Loading…
Loading…
6,231 results • Best match
Formation of Garden on the rear side of Cooling Water Pump House in MTPS II.
Arresting fly ash leakage all-round SILO-1 and 2 and Bottom ash SILO-1 and 2 in between RCC shell top and roof deck sheet and around supporting angles of fly ash silo 1 and 2.
House Keeping by sweeping , cleaning of Chemical house, clarified water pump house, Roads and drains in PTP area and RWPH for a period of six months from the date of taking over of site.
Construction of lean to roof two wheeler sheds and providing ladder to water tanks at Thermal Nagar-12 (Near BSNL office).
Construction of permanent shed with mono rail arrangements and other miscellaneous civil works in ETP / STP area of MTPS -II
Procurement of O Ring with complete Seal Kit suitable for Hydraulic Loading Oil Cylinder 12 Sets 1 Set consist of 19 nos O rings and Roller Expansion duct boot air bellow 21 Nos
Reconditioning of Primary Air Coal Bend Type I 4 Nos
Providing One Number Diesel Driven Ambassador Tata Indica or equivalent car on hire basis for official use of the Superintending Engineer MechanicalII
MTPS I Operation Circle Chemical Division Biannual work Engaging of external agency on works contract basis for Collection of various samples for analysis works for a period of 120 days from the date of awarding the work Regarding
Clearing the jungle and cleaning the drains and pavement on either side of the road from Silo to Skew bridge culvert, Cleaning the drains in the Silo area, 1255 N road, around Ash slurry Pump House of MTPS-II
Providing and fixing of anodized aluminium windows in various floors of STG and Mill bunker building including replacement of damaged aluminium windows with new sliding anodized aluminium windows in fire station building and providing fixing of new
House Keeping by sweeping, Cleaning of all floors of ESP MCC Control Room, Central office, Fire station building, ETP MCC room, Maintenance of toilets in ESP control room and near chimney, maintenance of potable and service water supply to the abov
Replacing the damaged floor tiles and providing cupboard arrangements in ETP Control room and store room, modifying the existing unused Dining area in canteen as Record room for Accounts and Administrative wings
Providing Concrete coping to the Column pedestals of ESP Hoppers and allied structures, concrete beds for new cooling air fans near ID fans A and B, partition in compressor PLC room TG building west end at 0M of MTPS II
Providing one number diesel driven Van Tata Sumo Toyota Qualis Mahindra Xylo Chevrolet Tavera or its equivalent on hire basis for the official use of Executive Engineer Civil Project Division Mettur Thermal Power Station II for the peri
Providing one number diesel driven Tata Sumo Tavera or equivalent vehicle on hire basis for the official use of Executive Engineer Civil CM Dn Mettur Thermal Power Station II for the period of one year from the date of utilization of vehicle
Providing One Number Diesel Driven Tata SumoTavera Xylo Bolero on hire basis for official use of Executive Engineer CHP II Division MTPS-II
Supply of Seals 7 Items
House Keeping of Switchyard buildings, CPU Building, FOPH, CWPH, FWPH, Project office buildings and nearby roads for the period from August 2019 to December 2019 in MTPS-II Premises
Providing Chain link fencing with gate and Concrete flooring for the distribution transformers in weigh bridge area, ASPH area near JT-7 area and other allied Civil works in MTPS-II
Providing one number diesel driven Ambassador Tata Indica(or) equivalent car on hire basis for the official use of the Superintending Engineer Civil /Mettur Thermal Power Station II for the period of 365 days from the date of
Providing screed PCC (-) 3.50m level, M.S. Handrailng, cutting removing of M.S. rungs in mill bay and colour washing in Mill bunker building.
Placing of all loco one by one from Wagon Tippler V and VI to Loco Shed for attending the maintenance works on Locos
MTPS I Operation circle Provision of one number diesel driven TATA Indica TATA Indigo (or) Equivalent car on hire basis for the official use of Superintending Engineer Operation MTPS-I for the period of one year from 01.09.2019 to 31.08.2020
Operation of pumps for filling water in water tanks, upkeeping of silt pits and drains in the residential quarters of MTPS-II in RE quarters and near LIC building for the period of five months from the date of taking over of site.
