Loading…
Loading…
797 results • Best match
De-silting to increasing water capacity and construction of a ladies change room at Kandpara pond of Suagpur village and Dumermunda pond of Mahulpara village under Titilagarh Block near O.F.Badmal under CSR scheme 2025-26.
Providing CC Channeling from RD.14.090Km to RD.14.127Km, Repair of CD structure at RD.15.005Km, De-silting, jungle clearance, Re-sectioning and strengthening to bank in between RD.1.515Km to RD.2.055Km of Udayagiri Distributary.
Construction of right side Guardwall in between RD. 17090m to 17130m, RD.17978m to 18030m and de-silting of canal bed from RD14040 to 16460 m of Gohira Right Main Canal for the year 2025-26.
Providing CC channeling from RD 0.00 km to RD 0.234 km of Cheriguda S/M, de-silting and raising of bank from RD 0.00 km to tail of Cheriguda S/M and Mariwada S/M-III
Providing CC channeling in between RD 0.660 km to RD 0.860 km, strengthening to bank in between RD 1.200 km to RD 1.650 km, de-silting and jungle clearance of Punaruguda S/M and Gorakhunta Minor
Facility Management Services - LumpSum Based - Industrial; De-Silting of pond at Mineral Separation Plant and Transportation of excavated sand as per scope of work 100000 MT; Consumables to be provided by service provider (inclusive in contract cost)
De-silting and Re-sectioning of canal Kamraguda S/M-I,II, Maharajpalli S/M-II, Billiguda S/M-I,II,III and IV and construction of 8 Nos of Veretical Fall in Kamarguda S/M-I.
Providing CC channeling from RD 0.250 km to RD 0.350 km and RD 0.650 km to RD 0.850 km, de-silting and jungle clearance from RD 0.00 km to RD 1.300 km of Chitrangpalli Sub-Minor-I
Slope protection work at L and R bank, bed lining at u/s and d/s of CD at RD 36.016 km, de-silting and re-sectioning in between RD 35.800 km to RD 36.500 km of GMC
Cement Concrete Channeling from RD.3.140Km to RD.3.225Km, RD.3.000Km to RD.3.345Km, RD.3.450Km to RD.3.510Km, RD.3.600Km to RD.3.660Km, De-silting and Jungle clearance from RD.0.00Km to RD.5.820Km of Kunchanpalli Minor
Providing CC channeling from RD 0.350 km to RD 0.580 km, strengthening to bank in between RD 0.750 km to RD 1.500 km of MV-54 Sub-Minor-I, de-silting and jungle clearance of MV-54 Minor
Slope protection work at L and R bank, bed lining at u/s and d/s of CD at RD 32.608 km, de-silting and re-sectioning in between RD 33.200 km to RD 34.000 km of GMC
Repair and renovation of fall at RD 2.205 km, providing CC channeling from RD 1.650 km to RD 1.890 km, de-silting and jungle clearance from RD 1.400 km to RD 2.895 km of Chitrangaplli Sub-Minor-I
Providing CC channeling from RD 0.00 km to RD 0.047 km, in between RD 0.300 km to RD 0.400 km and RD 0.930 km to RD 1.000 km, de-silting and jungle clearance of Tamasa S/M-I
Renovation and Construction of fall at RD 1.890 km, CC channeling within RD 1.520 km and RD 2.070 km and de-silting and re-sectioning from RD 0.100 km to RD 1.320 km of Kenduguda S/M-I
Extension of HR of Kalimela Minor and Kalimela S/M-V, De-silting of canal bed from RD 10.666 km to RD 12.802 km and construction of bed lining from RD 10.518 km to RD 10.753 of Koimetla Distributary
De-silting from RD 0.400 km to RD 2.500 km, construction of protection wall from RD 0.000 km to RD 0.300 km and Repair of Canal Syphon at RD 1.470 km of Kalimela Sub-Minor-V of Koimetla Distributary
De-silting to increasing water capacity and construction of a bathing Ghat and a ladies change room at Sandimunda pond of Sikapatrapali village (New Basti) and Rugudimunda pond of Kuikeda village (except ladies change room) under Saintala Block near
De-silting and Strengthening of Canal from RD.3.510Km to RD.6.800Km, repair of PCS at RD.2.378Km, Construction of addl. VRB at RD.5.400Km and cement concrete channeling in between RD.5.284Km to RD.5.450Km of Jakalgundi Distributary.
