Loading…
Loading…
6,236 results • Best match
MTPS I TM Rewinding of one No 132KW screw compressor motor stator coil Dynamic balancing of rotor Replacement of Bearings Mechanical Seal Kit and assembling of motor in SAC 3A
MTPS I TM Unit I Renewal of wornout cooling water Inlet Rubber expansion joint in LHS Condenser of Unit I
MTPS I TM I Lifting Cleaning Inspection and Reconditioning of Lifting tackle of HP IP LP Casings Rotors TG Bearing and Obtaining load test certificate during 2025 26
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Rectification Replacement of defective tubes in burner corner water wall tubes and bends steam cooled side wall and fin welding at Boiler Ist IInd pass area
MTPS 1 Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of journal and spring assemblies etc
MTPS I BM Unit I and III Fabrication of HRH header bends and coil circuit bends at pent house area for AOH 2021
MTPS I Civil Circle - Up keeping and operation of sewage water treatment plant equipments and up keeping of gardens in front of service building and center median of Double Road and Lawn in Front of MTPS I gate for the period of one year
MTPS I TM I Breakdown Maintenance work in Main Turbine and its Auxiliaries in Unit I to IV for a period of One year during 2023 24 as and when required basis
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Reconditioning and Hard facing of used Worn out square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS 1 BM Unit IV Annual overhauling 2025 26 Overhaul of ESP AB CD E and F pass Internals and related works
MTPS I BM Unit IV Boiler pressure parts AOH 2024 Rectification Replacement of defective tubes in LTSH Coils and Economizer hanger at boiler IInd pass area
E-tender invitation for the supply of various sizes of idlers for conveyors and belt feeders - 7 items as per Annexure furnished
MTPS I TM Unit IV Inspection and Rectification of feed water pressure drop across HPH 5 by releasing the drain cooling zone and condensing zone spiral coils 261 Nos complete cleaning of the sediments foreign materials in spiral coils
MTPS I BM Unit II Boiler AOH 2021 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I st and II nd pass area
MTPS 1 Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing worm
E-tender invitation for the procurement of various rubber blocks for wagon tipplers - 4 Sets as per Annexure furnished
MTPS I BM Pressure parts Unit I Boiler Statutory inspection 2020 Water washing of boiler Ist and IInd pass area, Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS I BM Unit III Boiler pressure parts AOH 2024 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM AOH 2021 22 Unit IV Boiler pressure parts Replacing overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
MTPS I BM AOH 2022 2023 Unit II Complete overhaul of APH A Side and other related works
MTPS I BM Unit II Rotating parts AOH 2025 26 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS 1 BM Unit IV Annual maintenance 2025 26 Hot primary air ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and allied works
MTPS I TM UNIT IV Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2025 2026
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I TM Reconditioning of 1 No defective cartridge of Boiler Feed Pump Model FK6D 30 Cartridge No P 86084 released from BFP 4A
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit I AOH 2025 26 Strengthening of the eroded portions of ESP hopper FG duct from ESP outlet to chimney and other related works in both A and B sides
MTPS I TM Unit III Overhauling of Turbine Lub Oil Cooler Booster Pumps Overhauling of Hydrazine Dozing Pumps and Phosphate Dozing Pumps during Boiler license renewal 2020 2021
MTPS I Mill Plant Unit III Applying two layers ceramic wear coat Eromat at mill outlet elbow and inner cone released from Unit III during AOH 22 23
MTPS I Civil Circle Up keeping of Toilet, Garden (for the period from 05.08.2021 to 31.08.2021) and STP operation (for the period from 09.07.2021 to 31.08.2021) in Service building and Power house building at MTPS I
MTPS I Mill Plant Unit IV Overhauling of classifier assemblies venturi vanes venturi Collars etc.during annual overhaul 2020 21
MTPS I BM Unit III Boiler Pressure parts AOH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I Civil Circle Annual over haul of Unit IV 2025-2026 Providing one coat of Bituminous Black paint to the Concrete columns, beams, side walls and floor area to the cold water basin in Cell.No.1 to 10 of Cooling Tower Unit IV
MTPS I Civil Circle - Repair works to the existing damaged mosaic floor tiles by fixing of new vitrified floor tiles, dadooing the side walls of bath and toilet including attending other allied civil works to the Suit No.3 and 4 of New Inspection
MTPS I TM Unit III Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit III during AOH 2024 25
MTPS I Civil Circle Periodical removal of accumulated silt and Slush in E-W and N-S main drains meant for WT1 and 3 in CHP area in MTPS I
Mill Plant Unit I Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos in Mill
MTPS I CA CWS I Load testing of 10 Ton Electrical hoist 1 No 15 Ton Electrical hoist 1 No and 30 Ton EOT crane 1 No and Revisioning of brake assemblies with thruster units
E-tender notice for the procurement of Copier paper for Mettur Thermal Power Station-I - 400Ream
MTPS I BM Unit I Boiler Pressure Parts AOH 2021 Cleaning of boiler structures from 0 to 52 m Level etc
Procurement of Fluidizing pad ceramic tiles 03 items
MTPS I TM Unit IV Inspection and Complete Overhauling of Voith Hydraulic Coupling of Boiler Feed Pump 2A during AOH 2020 21
MTPS I TM Unit III Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater and its accessories etc
MTPS I BM Unit II AOH 2023 24 Renewal of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I TM Unit IV Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 2 of Instrument Air System overhauling of Refrigerant Dryer overhauling of 150mm NRV valves an
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis
MTPS I - Civil Circle Providing one coat of Bituminous Black paint to the Concrete columns, beams, side walls and floor area to the Cold water basin in Cell.No.1 to 10 of Cooling Tower Unit III
MTPS I Civil Circle Annual Over haul 2025-26-Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower I
MTPS I Mill Plant Unit II Reconditioning of released SS elliptical feeder discharge chutes released from Unit IV