along with supply of M18MS Nut and Washer at Workshop, cost of consu
Spreading of Mill rejects below and around power evacuation towers at south side of switch yard to curtail jungle growth.
Manufacturing of Electrical line materials Fabrication of 3.5 Feet V Channel cross arms for the month of April 11500 Nos
Upkeeping and removal of dust and dirt in Chemical house, clarified water pump house, roads and drains in PTP area, RWPH and Stores area for a period of six months
MTPS I O and E Division Assisting in Sorting and segregation of completed Log Books and Reading Registers and arranging for bundling Packing Transporting loading unloading excavating and burying towards destruction of completed log books
Procurement of Spares for ElectricalActuator make Shanghai or Equivalent Model 80AI 6 items
Bending of stay eye bolt for 11 22KV line-AS per drawing-including receipt of cut length from workshop, transporting, threading, bending, welding, painting and Delivery with M18 GI Nut and stacking of Eye Bolt at Mettur work shop-50000 Nos
Mettur Workshop LM section VIII Manufacturing of electrical line materials Partial Fabrication of 5 Feet V Channel cross arms 10000 Nos
Supply of HFO Heaters and HFO/HSD Forwarding Pumps safety valves 4 items
Partial Fabrication of 5 Feet V Channel cross arms for the month of April 10000 Nos
Spares suitable for Voltas make 1.5 Ton and 2.0 Capacity Split AC Unit 6 items
Construction of rest room for the fire service personal near DG house, providing plinth protection arrangements around the MRT store room and other miscellaneous works in Chlorination building of MTPS-II
Complete Mechanical Seal Assembly-2 items for Boiler Feed Pump FK6D30
Dismantling of existing damaged Masonry rain water drain and Providing the RCC drain from Southern side of SS yard road to compound wall at K.R.Thoppur 400KV SS.(Ch.00.00m to 13.00m).
Providing PCC pavement below the CT makeup pipe line on the south east corner of switchyard peripheral road in MTPS-II.
Providing shelf arrangements inside the Time office Building for keeping Civil Project records, O and E Division records and for Oil Ash Handling Sub Division offices of MTPS II
Watering to the tree saplings planted at various locations inside MTPS-II plant area using tractor trailer and clearing the jungle growth in the planted area for a period of 180 days from the date of commencement of work
Replacement of worn-out damaged aluminium doors windows, Providing and fixing of new UPVC Un-Plasticized Polyvinyl Chloride windows, aluminium doors windows and PVC doors in control room 400 KV SS at K.R.Thoppur.
Construction of a Store room for Electrical Maintenance Division near chimney in ESP area.
Supply of V-Belts 05 Items
Sale of Condemned Items, Ferrous and Non Ferrous Scraps available at Mettur Workshop
UpKeeping by removal of dust and dirt in all floors and operating the valves of water supply lines of ESP and MCC Control Room, Central office, Fire station building, ETP MCC room, toilets in ESP control room and near chimney etc. for a period of 18
Mettur Workshop circle Maintenance section Providing One number either a diesel driven Ambulance Van or Petrol driven maruthi Ambulance van with all vital life support such as oxygen stretcher etc on hire basis for the official use of employees
Procurement of PLC Spares - 9 items (Honeywell or equivalent) BOP Area in AHP, BAS, PTP, RWPH, DM Plant, FWPH, H2 Plant, FOPH, Compressor PLC, Chlorination Plant and Slurry Pump House.
Procurement of Spares for SAN Locomotives 7 8 9 of coal handling Plant 1 Item
supply of Saw Tooth Expansion Joints for Hot Air Duct of XRP 803 Mills Style I III 2 items
Sprinkling of water over the roads inside MTPS-II using tank mounted tractor trailer for dust suppression purpose for a period of 180 days from the date of commencement of work.
Upkeeping of roads and berms of 800E Road, 735E Road, 585E road, 1255N road, 967E road, road leading to Dispensary, Two wheeler sheds, Dispensary and Chemical lab etc. for the period from 23.08.2021 to 18.02.2022.
Welding and Painting of Stay Hook including receipt of Semi finished product from workshop Welding Painting As per drawing Handling and Stocking of Stay hook 11and22 KV at Central Stores Premises 50000 Nos
Providing PCC pavement below the deluge valves (FDV-108), Hydrant valves (HDV-109) and water monitors in Fuel Oil Pump House area and other miscellaneous civil works in FOPH.
Procurement of Electro Pneumatic Positioner 2 Items
Formation of Garden on the western side of NDCT in Phase-2
Mettur Workshop Line Materials Section V Painting of 3 Phase LT Channel X Arms including partial material handling and consumables 50000 Nos
Supply of spares for HPMS System in XRP 803 Mills 02 items
Line Materials Section V Section Painting of 3Ph LT Channel Cross Arms including material handling and cost of consumables 50000 Nos for the month of April 2021
Up Keeping by removal of dust and dirt in all floors and operating the valves of water supply lines of ESP MCC Control Room, Central office, Fire station building, ETP MCC ro
Improvement works to the existing Eastern Side RR mmasonry Protection wall in 400 KV S.S. premises at K.R.Thoppur.
Providing Mill rejects in the portion between eastern side compound wall and Silo road from Skew bridge upto MTPS I Silo to curtail jungle growth.
Overhauling of mill reject system top bottom gate complete assembly renewal of worn out parts overhauling of screw conveyor gear box with screw conveyor complete assembly
Formation of Garden on the western side of NDCT in MTPS-II
Watering to the tree saplings planted at various locations inside MTPS-II plant area using tractor trailer and clearing the jungle growth in the trees planted area for a period of 180 days from the date of commencement of work.
Providing pocket storage shed nearer to the office of fire protection system to keep the pipes and valves in safe custody .
Dismantling of existing damaged Masonry rain water drain and Providing the RCC drain and precast slab from 230KV yard to southern side road at K.R.Thoppur 400KV SS. (Ch.15.00m to 25.00m).
Supply of O ring with complete seal kit suitable Hydraulic loading oil cylinder 36 set
Procurement of Spares for 11 TR 22 TR Package unit 11 Items
Mechanical and civil maintenance work Mettur workshop premises for period of 1 year