Construction of VRB at RD.2.365Km and cement concrete channeling from RD.1.980Km to RD.2.365Km of Kutmanpalli S/M-II, De-silting and Strengthening of Canal embankments at vulnerable reaches from RD.40.309Km to RD.40.930Km of G.M.C.
Providing CC channeling in between RD 0.500 km to RD 0.900 km, strengthening to bank in between RD 1.080 km to RD 1.350 km and de-silting from RD 0.900 km to RD 1.630 km of Chidupalli S/M-V
Repair and renovation of fall at RD 0.060 km, providing CC channeling in between RD 0.840 km to RD 1.140 km, de-silting and re-sectioning in between RD 0.00 km to RD 0.800 km of Gompakonda S/M-1
De-silting from RD 0.000 km to RD 0.930 km of Patakonda S/M, construction of protection wall from RD 1.200 km to RD 1.407 km and repair of canal syphon at RD 1.150 km of T.Salimarikonda Minor of Koimetla Distributary
Repair of C.D at RD.72.500Km of G.M.C and De-silting and Strengthening of Canal, repair of fall at RD.0.750Km and Cement concrete channeling at vulnerable reaches in between RD.0.00Km to RD.0.990Km of Potteru S/M - II
Repair to HR and Addl. C.D at RD.0.740Km, Cement concrete channeling to the U/S and D/S of C.D and H/R point and De-silting, Re-sectioning from RD.0.00Km to RD.1.035Km of Undrukonda Distributary Canal.
Construction of new VRB at RD.9.830Km and Cement Concrete channeling to the U/S and D/S of the C.D at RD.9.770Km and De-silting and Re-sectioning from RD.9.420Km to RD.11.040Km of Wollempalli Distributary Canal.
De-silting and Strengthening of Canal embankments Construction of addl. VRB at RD 4.300Km., repair of C.D at RD.5.000Km and RD.5.200Km and cement concrete channeling at vulnerable reaches in between RD.9.500Km. to RD.9.600Km of Tamanpalli Minor
Providing CC channeling from RD 0.490 km to RD 0.630 km and RD 1.360 km to RD 1.380 km, strengthening to bank in between RD 1.390 km to RD 1.800 km, de-silting and jungle clearance of Tamasa S/M-II
Repair of Fall at RD.4.650Km, RD.4.720Km, RD.4.950Km, RD.5.130Km, RD.5.250Km and RD.5.350Km, De-silting and Strengthening of Canal and cement concrete channeling at vulnerable reaches of Kondapalli Minor in between RD.4.200Km to RD.10.800Km.
