Loading…
Loading…
797 results • Best match
Repair of fall at RD 0.420 km and RD 0.510 km, Providing CC Channeling from RD 0.570 km to RD 0.720 km of Mariwada SM-V, De-silting and Raising of bank from RD 0.00 km to Tail of Mariwada SM-V and VI
De-silting and Strengthening of Canal from RD.0.300Km to RD.1.890Km of Bapanpalli Minor-I, RD.0.270Km to RD.1.890Km of Bapanpalli Minor-II, Cement concrete channelling from RD.0.580Km to RD.0.700Km of Bapanpalli Minor-I and RD.1.570Km to RD.1.690Km o
Channeling with bed concrete from RD.0.090Km to RD.0.440Km of Pendikonda S/M-I, De-silting and Strengthening of Canal embankments from RD.0.00Km to RD.3.00Km of Pendikonda S/M-I and RD.0.00Km to RD.0.540Km of Pendikonda S/M-II.
De-silting of smart pond under NEPPA project at ICAR-CIFA, Kausalyaganga
Repair of C.D at RD.3.00Km, Construction of VRB at RD.3.190Km, Cement concrete channeling to the U/S and D/S of falls and De-silting and Strengthening of Canal embankments at vulnerable reaches from RD.0.00Km to RD.3.480Km of Telarai S/M IV.
Repair of fall at RD 0.440 km, providing CC channeling in between RD 0.325 km to RD 0.360 km, RD 0.520 km to RD 0.600 km, strengthening to bank in between RD 0.300 km to RD 0.740 km, de-silting and jungle clearance of Dhariguda S/M
De-silting and Strengthening of Canal from RD.5.650km to RD.6.030Km of Jimiliguda minor, from RD.3.00Km to RD.5.290Km of Biliguda Minor and from RD.0.800Km to RD.1.320Km of Jimiliguda S/M-I and construction of 2 Nos VRB in Jimiliguda Minor and Jimili
Jungle clearance, De-silting of Canal from RD.0.00Km to RD.1.710Km of Udayagiri Sub-Minor-I, RD.0.00Km to RD.1.530Km of Uskapalli Sub-Minor, Cement concrete channeling from RD.0.650Km to RD.0.770Km of Udayagiri Sub-Minor-I and RD.0.850Km to RD.1.020K
Repair of fall at RD.0.030Km, RD.0.144Km, RD.0.254Km and RD.0.570Km, Channeling from RD.0.960Km to RD.1.080Km of Telarai S/M-III and Construction of outer Retaining wall (L/B) and De-silting with Strengthening from RD. 53.110Km to RD.53.560Km of G.M.
Civil works
Renovation work and clearance of water hyacinth
C Repair of H/R at RD.0.00Km and fall at RD.0.070Km and RD.0.420Km and cement concrete channeling from RD.0.00Km to RD.0.510Km of Telarai F.C. off taking at RD.0.745 Km of Telarai S/M-III, De-silting and strengthening of Canal embankments of Telarai
S.R Such as De-Silting of drain of A Internal Road of 7th Bn, B Road from Acharya Vihar to Nalco via Sainik School from 0.00 km to 3.141 km, C Road Connecting of Coal India Staff Quarters to OPGC Colony side Road from 0.00 km to 0.255 km
Repair of fall at RD.0.300Km, RD.0.450Km and RD.0.500Km, Construction of C.D at RD.0.901Km and cement concrete channeling to the U/S and D/S of falls and C.D, De-silting and Re-sectioning of Canal from RD.0.500Km to RD.1.380Km of Purunaguda S/M
Providing CC channeling in between RD 0.295 km to RD 0.345 km, strengthening to bank in between RD 0.500 km to RD 1.000 km of Krusiwada minor, CC channeling in between RD 0.225 km to RD 0.275 km of Krusiwada S/M-I, de-silting and jungle clearance of
Construction of VRB at RD.0.150Km, cement concrete channelling from RD.0.450Km to RD.0.800Km of Pendikonda S/M-I and from RD.0.450Km to RD.0.550Km of Pendikonda S/M-II, repair to CD at RD.2.640Km and De-silting from RD.3.100Km to RD.4.870Km of Pendik
Cement concrete channelling from RD.2.500Km to RD.2.650Km of Mohanpur Minor, RD.0.00Km to RD.0.100Km of Mohanpur S/M-II, RD.0.00Km to RD.0.050Km of Mohanpur S/M-III, De-silting of Canal from RD.0.00Km to RD.3.300Km of Mohanpur Minor, RD.0.00Km to RD.
