Loading…
Loading…
1,062 results • Best match
The items included in this estimate are Clearing grass, Bailing out water, demolishing cement condemolishing stone rubble masonry, Earth work excavation for desilting, lining CC 1 3 6 for Bed and side lining, sluic chamber, parapet wall near
estimate is prepared as per the direction from Thahasildhar North Paravoor This estimate is prepared for constructing compound wall gate and truss work for a car Shed Provision included in this estimate are demolishing existing solid block work
The works includes the construction of a lift to the administrative block with solid block and RCC plastering painting and water proofing and hooks For the exam hall partition demolishing and dismantling works are arranged in old works
Dismantling doors, windows and clerestory windows, Repairs to plaster of thickness 12 mm to 20 mm in patches of area, Removing white or colour wash by scrapping and sand papering, Demolishing brick work manually/by mechanical means etc.
This is composit work The work included Pianting Patch plastering dismantling and demolishing items solid block masonry CC 1 2 4 water proofing vitrified floor tile ceramic floor and wall tile water supply and sanitary fittings aluminium work
Demolition of existing security cabin and portion of compound wall, construction of new security office including earthwork excavation, soling, PCC, RCC and steel work, random rubble masonry, plastering, priming, floor tiling works etc
The scope of the work includesmanual demolition of brick work, tile work, cement concrete and old plaster, cement plastering, water proofing treatment, solid block masonry, supply and laying of ceramic glazed floor tiles
The estimate is prepared Items included in the estimate for casting and laying boundary pillars man mazdoor for clearing and other works JCB for demolishing the encroachments Tippers for transporting debris to the yard and gas cutter for cutting
Dismantling CC leveling and Compacting Excavation for road way Cutting of trees Clearing Grass Granular Sub base Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Plastering etc
clearing grass Demolishing existing damaged canal bed and sides Earth work excavation and clearing the accumulated silt and sediments from the bed of open canal. CC 13 6, using 20mm, broken stone This item is proposed for the rectification
Demolishing the existing slabs to extend the fire escape stair to third floor, and providing steel staircase from the second floor to third floor including fire escape door (at basement and terrace), and GI Trafford sheet roofing with parapet.
Clearing grass,Demolishing C.C.1 3 6 mix,earth work in excavation, R .C.C.1 2 4,using 20 mm aggregate,Centering shutteriung,Steel reinforcement for RCC work, Providing and laying 1 3 6 20 mm nominal size,etc.
C.C.1 2 4,using 20 mm aggregate,Centering shutteriung,Demolishing C.C.1 3 6 mix,Providing and laying 1 3 6 20 mm nominal size,12 mm plastering 1 4,C.C. 1 3 6 40 mm nominal size
Rectification works
Indoor Court finishing, Demolition - Security Cabin, New change room, RCC Kerb, Entrance Gate, Compound wall, Chainlink Fencing, single arm, Wiring, MCCB, MCB, DBS, Earthing, LT Cable, Laying, Termination, Light Fixtures,Poles, Lift Electric, Lift
This work includes Urgent Special Repair works to the SD Centre building like Demolition works, Concrete works, Tile flooring works, repair works to joinery, patch plastering works, painting works, plumbing works, clearing works etc.
Brick work demolition Earth work excavation P.c.c 1 4 8 for r.c.c footing ,Solid masonry , Steel reinforcement centering shuttering (slab , Lintel ,beam , Roof slab plinth beam r.c.c footing plastering ,Painting ,Wall Cladding, Lettering inag
Vydyuthi Bhavanam Building at Chathannoor - Demolition of compound wall, front portion of the building and construction of new compound wall, RCC staircase structure and modification of building in connection with the NH66 widening work.
Demolition of brickwork and interlock,Chipping ,Earthwork excavation and filling, Soling,bailing and shoring, Centering and shuttering, PCC and RCC, Solid block masonry, Plastering, GI truss and sheet, Aluminium works, Tiling and plumbing, Painting
Area clearing,Dismantling of roofing sheets,old plaster, wooden doors and window, Brick demolition,Excavation and redearth filling,RCC and PCC,Solid block masonry,formwork ,Plastering,Steel reinforcement,GI structural work,PVC sheet, wallPainting
Presently, the dining room is very small and entrance to toilet is through dining room rather than Bed room.The proposal is to increase the dining room space by demolishing wall between dressing room and current dining room and closing the door
CC 1 2 4 lining is proposed with reinforcement. The provisions given in the estimate are Filling with contractors own earth, Earth work excavation ,DR pitching of thickness 22.5cm , Demolishing cement concrete, CC 1 2 4 for lining, Reinforcement, etc
This work is for constructing 10 rooms with Aluminium roofing sheet in the existing building on the 2nd floor after dismantling the existing GI roofing sheet The items included in the estimate are dismantling roofing sheet and demolishing dummy col
Provisions included in this estimate are demolishing brick work RCC 1 1 2 3 for foundation and columns steel renforcement for RCC work centering and shuttering for RCC work solid block work for compound wall 12mm thick plastering work priming c
Dismantling roofing Demolishing R C C Works Brick Work stone rubble masonry Taking out doors windows and clerestory window shutters steel or wood Clearing grass and removal of the rubbish up to a distance of 50 m Earth work in excavation
The items included in this estimate are demolishing the existing rubble masonry wall on , PCC for foundation, rcc 1.3.6. for retaining wal on road side and DR masory wall for kitchen side etcl, centering, shuttering, steel, solid block work etc
This estimate is prepared to some maintenance to the Old block of Devivilasam GOVT LP School Parampuzha.The items included in this estimate are Demolishing tiled roofing GI tube steel work for rafters and purlins GI sheet roofing synthetic enamel pai
The items included in the estimate are demolishing slab dismantling DR Earth work excavation for foundation and silt removal CC 1 3 6 20 mm stone for wall and bed CC 1 2 4 for haunch 9 mm Plastering etc
1.Laying PVC and HDPE pipes 2.Leak rectification of PVC and HDPE pipes 3.Excavating trenches for laying pipes 4.Providing stand pipes, connection pipes 5.Demolishing road, grass cutting 5.Providing PCC 6.Skilled Labour supply 7.Fixing valves
clearing jungle demolishing cement concrete earthwork excavation CC 1 4 8 for base of footing RCC 1 2 4 for footing and abutment RCC 1 1 5 3 for deck slab bed block and parapet Provisions for centering shuttering and painting
Earth work excavation PCC 1 3 6 Solid block masonry Plastering Dismantling steel work and asbestos sheet Demolishing RCC Filling quarry muck CC 1 2 4 Structural steel work for trusses and purlin Poly carbonate sheet PVC gutter Paver blocks etc
The work includes demolition of roof slab of machine room which was deteriorated with exposed reinforcements, fixing granite on lift opening walls, patch plastering and applying primer inside lift well and other related civil works.