Cleaning and removal of ash silt and other waste materials from the drains to the 585E road, 967N road, 735E road, 800E road, alround Canteen, Chemical Lab and dispensary etc. for a period of six months from 01.10.2019 to 31.03.2020.
MTPS 1 Operation Circle TS Provision of one number Diesel driven Van of seating capacity 9 and above including driver on hire basis for the Official use of Executive Engineer Technical Services and Executive Engineer CMP etc
Formation of Garden on the Southern side of CT Blow Down Tank of MTPS II.
Operation of pumps for filling water in water tanks, upkeeping of silt pits and drains in the residential quarters of MTPS-II in Thermal Nagar-11 for the period from 09.10.2019 to
Sprinkling of water over the roads of MTPS-II for dust suppression purpose for a period of 120 working days from date of handing over of site.
Operation of pumps for filling water in water tanks and upkeeping of floors in CHP Control Room, upkeeping of toilets in CHP Control Room
MTPS I Operation Circle T and E Division Conducting Occupational Health and Safety Audit of MTPS-I and submission of Safety Audit report.
MTPS 1 Operation Circle O and E provision of one number Diesel driven TATA SUMO van on hire basis having seating capacity of 9 in all including driver for the official use of EE Generation of MTPS I for the period of one year
Supplying and laying of GI pipe line for upkeeping of mill area at ground floor and feeder floor area 17M and providing separate service water line to switch yard area of MTPS-II.
Upkeeping and removal of dust and dirt in Chemical house, clarified water pump house, roads and drains in PTP area and RWPH for a period of six months from 20.01.2020 to 17.07.2020.
Up Keeping by removal of dust and dirt in all floors and operating the valves of water supply lines of ESP, MCC Control Room, Central office, Fire station building, ETP MCC room, toilets in ES
Providing RCC Retaining wall to the slope along the Road No.27 and 28 near MTPS -II Coal yard from Chainage 219.00m to 261.00m.
Providing RCC Retaining wall to the slope along the Road No.27 and 28 near MTPS -II Coal yard from Junction Tower-1 Chainage 459.00 m to 484.00m.
Watering to the tree saplings planted at various location inside MTPS-II plant area using tractor trailer for the period from 18.12.2019 to 31.03.2020.
MTPS I Operation Circle Chemical Division Engaging of external agency on works contract basis for Collection of various samples for analysis works for a period of 120 days from the date of awarding the work Regarding
Removal of collected debris from the dust bins and accumulated debris in entire plant area for a period of six months from 01.02.2020 to 31.07.2020
Operation of pumps for filling water in water tanks, upkeeping of silt pits and drains in the residential quarters of MTPS-II in RE quarters and near LIC building from
Providing partition for office accommodation of Electrical sub Division, Cub boards in store room and rearranging the partition of coal section in the First floor of CHP control room of MTPS-II.
Providing RCC trench for laying cable and elocating of pillar box in Thottilpatty residential quarters area inside and outside of Thermal Nagar-11 for enabling construction of new quarters
Providing PCC Retaining wall to the slope along the Road No.27 and 28 near MTPS -II Coal yard from Chainage 484.00 m to 519.00m.
Providing concrete flooring with drainage arrangement in the WT 5 , 6 areas, fixing concrete marking stones along the tracks in wagon tippler area and replacing the damaged floor
Upkeeping by removal of dust and dirt in all floors, toilets and operating the valves of water supply lines etc in the service building for the period from 20.01.2020 to 20.05.2020.
Upkeeping the ground floor of Boiler area, PA, FD and ID Fan areas for the period from 02.01.2020 to 10.06.2020.
UpKeeping of STG building by cleaning, mopping of all floors, cleaning of toilets, regulation of potable and service water etc., for the period from 02.01.2020 to 31.05.2020.
Construction of turbine lube oil storage shed in O meter area near turbine MOT emergency drain pit and other miscellaneous works in the transformer yard of MTPS-II.