De-silting from RD 0.00 km to RD 1.740 km, construction of protection wall from RD 1.800 km to RD 1.885 km and repair of canal syphon at RD 2.180 km of Gagarmetla Sub-Minor and repair of fall at RD 4.230 km of T.Salimarikonda Minor of Koimetla Distri
De-silting and Strengthening of Canal from RD.0.00Km to RD.2.580Km of Koikonda S/M-I and RD.0.00Km to RD.0.945Km of Koikonda S/M-III, repair of fall at RD.0.095Km, RD.0.180Km, RD.0.561Km, RD.0.660Km, RD.0.771Km, RD.0.880Km, RD.1.540Km, RD.1.590Km, RD
Providing CC Channeling from RD 0.400 km to RD 0.600 km, Strengtehning to Bank in between RD 0.600 km to RD 0.900 km of Kodelmetla Minor, De-silting and Jungle Clearance from RD 0.00 km to RD 2.00 km of Saradapalli Minor and from RD 0.00 km to RD 1.
Providing CC channeling from RD 0.540 km to RD 0.620 km and RD 0.750 km to RD 0.895 km, de-silting and jungle clearance from RD 0.000 km to RD 1.000 km, RD 1.675 km to RD 1.850 km and RD 2.325 km to RD 3.360 km of Potteru Minor
Providing CC channeling in between RD 0.00 km to RD 0.170 km and in between RD 1.900 km to RD 2.00 km, strengthening to bank in between RD 0.500 km to RD 0.900 km and de-silting from RD 2.500 km to RD 3.500 km of Chidupalli S/M-VI
De-silting and Strengthening of Canal from RD.0.300km to RD.0.800Km of Tamanpalli S/M-II, from RD.0.200Km to RD.0.600Km of Kunanpalli S/M-I and from RD.0.00Km to RD.1.860Km of Kunanpalli S/M-II and Cement concrete channeling from RD.0.600Km to RD.0.
Desilting by dredging
Desilting by Dredging
Desilting through Dredging, Weed clearance
Renovation of dykes and de-silting of ponds of Anabas and Murrel unit at ICAR-CIFA, Kausalyaganga
Repair and renovation of fall at RD 1.440 km and CC channeling in between RD 1.230 km to RD 1.480 km of Kenduguda S/M-1 and in between RD 0.390 km to RD 0.690 km of Kenduguda S/M-2 and de-silting and re-sectioning of Kenduguda S/M-2 in between RD 0.7
Bank strengthening from RD 1.680 km to RD 2.480 km of left bank, bed lining from RD 4.390 km to RD 4.650 km, repair and skinning of fall no.02 at RD 4.080 km and fall no.03 at RD 4.290 km and De-silting from RD 0.00 km to RD 2.700 km of Koimetla Dist
De-silting from RD 6.200 km to RD 7.500 km, Bed lining from RD 10.325 km to RD 10.518 km, repair and skinning of fall no.04 at RD 5.960 km, fall no.05 at RD 9.100 km and fall no.06 at RD 9.790 km and strengthening of bank from RD 7.200 km to RD 7.400
Civil works
Civil works
S.R Such as De-Silting of drain of A Link Road no-1 Unit-IX RZ, B Link Road no-2 Unit-IXRZ, C Link Road no-4 Unit-IXRZ, D Cross Road-1 of Link Road no-1 to 5, E Cross Road-2 of Link Road no-1 to 5, F Cross Road-3 of Link Road no-1 to 5, G Cross Road
Civil works
Silt clearance and jungle clearance from RD 32.075Km to 41.467Km of LMC
Silt clearance and bush cutting from canal bed
Hyacinth clearance from Drainage channel and Desilting of drainage channel by dredging method.
Renovation of open well by de-silting, plastering, raised platform, pumping system etc. for supplementary water supply from 2nos. of wells at ICAR-CIFA, Kausalyaganga.
Silt clearance from canal bed of Left Main Canal of Manjore Irrigation Project.
Desilting by Dredging, Earthwork excavation by mechanical means,Clearance of Water hyacinth.
Silt clearance from Left Main Canal from RD 6350m to 10770m of Manjore Irrigation Project.
Renovation of structures, silt clearance and bank strengthening of Gungunia Disty. from RD 6570m to tail.
Silt clearance from rocktoe drain service drain and bush clearance from slope of earth dam of MIP.
Capital dredging to clear the hard patches in North Dock Complex area of Paradip Port
Silt clearance of Girisola Canal in between RD 6.80 Km to 16.90 Km for the year 2025-26.
Silt clearance of Girisola Canal in between RD 0.10 Km to 9.90 Km for the year 2026-27.
Silt Clearance of Kendrapara Canal between RD 4.800 Km to RD 10.980 Km for the year 2025-26
Earthwork(Dredging)