Loading…
Loading…
3,798 results • Best match
Jungle and Silt removal in Chinthakani Major from Ch 0.000 KM to 5.600 KM (with in Khammam Municipal Corporation limits), Khammam Urban Mandal, Khammam District.
I and CADD SRSP-I O and M Jungle clearance and Silt removal from Km.0.000 to Km.17.000 of DBM-31 of SRSP-I
Emergency Repairs to Electro Mechanical Equipment and silt removal from Sump Well of L-11-12 L.I. Scheme near Annapureddygudem (V), Vemulapally(M), Nalgonda District
Estimate for Silt Removal and Jungle Clerance of RF and LF Main Canal of Vattivagu Project near Pahadibanda (V), Asifabad (M), Kumram Bheem Asifabad (Dist)
Estimate for Jungle clearance ,Silt removal and strengthening of inspection path along the Sadarmatt Anicut LF canal from CH 0.00 km to 21.530 km, Nirmal District
Emergency Repairs for silt Removal in Canal Bed of Palaram Major from Km 0.00 to Km 14.208 of NSLBC in Ananthagiri (M), Suryapet District(2nd Call).
O and M - Estimate for Removal of jungle, Jauliflora, Strengthing of Bund and silt Removal in irrigation channel of Kandikunta, N.GKothapally(V), Shaligowraram(M), Nalgonda(D).
Estimate for Silt Removal and Jungle Clerance of RF and LF Main Canal Distributaries of Vattivagu Project near Pahadibanda(V), Asifabad (M), Kumram Bheem Asifabad Dist
FDR-Resection of Breach on Gravity canal Package-47 at chainage Km 20.30 by filling Cavities and Silt removal at Makthal(V),Makthal(M), Narayanpet Dist.
Estimate for Banking Silt removal Jungle Celarance and repairs to LF RF Main Canal Inspection Path of Laxmipur Balancing Reservior Tank Laxmipur(V) Jainath(M) Adilabad District
Jungle clearence and silt removal in Irrigation Channel (Thimmakka kaluva) & repairs to damaged earth work in jaalu kaluva of Rangasamudram Balancing Reservoir Srirangapur (V&M),Wanaparthy(Dist).
Estimate for Jungle Clearance Silt removal and repairs to canal inspection path of LF Main Canal of Mathadivagu Medium Irrigation Project Waddadi(V) Thamsi(M) Adilabad District
Jungle Clearance Silt removal and construction of Damaged structures in Right main canal and Left main canal of Komatipally Anicut near Komatipally Village, Mangapet Mandal, Mulugu District
FDR-2022-Emergency-Temporary restoration to Silt removal from km.6.700 to Km.7.00 o f D-28 of Saraswathi canal near Bavapur(V) Khanapur(M) Nirmal District.
Annual maintenance and Pre Monsoon Desilting of S.W Drains by bucket desilting machine in Syednagar 142, Circle-33, GZ,GHMC. for the year 2026. (Item No.1) 2nd RECALL
DESILTING ANNUAL DESILTING OPEN NALA BY MECHNICAL MENAS FOR THE YEAR 2025 IN RAMNASPURA DIVN
Repairs to OT at Km. 11.60 and Jungle Clearance and Silt Removal from RSB - D83 Main Canal from Km 0.000 to Km 9.489. (Work entrusted under SC Category only)
O&M - Estimate for Jungle Clearance , Jammu Removal & Silt Removal on LF Main Canal & RF Main Canal of Vattivagu Project near Pahadibanda (V), Asifabad (M), Kumram Bheem Asifabad Dist
Dredging of JVR park pond in ward 92 Venkateshwara colony in Cir-18 KZ GHMC (Item No.2)
Annual maintenance and Pre Monsoon Desilting of S.W Drains by bucket desilting machine in Ahmednagar -144, Masabtank Circle-34, GZ, GHMC. for the year 2026. (Item No.6) (Reserved for STs Reservation only)
Construction of Guide walls to the Gandravarigudem open main canal and silt removal from open main canal of stage-I of L-14 L.I Scheme, Vemulapally (V&M), Nalgonda (D).
Estimate for Jungle Clearance, Silt removal and strengthening of Inspection path along Left main canal from CH 0.000 Km to CH 16.000 Km of Kaddam Narayana Reddy Project Nirmal Dist
Jungle Clearance and Silt Removal of North East Canal of Dindi Medium Irrigation Project from 0.000 Km to 12.000 Km in Gundlapally (M) of Nalgonda District (Reserved for SC Community).
EMERGENCY REPAIRS FOR SILT REMOVAL IN CANAL BED OF REDLA KUNTA MAJOR FROM KM 0.00 TO KM 7.340 AND FROM KM 12.00 TO KM 16.00 IN KODAD(M), SURYAPET DIST.
