Loading…
Loading…
1,062 results • Best match
DEmolishing ,clearing grass Erath work PCC 1 4 8, 1 3 6 ,1 2 4,centring and shuttering pcc 1 1.5 3,RCC,Plastering,Earth filling
Demolishing stone rubble masonry earthwork excavation random rubble masonry PCC RCC centering and shuttering Steel reinforcement Laterite masonry Structural steel work plastering finishing walls with emulsion
This estimate includes demolishing the existing half wall Aluminium fabrication partition floor tile damaged PVC ceiling etc. Construction of RCC plinth belt solid concrete block masonry
Clearing jungle, demolishing cc ,Earth work exczvation,PCC 1 4 8,Centring shuttering,Pcc 1 3 6,RCC ,Plastering, PVC Weep hols,Quarry muck,Earth filling
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1 15 3 Reinforcement Centering and shuttering earth filling Plastering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement, Filling available earth Plastering etc
Demolishing cc 1 3 6and cc1 4 8,Earth work excavation, cc 1 4 8,centring and shuttering,cc1 3 6,cc1 2 4, plastering, etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement Filling available earth Plastering etc
The provisions included in the estimate include demolishing solid block in damaged areas, dismantling plastering, solid block, 12mm plastering, scrapping and painting with emulsion and enamel.
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement Filling available earth Plastering etc
Earth work in excavation by mechanical means Demolishing brick work manually Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually
The provisions included in the estimate are clearing jungle, demolishing rubble masonry, earthwork in excavation,RCC centering and shuttering, steel reinforcement, filling earth for road formation
proposed to rise the existing side walls of the drainage upto 15 cm height. Also provisions for demolishing existing cover slab and providing new cover slab
Clearing jungle,demolishing stone rubble,dismantling old plaster,Earth work,Dry rubble masonry,12mm plaster,RR with hard stone,CC1 2 4,Solid block masnry etc.
This estimate is prepared as the request from Employment officer mavelikara.This estimate carrying demolishing the existing damaged cabin ,cleaning the floor tile,removing existing window shutters
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Steel reinforcement Filling earth Plastering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering, reinforcement Plastering ,filling available eath etc
Demolishing and Dismantling work Staircase concrete Door and window fixing Truss work With GI sheet Solid block work for Toilet Finishing work Electrical and plumbing works
In this estimate inside and outside painting, demolishing tile, floor tile andwall tile in tiulet, plumbing work, sanitary fittings, aluminium work, water proofing work in toilet
Demolishing PCC/Soling.Earth work excavation.R.R work for foundation,basement.Shuttering,steel works.RCC/PCC work.Solid block masontry,cement plastering,Priming coat.Virtrified/Ceramic tiling.Wood/uPVC Joinery works.Plumbing,sanitary,Electrical works
Supplying and stacking well matured straight coconut post Driving down coconut pile Demolishing R.C.C. work Centering and shuttering Steel reinforcement for R.C.C work Reinforced cement concrete etc
Demolishing cement concrete,Dismantling DR,Earth work, Cement concrete,DR with departmental stone, Dry rubble masonry, Centering shuttering,RR masonry, Cement concrete, Steel reinforcement, Plastering, Earth work
evictions in various roads under angamaly section.Items included in the estimate are laying boundary pillars, man mazdoor for clearing and other works, JCB for demolishing the encroachments,
Maintenance work of class room. The provisions included are truss roof by demolishing old sheet roof, soild block,vitrified flooring, extreior and interior painting, enamel painting etc.
Concrete Pavement Road Work includes demolishing cement concrete stone rubble masonry earth work excavation filling with quarry muck PCC steel reinforcement RCC cement plaster centering and shuttering
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement weep holes Plastering filling earth etc
Demolishing of existing toilet,Earth work leveling and DR retaining wall PCC RCCM25, RCC Solid block work,cement plastering, Water proofing coarse, Wood work, vitrified tile flooring
jungle clearing, demolishing brick work and old plastering, dismantling doors and windows, providing brickwork and plastering, provision for electrical, water supply and sanitary arrangements, colour washing etc
Flooring Wall tiling common roomToilets renovation Female rooms Aluminium Windows Fixing etc Provisions are included in the estimate for demolishing tile concrete Solid block masonry Plstering etc
Converting works includes Demolishing works Solid Block Masonry V board paneling Painting Aluminium Work Tiling Gate supplying sanitary items ACP Work Plumbing Electrical works and Purchase items
Civil works
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement filling available earth weep hole Plastering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement PVC weep hole earth filling Plastering etc
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
Clearing Jungle,Demolishing CC,Earth Work Excavation,PCC 1 4 8,centring and Shuttering,PCC 1 3 6,PCC 1 2 4,Re inforcement,Plastering,PVC WEEP HOLES
Dismantling tile flooring Vitrified and ceramic tiling Demolishing CC Plastering Providing CC 1 2 4 European water closet towel rod health faucet long body tap soap dish mirror
Clearing Jungle ,Demolishing CC,Earth work Excavasion, PCC 1 4 8,Centring,PVC WEEP HOLES,PCC 1 3 6,PCC 1 2 4,Plastering,Earth Filling 5 schemes
Clearing jungle,Demolishing cc,Earth work,PCC 1 4 8,centring and shuttering,PCC 1 3 6,PCC 1 2 4,Steel re inforcement,plastering,PVC WEEP HOLES
Dismantling GI and CI pipes, tile work, demolishing cement concrete, providing cement concrete water proofing treatment, ceramic glazed wall and floor tiles, CI manhole cover, solid block masonry
Construction of Cultural centre and Self employed Entrepreneurs hall( Demolishing existing old building, Civil works, Plumbing works and Electrical works), Construction of Culvert, Retaining wall of stream, etc.
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
demolishing rcc earthwork excavation laterite masonry plastering cement concrete supplying and fixing steel pipes frames sectioning supplying 6mm and 40 mm metal spreading 6mm and 40mm steel work
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement Plastering Interlocking Tiles for approach road etc
Clearing Jungle,Demolishing cc,Earth work Excavation,PCC 1 4 8,Centring,PVC WEEP Holes ,PCC 1 3 6,PCC 1 2 4,Plastering, Earth Filling 4 scheme
Demolishing and Dismantling work Renovation of Godown building Truss and Roofing sheet works Sanitary Installation Finishing work Repairing works Compound wall with laterite stone Electrical and Plumbing works
Clearing,Demolishing Erath Work ,PCC 1 4 8 ,centring and shuttering,PCC 1 3 6,PCC 1 2 4 PCC 1 1 5 3 RCC,Plastering,Earth Filling
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
The scope of this auction includes taking all reusable and other scrap materilas complete after safe demolition, dismantling and removal of the decommisioned OHSR.