De-silting and Sectioning of Canal embankments in between RD.0.00Km to RD.0.510Km, repair of fall at RD.0.220Km, RD.0.350Km, RD.0.440Km, RD.0.510Km and RD.0.660Km of Maharajpalli Minor and cement concrete channeling at vlunerable reaches in between R
Sanitation work like door to door waste collection of segregated wastes, sweeping of roads, cleaning de-silting of drains, bush cutting/uprooting, etc with deploying of Sanitation Worker for all the 21 wards containing from Zone No. 01 to Zone No.05
De-silting and Strengthening of Canal embankments, structure repair and cement concrete channelling at vulnerable reaches in between RD.0.00Km to RD.0.810Km of Tindraspalli S/M-I, RD.0.00Km to RD.1.005Km of Tindraspalli S/M-II, RD.0.030Km to RD.1.200
Repair of PCS structures at RD.0.060Km and RD.0.420Km of Jakalgundi Dinstributary and RD.1.260Km and RD.3.331Km of Nalagunthi Minor, De-silting and Strengthening of Canal from RD.0.00Km to RD.3.500Km, Construction of addl. VRB at RD.0.410Km of Jakalg
Repair of fall at RD 1.110 km, providing CC channeling from RD 1.050 km to RD 1.250 km and RD 1.435 km to RD 1.500 km, de-silting and jungle clearance from RD 1.050 km to RD 1.665 km of Potteru Minor
Repair of C.D at RD.2.580Km, Fall at RD.1.440Km and Cement concrete channeling at U/S of Falls and vulnerable reaches in between RD.2.310Km to RD.3.210Km and De-silting, Re-sectioning from RD.2.310Km to RD.3.600Km of Undrukonda Distributary
Construction of addl. VRB at RD.0.590Km of Sarabanpalli S/M-II, De-silting and Strengthening of Canal embankments and cement concrete channeling at vulnerable reaches in between RD.1.750Km to RD.2.220Km of Sarabanpalli Minor and RD.0.360Km to RD.0.
Providing CC channeling from RD 0.00 km to RD 0.078 km and in between RD 0.400 km to RD 0.600 km, strengthening to bank in between RD 0.100 km to RD 0.370 km, de-silting and jungle clearance of Boilapari S/M
De-silting to increase water capacity, construction of a bathing ghat, ladies change room and stone pitching on both side of ghat at Badmunda Pond, Barahmal pond, Nuaband pond and Nuapada pond under Bhadra Gram Panchayat through CSR scheme of 2025-26
Renovation and construction of fall at RD 0.180 km and RD 0.450 km, CC Channeling within RD 0.100 km and RD 0.700 km and de-silting and re-sectioning from RD 0.240 km to RD 0.810 km of Gompakonda S/M-3
De-silting and Cleaning Main Drain-1 and Link Drains in Cuttack Municipal Corporation Area
Civil works
De-silting and Strengthening of Canal from RD.1.950km to RD.2.540Km of Pendulbai Minor and from RD.4.700Km to RD.5.130Km of Ginnipalli Minor and cement concrete channeling from RD.1.950Km to RD.2.100Km and from RD.4.710Km to RD.4.810Km of Pendulbai M
De-silting of canal bed from RD 0.00 km to tail, construction of cement concrete channel wall from RD 0.150 km to RD 0.450 km and 15 m length up-stream of fall no.9,8,7,6 and 5 of Ambaguda Sub-Minor of Koimetla Distributary
Repair of fall and H/R structures, Cement concrete channel to the U/S of fall and vulnerable reaches, De-silting and Re-sectioning from RD.0.00Km to RD.1.650Km of Purnaguda Minor and from RD.0.00Km to RD.1.170Km of Purnaguda S/M Canal.
Repair of fall at RD.4.050Km, RD.5.080Km and RD.5.370Km of Goraspalli Minor, De-silting and Strengthening of Canal embankments and cement concrete channeling at vulnerable reaches in between RD.0.00Km to RD.3.690Km of Goraspalli S/M-III and from RD.1
Jungle clearance, De-silting and strengthening of Canal embankments in between RD.0.100Km to RD.2.370Km of Malavaram S/M-V and cement concrete channelling from RD.1.780Km to RD.1.895Km of Malavaram S/M-V and from RD.0.750Km to RD.0.845Km of Malavaram
Repair of Fall at RD.3.210Km, RD.3.330Km, RD.3.930Km, RD.3.990Km, RD.4.230Km, RD.4.365Km and RD.4.890Km and cement concrete channeling to the U/S of Falls, De-silting and Re-sectioning of Canal from RD.3.180Km to RD.5.430Km of Purunaguda Minor