Desilting of Drains in Bellampally Municipality
Desilting of major Nala in Ward No 7Edulabad in Gharkesar Circle6 GHMC for the year 2026
Emergency-Temporary restoration to Silt removal at from km.0.00 to 0.400 km on Palkeri vagu Right canal of D-28 of saraswathi canal near Rajura(V) Khanapur (M) Nirmal District
Desilting in Ward Nos 1 to 37 in Zaheerabad Municipality Sangareddy District under MGF/15th FC Grants.
Annual Maintenance of desilting of SW. Drains by using Bucket Cleaning for pipe line and desilting of SW sections for the year 2026 in Baghlingampally Ward - 164 , Musheerabad Circle - 41, Secunderabad Zone. GHMC (Rs. 5.00 Lakh)
Repairs to Nukalampadu Major of 21st MBC on NSLBC clearing Jungle, cutting of jauliflora bushes and silt removal from KM 8.600 to Km 13.720 in Nukalampadu (V) and Enkoor (M), Khammam District.
PJP-LMC Jungle clearance, Jammu removal, silt removal, repairs to lining and strengthening of inspection path from Km 0.00 to 2.00 KM of D31 of PJP LMC in Chinambavi (M) Wanaparthy (D)
Annual Maintenance of desilting of SW. Drains by using Bucket Cleaning for pipe line and desilting of SW sections for the year 2026 in Ram Nagar ward - 170 , Musheerabad Circle - 41, Secunderabad Zone, GHMC (Rs. 8.70 Lakh)
Desilting of Strom water Drains in Ward No. 5-Nagaram in Circle-6, Ghatkesar, GHMC for the year 2026
DESILTING OF STROM WATER DRAINS AND NALAS AT VARIOUS PLACES IN GUMMADIDALA MUNICIPALITY UNDER MUNICIPAL GENERAL FUNDS 2025-26
Desilting of Ramayyavari Kunta in Medchal Municipality.
Desilting of Major Nalas in Wad No.9 and 10 in Boduppal Circle-10 GHMC for the year 2026-27
Desilting and annual maintenance of SW Drain for the year 2026 in 209- AG Colony division, Circle-38, KZ, GHMC
desilting of openwell at west fort esanna bavi khila warangal in div.no.38, GWMC (General Funds 2025-26) 2nd call
Annual maintenance of desilting of SW. Drains by, using Bucket Cleaning for pipe line ,and desilting of SW sections for the ,year 2026 in Bakaram Ward No - 168, Kavadiguda ,Circle - 40, SBZ, GHMC (Reserved for Waddera Communities Only) (Rs. 3.30 Lakh)
Arrangements for bathukamma festival 2025 by engaging of tent, chairs, silt clearance, waler filling, spreading of dust and engaging labour in Pedda Cheruvu in Ward No.12, Mansoorabad in Hayathnagar Circle-3. GHMC.
Arrangements for Bathukamma Festival 2024 by engaging of tent, chairs, silt clearance, water filling, spreading of dust and engaging labour in Nagole Lake in Ward No.11, Nagole, in Hayathnagar Circle-3, GHMC.
Arrangements for Bathukamma Festival 2024 by engaging of tent,chairs, silt clearance, water filling, spreading of dust and engaging labour in Mansoorabad Lake in Ward No.12, Mansoorabad, in Hayathnagar Circle -3, GHMC.
O&M - PJP - LMC - Removal Jungle, Jammu & Silt clearance from km 3.00 to Km 7.00 of D-40 Distributory in Kondur village, Pentlavally Mandal, Wanaparthy Dist.(This work reserved for SC category only)
Arrangements for bathukamma festival 2025 by engaging of tent, chairs, silt clearance, waler filling, spreading of dust and engaging labour in Nagole Lake in Ward No.11, Nagole in Hayathnagar Circle-3. GHMC.
(3rd Call) Repairs to Canals, Strengthening of Canal Banks, Laying of Sand Bags in breached portion and silt removal works for Peddavagu Medium Irrigation Project near Gummadavalli (V), Aswaraopeta (M), Bhadradri Kothagudem District
Operation and Maintenance Emergency Repairs for Silt removal and Jungle clearance of SRSP Stage-II DBM-71 Main Canal from Km 39 640 to Km 54 740 in Chivvemla Mandal of Suryapet District
Emergency Repairs for silt removal in canal bed of 21R Minor of Redlakunta Major and 11L Sub Minor of 21R from Km 0.00 to Km 4.176 of NSLBC in Kodad Mandal, Suryapet District
I&CAD Dept., - O&M - LT Bayyaram - Medium Irrigation- Silt Removal in canals and Repairs to Protection wall on Pedda kalva of LT Bayyaram tank near Bayyaram (V)&(m) Mahbubabad District- 3rd Call.
Pre and Post monsoon desilting of Storm Water Drains ( Manually) at Rudraram and Lakdaram in Isnapur Municipality under Municipal genral funds
Annual Desilting of strom water drains by Mechanical means the year 2026 in Kishanbagh-111Circle.21 Bahadurura Rajendra Nagar Zone GHMC