Loading…
Loading…
2,836 results • Best match
GENERAL-Desilting of drain in ward -22-Desilting of various drain in ward -22-General Civil Work
GENERAL-Desilting of drain at ward-11-Desilting of various drain at ward-11-General Civil Work
GENERAL-Desilting of drain at ward-26-Desilting o variousf drain at ward-26-General Civil Work
GENERAL-Desilting of drain at ward 06-Desilting of various drain at ward 06-General Civil Work
Desilting of small drains in Div 72 (New Division 20)-Desilting of small drains-General Civil Work
EYE2-6627405-25-Desilting of various drains in Division 29-Desilting of various drains-General Civil Work
GENERAL-Desilting work division 42 (old 54)-Desilting near Bread world and Krishna Hospital -General Civil Work
Annual Maintenance of Canals-Jungle clearence,silt removal and Removal of floating bodies and accumulated waste from Oyoor branch canal, Oyoor, Adichanalloor, Kattayil, Veliyam, Padinjattinkara, Meeyannoor and Kottara distributaries
Desilting
Cleaning and desilting
Desilting
DESILTING BOUNDARY THODU IN DIVN 51
Desilting small drains in divn 47
Azhikode Grama Panchayath Musliyar thodu desilting
Desilting Checkdam at Chakliyampara in Nelliyampathy
Proj No 72 Desilting Of Waterbodies
GENERAL-ward-16 desilting of drain
Emergency neasures for desilting of Kannukalichal thodu from Kayal mouth to Sivodayam palam in Kalliyoor panchayathu.
Desilting at Padumbi check dam in Kanthalloor Range during 2019-20
GENERAL KPIP AM 2025 26 Jungle clearance, silt removal and canal cleaning works to LBMC between ch 52/000km to 61/150km for the year 2025 26 General Civil Work
GENERAL-KyIP ACP NP 2025 26 Jungle clearance and silt removal of Left Bank Main Canal and its Field bothies between ch 9 000 and 14 400 km General Civil Work
GENERAL KPIP AM 2025 26 Clearing grass jungle and silt removal for Karimba I,Karimba II thachampara,Pombra Karakurussi (balance work) distributaries and water distribution through all distributaries General Civil Work
GENERAL-CSM 2022-23-CSM-2022-23 Annual maintenance of LBMC B/W ch. 34/600km to 40/900km including clearing and silt removal of Kondayoor branch canal.-General Civil Work
GENERAL KyIP ACP NP 2025 26 Jungle clearance and silt removal of Right Bank Main Canal and its Field bothies between ch 0 000 and 2 500 km General Civil Work
GENERAL KPIP AM 2026 27 Jungle clearance Silt removal and canal cleaning works for Kulappully canal Kailiyad north canal and Kailiyad south canal for the year 2026 27 General Civil Work
GENERAL KyIP ACP NP 2025 26 Jungle clearance and silt removal of Right Bank Main Canal and its Field bothies between ch 2 500 and 5 000 km General Civil Work
ENERAL KyIP ACP NP 2025 26 Jungle clearance and silt removal of Left Bank Main Canal and its Field bothies between ch 3 080 and 9 000 km General Civil Work
GENERAL-KYIP-ACP(NP) 2024-25-Urgent works for Jungle Clearance and silt removal of distributary directly from LBMC from ch 14/400 km to 26/000 km -General Civil Work
GENERAL KPIP AM 2025 26 Jungle clearance Silt removal and canal cleaning works for kulappully canal Kailiyad north canal and kailiyad south canal for the year 2025 26 General Civil Work
GENERALAction plan 202425 KIP OampM Annual Maintenance work under the section 13 4 charummooduClearing jungle and silt removal of Vancheshwaram and Edakunnam Distributories and its minors General Civil WorkGeneral Civil Work
GENERAL-CSM 2022-23-CSM- 2022-23Annual maintenance B/W ch. 29/300 km to 34/600 km including silt removal of cut and cover D/S portion.-General Civil Work
GENERAL-KPIP-AM-2024-25-Jungle clearance, silt removal and canal cleaning works to LBMC between ch 52/000km to 61/150 km for the year 2024-25-General Civil Work
GENERAL-KPIP- AM-KPIP-AM-Jungle clearance ,Silt removal and canal cleaning works of LBMC between ch 42/000km to 52/000 km for the year 2024-25-General Civil Work
GENERAL-CSM- 2023-24-Annual maintenance of LBMC B/W ch 22/950km to 25/000km including clearing and silt removal of Killimangalam, Pynkulam and Panjal branch canal -General Civil Work
GENERAL-CSM - 2026-27-Annualmaintenance of LBMC between ch 25/000 km to 29/300 km including clearing and silt removal of cut and cover u/s portion-General Civil Work
GENERAL-CSM - 2026-27-Annual maintenance of LBMC between ch 22/950 kmto 25/000 km including clearing and silt removal of Killimangalam, Pynkulam and Panjal branch canals-General Civil Work
KRE2/4000/22 Desilting T.P canal desilting and removing pola payal Thevara perandoor canal (AMC 1Year) Div 55,56,63
GENERAL-Desilting of various drain at ward-8-Desilting of various drain at ward-8-General Civil Work
EYE2/6628692/25 DESILTING MEENCHIRA THODU IN Division 29-DESILTING MEENCHIRA THODU IN DIV 29-General Civil Work
Desilting of various drain Thrikkakara municipality (Zone two)-S0246/26 Desilting of various (zone two) at Thrikkakara municipality
EyE1-12407/22 -Desilting of drain - -Desilting of drain from Federal Park to Petrol pump in Div 42
EYE2/6628696/25 Desilting of Thiyyadi Thodu in Div29-Desilting of Thiyyadi Thodu in Div29-General Civil Work
jungle clearance silt removal
jungle clearance silt removal
silt removal jungle clearance
jungle clearance silt removal
jungle clearance silt removal
Desilting
Dredging the specified areas at RD mouth and Quay-3 as instructed by the engineer-in-charge to lines/levels/slopes using cutter suction dredger / dredgers (CSD) and disposing off and dumping materials through floating pipe lines about 100m.
Deepening by dredging the at ISRF Willington Island and CSL as per dredging plan using grab dredger and barges for disposal to outer sea including cost/ hire charges of grab dredger / barges / other ancillaries / boats, fuel, consumables, labour etc