Loading…
Loading…
1,062 results • Best match
Upgradation works includes Demolishing works Painting providing polycarbonate sheet step wood works Tiling supplying sanitary items Brick work Electrical works and Purchase items
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 Centering and shuttering Plastering filling contractors own earth etc
Deposit work PWD (Bridges) Temporary shifting of pipe lines in connection with the demolishing of Raman chira bridge at Edayar in Koothattukulam Municipality.
Dismantling tiled Roofng with battens ,Demolishing brickwork,Brick masonry,12mm plastering,structural steel work,coolies,wall painting ,fixing on roof pressed clay tile
Upgradation works includes Demolishing Brick work Providing Wooden Doors Solid Block masonry Plastering Painting supplying sanitary items Aluminum Partition Landscapping Electrical plumbing works
Clearing grass Demolishing Earth work iPCC 1 4 8 Centering and shuttering PCC 1 3 6 PCC 124 plastering offset filling and back
Earthwork excavation, Demolishing and dismantling, PCC, RRM, plastering. RCC, white washing , painting ,Tiling, Aluminium fabrication work, steel work, false ceiling, sheet work, interlocking
clearing grass,Demolishing,Earth work Excavation,PCC 1 4 8,centring shuttering,Pcc 1 3 6,Pcc1 2 4,RCC,Plastering,Earth filling
The scope of the work includes demolishing the existing cement concrete floor, water proofing, supplying and stacking stone aggregate, laying ceramic floor tiles
Dismantling tiled roof,wood works ,demolishing brick work openings ,Brick work ,plastering,Supplying and fixings doors and windows ,Roofing ,Plastering ,Flowringand finishing works
Annual Plan-Atholi GP 2023-2024 Demolishing water tank in panchayath office and installation of new tank-Pro.No.342/24- General Civil Work
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 Centering and shuttering weep hole Plastering filling earth etc
earth work excavation RR masonry Demolishing brick Solid block masonry Preparation of sub base Granular subbase Plastering Centering Shuttering Steel reinforcement Cement Concrete
Demolishing cc,clearing grass,earth work excavation,PCC 1 4 8, 1 3 6,1 2 4,centring and shuttering,steel reinforcement,plastering,earthfilling
The items of the estimate are clearing jungle, Earthwork, demolishing concrete, , CC 136 20mm,CC 124 20mm , centring and shuttering, Plastering, steel etc
Demolishing RCC Brick Tiled roof Steel work tubular purlin Galvanised iron profile sheet Cement concrete Vitrified Ceramic tiles Painting emulsion Synthetic enamel paint
Earthwork excavation in soil rock filling quarry muck PCC RCC Shuttering TMT bars Fixing bolt plastering Demolishing CC Masonry RR masonry Stub setting
Demolishing cement concrete, Engaging crane for removing damaged concrete side wall, Earth work,Cement concrete, centering shuttering, cement concrete, plastering, Filling contractors own earth
Clarifier tank floor concreting by RMC, core cutting, red earth filling and compacting, brickwork, chemical plastering, anchor grouting, epoxy grouting, concrete and brick demolishing
Demolishing and Dismantling UPVC Door and window wall tile florr tile Glass plains Water closet RCC 1 1 5 3 plstering centering painting etc
demolishing brick work , earth work excavation.laterate masonry for foundation and basement,laterate masonry for compound wall ,12mm cement pastering ,cement primer and emulsion painting .
The provisions include in this are Earth work in surface excavation Demolishing brick and stone work Providing and laying in position cement concrete etc
clearing grass,Demolishing cc 136and 1 4 8,earth work excavation,PCC 1 4 8, 1 3 6, 1 2 4 ,centering,plastering.Earth filling
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 steel reinforcement Centering and shuttering Plastering filling earth etc
Demolishing Brick work EWE CC 1 4 8 CC 1 1 5 3 centering and shuttering steel reinforcement Brick work RR DR painting etc
This estimate includes demolishing of wooden roof truss for two godowns and laying with steel truss relaying of roof tiles of two godowns etc
dismantling stacking fencing posts demolishing laterite masonry dismantling barbed wire, earthwork excavation laterite masonry CC 1 2 4, supplying angle iron post fencing with
demolishing rcc earth work excavation random rubble masonry centering shuttering pcc rcc reinforcement excavation and filling dry stone pitching upvc pipe for weep hole
Demolishing brick laterate Earthwork excavation RR masonry Centering shuttering Steel reinforcement RCC work Laterate masonry Filling contractors earth Filling quarry muck Plastering painting Interlocking
in this estimate for demolishing existing dummy columns and recasting new RCC columns to required height GI sheet roofing provided over steel truss work
This estimate is prepared for renovating the dining room of District collector Kottayam Dismantling tile work false ceiling with e board d laying vitrified floor tiles painting etc
Renovation work of ERS BUILDING Comprises demolition of existing wall,floor tiling,woodeden partition,file rack,table and wardrobe etc.
Demolition of brick work,RCC of lintel,casting and installation and pinting of GI grill,plastering and painting of wall.
Demolition of Old Primary Block of PM SHRI Kendriya Vidyalaya No. 1, Naval Base, Kataribagh, Ernakulam, Kerala. SH - Construction of Temporary Pump Room above existing UGT and laying of new plumbing line from OHT to Administration Block, Dismantling of existing electrical fittings, panels, distribution boards, cables and pumps, and re-installation of pumps including cabling, earthing and allied electrical works.
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Plastering filling available earth etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement Earth filling Plastering etc
The provision included in the estimate are cleaning jungle earthwork in surface excavation demolishing brickwork Excavation work providing and laying PCC dry rubble masonry etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement filling earth Plastering etc
This estimate includes demolishing of solid block wooden window doors wooden roof truss manglore tiles sheet roof and relaying of manglore tiles over steel truss
Demolishing brick work Earth work excavation DR masonry RR masonry GI barbed wire fencing PCC 1 2 4 Filling earth Plastering Providing PVC weep holes
REPAIR TO PLASTER, DEMOLISHING AND LAYING RCC, BRICK WORK, WOOD WORKFOR DOOR AND SHUTTERS, FIXING ROOF TILE, FIXING WATER CLOSET , 9 MM CEMNT PLASTERING ETC
Dismantling doors windows etc plastering laying ceramic glazed floor tiles fixing uPVC door frame dismantling roofing Solid block masonry providing sanitary items Demolishing cement concrete
Clearing jungle,Demolishing CC 1 4 8,earth work excavation,pcc 1 4 8,centring shuttering,pcc1 3 6,pcc1 2 4,steel reinforcement,plastering
Demolition of existing drainage,new drainage,scarifying the existing bituminous road surface, GSB Construction , providing and laying intelocking pavers, pcc work
Annual Plan-Kalliassery Block Panchayath 2025-26 Proj.No. 112/26-Demolition of uninhabitable portion of Irinavu Kozhifarm building in Kalliassery GP
demolition of existing drain , footpath and reconstruction of the same. Widening area to be resurfaced with 100mm thk CC interlocking tiles
In compound wall proposed for Kurichi Govt.ITI Building.RR masonary is proposed for foundation and retaining portion and above this RCC belt is also proposed.Wall is proposed using precast solid blocks.Finishing works plastering and painting is als
REFER TENDER DOCUMENTS
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement filling available earth Plastering etc
Demolishing cement concrete PCC 1 2 4 Centering shuttering Steel work for purlin Structural steel work for trusses Providing GI sheet Providing GI sheet roofing accessories