Loading…
Loading…
3,798 results • Best match
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle -II Area of Nizamabad Municipal Corporation.
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle -I Area of Nizamabad Municipal Corporation.
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle -IVB Area of Nizamabad Municipal Corporation.
Sanitation Work Assigned on Work Contract Basis by engaging workers for Door to Dorr Collection and Segragation of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc for the Period of 6 Months inclisive all taxes and all benefits for sanitation Circle - IV A Area in Nizamabad Municipal Corporation
Sanitation Work Assigned on Work Contract Basis by engaging workers for Door to Door Collection and Segragation of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc for the Period of 6 Months inclisive all taxes and all benefits for sanitation Circle - II Area in Nizamabad Municipal Corporation
Sanitation Work Assigned on Work Contract Basis by engaging workers for Door to Door Collection and Segragation of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc for the Period of 6 Months inclisive all taxes and all benefits for sanitation Circle - I Area in Nizamabad Municipal Corporation
Sanitation Work Assigned on Work Contract Basis for by engaging workers Door to Door Collection and Segragation of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc for the Period of 6 Months inclisive all taxes and all benefits for sanitation Circle - IV B Area in Nizamabad Municipal Corporation
Sanitation Work Assigned on Work Contract Basis by engaging workers for Door to Door Collection and Segragation of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc for the Period of 6 Months inclisive all taxes and all benefits for sanitation Circle - V Area in Nizamabad Municipal Corporation
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle - V Area of Nizamabad Municipal Corporation.
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle -III Area of Nizamabad Municipal Corporation.
Sanitation Work Assigned on Work Contract Basis by Engaging Workers for Door to Door Collection and Segration of Wastage, Lifting of Garbage, Drain Cleaning, De-silting of Nalas, Road Sweeping etc., for the Period of 6 Months inclusive all taxes and all benefits for Sanitation Circle -IVA Area of Nizamabad Municipal Corporation.
De-silting of existing 600mm dia sewer main pipe line and repairing of manholes from 19-4-281/C/13/B to 19-4-279/D/75, Teegalkunta on Ansari road of I and D structure of 10 MLD STP Miralam Tank under Bahadurpura section Sub Division-I of Operations and Maintenance Division-I
cleaning the guard pond located in ETP by using mechanical means with the help of JCB and disposing the same through tractors. Placing the JCB inside the guard pond is in the scope of department and restoring the same after completion of the work.
De-silting and cleaning of Enukunta Railway Pond/Kunta in division No.17 in Khammam Municipal Corporation
Silt Removal in Super passage in FFC canal
De-Silting of Storm water drain from Presidency School to Naimnagar Bridge via Rajaji Nagar and Ramnagar in Division no.52
cleaning of various sumps channels and tanks in plant area during MTA period
Jungle clearance and silt removal works on KHAMMAM MAJOR-II, Khammam District
Silt removal for Open Drainages in ward no 16 in Choutuppal Municipality
O and M - Emergency repairs for removal of jungle, jauliflora, strengthening of bund and de-silting of Siddappa cheruvu, Thatipamula (V), Thirumalagiri (M), Suryapet District.
Jungle Clearance and Silt Removal from L.F Canal , R.F Canal and Desilting of Approach Channel from U/s of R.F Sluice and L.F Sluice @ Ralivagu Project near Mulkalla (V), Hajipur(M), Mancherial Dist
Uprooting and clearing prickly jungle, cutting of bushes, removal of silt, restoration of damaged stone walls, pointing to surface of wall etc as per RFP and directions of ASI officials
Procurement of Back-Hoe Loader For Sanitation, Nala De-silting, Solid Waste Management and Civil Works in Various Of Wards Khanapur Municipality Under 15th FC Grants
Engaging of Excavator for silt removal in strom water drains in Mancherial Municipal Corporation
DRILLING, BLASTING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING, ETC., OF 13.739 LBCM OF IN-SITU OB (WHICH INCLUDES 2.513 LBCM OF TOP SOIL, 7.540 LBCM OF SUB SOIL and 3.686 LBCM OF HARD OB) AND RE-HANDLING OF 5.739 LCM OF ... / DE -SILTING ... /DE- SILTING AT ...
