Loading…
Loading…
7,167 results • Best match
New Construction R R Foundation Superstructure with solid block work Network cabling Furniture work and demolition of existing building
New Construction R R Foundation Superstructure with solid block work Network cabling Furniture work and Demolition of Existing building
New Construction R R foundation Superstructure with Exposed brick work Network cabling Furniture work and demolition of existing building
New construction R R Foundation Superstructure with solid block work Network cabling and Furniture work Demolition of Existing Building
DEMOLITION OF DILAPIDATED AND INOPERATIVE ELEVATED SERVICE RESERVOIR AT SENHATI CO-OPERATIVE COLONY IN WARD NO.116, BR. XIII.
Demolition and Reconstruction of E and M Manglapuri store in Dwarka Constituency under AEE(M)-33 (Re-invite)-1
Demolition of defunct/abandoned Over Head Water Tank in Sultanpur Village in AC -46 (Chhattarpur) under AEE(M)-46.
New Construction R R foundation Superstructure with Exposed brick work Network cabling Furniture work and demolition of existing building
Providing equipment and manpower on hire charge basis for the demolition programme/ removal of encroachment from Yamuna Flood Plain
Demolition of RCC tower legs, Security cabin, DG bed and BTS platforms in USO compound at JALAGERI, (Bagalkot dist).
Hiring of JCB Breaker and JCB Poclain Machine for illegal demolition drive in Jurisdiction under the Municipal Corporation Manesar.
Demolition of defunct water Over Head Tank at Karala Filling Point in Mundka AC-08 under AEE(M)-08.
demolition brick works CC works, earth work excavation, CC, centering shuttering, solid block work, plastering, painting floor tiling etc
Providing equipment and manpower for the demolition programme/removal of encroachment from the DDA land in Yamuna Flood Plains.
New Construction R R foundation Superstructure with Exposed brick work Network cabling Furniture work and demolition of existing building
SH- Demolition of Existing C.C. Pavement and 900MM Dia Hume Pipe Culvert at KM. 3/950) (Under O.F.C. Head)
Supply of machinaries,vehicles and man power on hire basis for demolition of unauthorised Construction under Bidhannagar Municipal Corporation.
Demolition of existing Annexure building of Chennai primary school at OSH Road in Div-52, Unit-12,Zone-5
HAMMER, SDS-MAX DEMOLITION ROTARY POWER: 1450W IMPACT RATE: 900-1890/MIN IMPACT FORCE 6 TO 23J SUPPL (Q3)
(SH Jacketing of main storage tank 28500 litr capacity at village Selag and demolition and casting of the foundations)
Engaging Hiring Manpower and Equipment required for demolition action program by Building Department I and II Keashav Puram Zone
Demolishing CC EWE CC 1 4 8 Centering and shuttering CC 1 3 6 Steel reinforcement 9mm plastering Filling with contractors own earth
This includes demolishing existing bathroom tiles providing new tiles roofing all sanitary connections painting a room providing wardrobe opening closed doors and windows
Earthwork Demolishing rcc supplying filling quarry muck PCC 1 3 6 RCC 1 1.5 3 picking collecting metal, filling plastering fixing foun.bolt etc
Dismantling and Demolishing G S corrugated sheet work Maintanance works in doors and windows PCC Providing and Laying Plastering Vertified tilework Electrification Plumbing
varous sanitary installations,dismantling and tiles,providing grill steel windows,demolishing duct wall on backside parking area ,providing leakage on expansion joint portion
Demolishing of abandoned Over Head Tank at ZRO office, Old Rajinder Nagar UGR in Rajinder Nagar Constituency AC-39 under EE(D)-057.
Demolishing pipe culvert and reconstruction of culverts with RCC Slab on flood drain along village Ghoga to Harewali Jhal Road in Distt., North
Upgradation works includes Demolishing works Painting providing polycarbonate sheet step wood works Tiling supplying sanitary items Brick work Electrical works and Purchase items
demolishing/removal of existing machine pressed clay tiles, disposal of debris material, water tightening to the roof top, Disposal of removed roofing materials
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 Centering and shuttering Plastering filling contractors own earth etc
Deposit work PWD (Bridges) Temporary shifting of pipe lines in connection with the demolishing of Raman chira bridge at Edayar in Koothattukulam Municipality.
Dismantling tiled Roofng with battens ,Demolishing brickwork,Brick masonry,12mm plastering,structural steel work,coolies,wall painting ,fixing on roof pressed clay tile
Upgradation works includes Demolishing Brick work Providing Wooden Doors Solid Block masonry Plastering Painting supplying sanitary items Aluminum Partition Landscapping Electrical plumbing works
Clearing grass Demolishing Earth work iPCC 1 4 8 Centering and shuttering PCC 1 3 6 PCC 124 plastering offset filling and back
Earthwork excavation, Demolishing and dismantling, PCC, RRM, plastering. RCC, white washing , painting ,Tiling, Aluminium fabrication work, steel work, false ceiling, sheet work, interlocking
Construction of new office complex by demolishing old damaged office of establishment section of EE(EandM) WC-II at Chandrawal Water Works No.I.
Demolishing of RB work, Dismantling cement conglomerate/terrazzo floors, Providing and fixing of wall tiles and granite, Providing Kicthen Cabinet, Providing Kicthen Sink
Providing and laying cement based water proofing treatment of roof after demolishing old and damaged mud phaska of various roof of Jhandewalan BPS.
clearing grass,Demolishing,Earth work Excavation,PCC 1 4 8,centring shuttering,Pcc 1 3 6,Pcc1 2 4,RCC,Plastering,Earth filling
Demolishing and Reconstruction of existing Store Room under Civil Division-VII, I and FC at Rohini Office Complex, Sector-15, Rohini Delhi-110089
The scope of the work includes demolishing the existing cement concrete floor, water proofing, supplying and stacking stone aggregate, laying ceramic floor tiles
Dismantling tiled roof,wood works ,demolishing brick work openings ,Brick work ,plastering,Supplying and fixings doors and windows ,Roofing ,Plastering ,Flowringand finishing works
Annual Plan-Atholi GP 2023-2024 Demolishing water tank in panchayath office and installation of new tank-Pro.No.342/24- General Civil Work
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 Centering and shuttering weep hole Plastering filling earth etc
earth work excavation RR masonry Demolishing brick Solid block masonry Preparation of sub base Granular subbase Plastering Centering Shuttering Steel reinforcement Cement Concrete
Demolishing of Existing Two Storey Chaupal and Re Construction of the Two Storey Gurjar Chaupal at Village Tihar in Hari Nagar AC 28
Demolishing cc,clearing grass,earth work excavation,PCC 1 4 8, 1 3 6,1 2 4,centring and shuttering,steel reinforcement,plastering,earthfilling
The items of the estimate are clearing jungle, Earthwork, demolishing concrete, , CC 136 20mm,CC 124 20mm , centring and shuttering, Plastering, steel etc
Improvement of SC ST Bastie Demolishing and reconstruction of roads in Harijan Camp area Kriti Nagar in Moti Nagar Assembly Constituency AC 25