Demolition of existing indoor and outdoor power cable trenches, construction of new power cable trench, extension of existing trench in control room, alteration of control room wall and yard metalling of the 11 kV yard.
Demolition of damaged concrete jally bricks works of compound wall in the main and outer yard and retrofitting the compound wall with new solid blocks, plastering and painting the compound wall throughout the substation premises.
Ground Development works - Demolition works, Retaining wall, Compound wall, Protection wall around pond, Drain, Bore well, Indoor Stadium, Security Cabin, OH Tank, Sump tank and Pump room, Solar System, Flood lighting work and Electrification works
estimate provisions included for the demolition of encroachments, removal of unauthorized arches, hoardings ,placards and banners with poles or frames at fixed which abuts the highways and pedestrians as per the direction of honourable Highcourt
Deposit Work-Water Supply Scheme to Vanchikkadavu-Water supply Scheme to Vanchikadav - Supplying and fixing of Iron removal plant, Pressure Filter and Chlorine dosing system at vanchikadavu in Manalur Panchayath -PART VIDemolishing
The work includes demolishing existing compund wall earth work excavation PCC 1 4 8 RCC 1 1 5 3 centering and shuttering and steel reinforcement for foundation,solid block masonry wall grill work for compound wall plasering and painting CC1 1 5
The work is for the construction of compound wall It include Demolishing PCC, DR, RR, Brick masonry etc. and construction of PCC, DR, RR, Columns. painting etc. The construction of rest house building is in final stage. .The work is very urgent nat
demolishing damaged portion,clearing the site,excavation for foundation,RR foundation a n d b a s e m e n t w o r k , s u p e r s t r u c t u r e works,plastering painting.
This estimate includes 1.Demolishing concrete side wall 2.Providing CC 148 for bed of sidewall 3.Centring and shuttering for side wall. 4.CC 124for side wall 5.CC 136 for lining and9 9mm thick plastering.This estimate is prepared as per curren
The estimate includes Demolishing RR, CC wall, Earthwork ,CC1 4 8, Centring shuttering, CC 1 2 4, RCC 1 2 4, Structural steel work for hand rails and plastering. The estimate has been prepared based on DSOR 2018 with cost index of
reconstruction of drain at Avenue-I approx. length of 230 m and revamping of SR oil pit drain. The scope of work will be demolishing and removal of the existing storm water drains, constructing RCC drain and providing new / existing drain cover etc.
AS PER BOQ AND TENDER DOCUMENT
1.Demolition of PCC 2.Earth work excavation 3.Dewatering 4.Filling the area with GSB 5.Centering and shuttering works 6.Steel reinforcement work 7.PCC and RCC work 8.Plastering and black bituminous painting work
CC 1 2 4 protection wall at both sides to arrest the leakage in continuation with existing concrete wall. The items included in this estimate are demolishing DR wall, earthwork excavation, CC 1 2 4 20mm graded concrete for wall , bed and lining, stee
demolishing cement concrete, Earth work excavation for foundation and silt removal , Levelling course for foundation in PCC 1 4 8, Side wall in RCC 1 2 4 20 mm stone, RCC slab in 1 1.5 3 20mm, CC 12 4 20mm, centering and shuttering
Item comprising 1)Earth work in excavation and filling. 2)Demolition of brick work,PCC,RCC,AC roof sheet,Structural steel etc. 3)PPC 4) RCC 5)Roofing and cladding 6)Aluminium fabrication. 7)Masonry works and connected finishing works.
The proposed work includes the demolition of the existing dilapidated pump house and construction of a new structure with an RCC roof slab along with the provision of a solid block parapet wall around the existing well and other allied works
The estimate includes construction of protection wall in CC 1 2 4 on the right bund with skin reinforcement for a length of 37m to arrest further leakage.10cm thick CC 1 2 4. demolishing DR , Earthwork excavation ,centering ang shuttering,CC 1 2 4 20