Estimation for Silt removal in Gundu vagu feeder channel to Peddacheruvu Tekmal(V),Tekmal(M), Medak District.
De-watering decomposed well, de-silting accumulated silt, cleaning the well, Removal of damaged grill and Providing new railing, illumination, closing roof of drain complete as per NIT and directions of ASI officials
Engaging of machinery and Labour for silt removal in Drainage in various locations in 20 wards of Choutuppal Municipality
SRSP - Stage-1 - Jungle clearance and silt Removal on M27L of D-83 from Km. 3.435 to Km. 8.74
Estimate for Repairs to Canal guide walls and silt removal of Ooti Cheruvu Gowraram (V) Penballi (M) Khammam (Dist)
Jungle clearance and silt removal works on Feeder Channel of Pedda cheruvu near Dhamsalapuram(V),Khammam Urban (M),Khammam Dist.
Estimate for Silt removal and Jungle Clearance on Irrigation Channel of Ooracheruvu Tank in Nereducharla(Vi), Nereducharla (M), Suryapet District
FDR- Temporary Restoration - Silt Removal in Vents of Super Passage at km 9.250 of D-27 Saraswathi Canal of SRSP.
Engaging 1 No of Hydraulic Silt Grabber Machine (On Hire Basis ) for Desilting the sewer Manholes for a period of 3 months and loading , transportation and unloading of silt removal from Manhole under Moghalpura Section SD-III of O&M Div-I (2nd Recall)
Please refer Tender Documents
Removal of accumulated debris, Documentation, Removal of bulged and fallen wall stone members, Procurement of hard granite stone blocks, Resetting of ancient well walls, De-silting, Earthwork Excavation, Providing PCC, Laying of apron, etc. all compl
Engaging of Itachi for Deepening and silt removal of Nagulakunta weir of in Choutuppal Municipality under MGF or SFC or Other grants
Emergency O&M Work on Kattalair Left canal for silt removal from Km 5.000 to Km 5.800 near Mamunuru(V),Yerrupalem(M)
Emergency O&M Work on Kattalair Right canal for silt removal from Km 3.250 to Km 4.250 near Ramannapalem(V), Yerrupalem(M)
OM - Jungle clearance and Silt Removal on DBM-48 from Km.46.50 to 66.00 Km including its minors , Kuravi (M), Mahabubabad District
HMR - Silt removal from existing drains and catch pits from Miyapur to Assembly reach in corridor-I for the year 2018-19
Repairs to the Distributory No.8 canal of Right Main canal Wyra Medium Irrigation Project by Jungle Clearance and silt removal Khammam District.
Jungle Clearance, Silt Removal on LF main canal & RF main canal of Vattivagu Project near Pahadibanda (V), Asifabad (M), Komuram Bheem Asifabad District
Engaging of Pontoon Mounted Excavator along with Hitachi for additional Dredging cleaning the shoreline and desilting of bed at Saroornagar Tank bund post Ganesh Festival for the year 2024 in Ward No.23, Gaddiannaram of Saroornagar Circle-5, GHMC
Emergency Repairs for silt Removal in Canal Bed of Palaram Major from Km 0.00 to Km 14.208 of NSLBC in Ananthagiri (M), Suryapet District.
PJP-LMC-Removal of jungle clearance &silt removal from km 0.00 to km 4.00 of D-19, 11L minor of Pebbair Mandal, Wanaparthy (dist.)
Emergent Silt Removal and Jungle Clearance from Km12.450 to Km 14.490 of RMC of Upper Manair Project in Musthabad (V&M), Rajanna siricilla Dist.
Emergency Repairs for silt removal in canal bed of Ganapavaram Major from Km 0.00 to Km 9.70 of NSLBC in Kodad Mandal, Suryapet Dist
O & M Estimate for Jungle Clearance on Earth Bund and Silt Removal from Toe Drains of M.Bagareddy Singur Project, Singur(V), Pulkal(M), Sangareddy(D)
Estimate for Jungle Clearance, Silt removal and repair to RF main canal inspection path of Sathnala Medium Irrigation Project, Kanpa(V), Jainath(M), Adilabad District