Loading…
Loading…
643 results • Best match
Formation of 100ft wide Master Plan from NH 16 to Bakkannapalem via Saipriya layout, Visakhapatnam balance left over stretch 280 Mtrs
Construction of Retaining Wall Atrium Convention Centre at Sagar Nagar along Master plan Road in Ward No. 08 of Madhurawada Zone.
Demolishing of existing encrochments on 80ft master plan road from CC road at Chintalachenu to DBR Railway Gate Ward No.4.
Widening to 2 lanes under Phase-I for Master Plan road from Boyapalem jn., at NH 16 to Kapuluppada village, Visakhapatnam
CONSULTANCY SERVICES FOR PREPARATION OF PROJECT FEASIBILITY REPORT (PFR) FOR DEVELOPMENT OF RO-RO SERVICES BETWEEN IBRAHIMPATNAM (Left bank) TO LINGAYAPALEM/ HARICHANDRAPURAM (Right bank) ON RIVER KRISHNA (NW-4) TO FACILITATE INLAND WATER TRANSPORT IN THE STATE OF ANDHRAPRADESH
CONSULTANCY SERVICES FOR PREPARATION OF PROJECT FEASIBILITY REPORT (PFR) FOR DEVELOPMENT OF RO-RO SERVICES BETWEEN IBRAHIMPATNAM (Left bank) TO LINGAYAPALEM/ HARICHANDRAPURAM (Right bank) ON RIVER KRISHNA (NW-4) TO FACILITATE INLAND WATER TRANSPORT IN THE STATE OF ANDHRAPRADESH
CONSULTANCY SERVICES FOR PREPARATION OF PROJECT FEASIBILITY REPORT (PFR) FOR DEVELOPMENT OF RO-RO SERVICES BETWEEN IBRAHIMPATNAM (Left bank) TO LINGAYAPALEM/ HARICHANDRAPURAM (Right bank) ON RIVER KRISHNA (NW-4) TO FACILITATE INLAND WATER TRANSPORT IN THE STATE OF ANDHRAPRADESH
Consultancy Services for preparation of Detailed Project Report for construction of 2 lane 4 lane ROB in lieu of Level Crossing no.KK 26 Railway Ch. Km 109 20 21 at Existing Ch Km 37.003 of NH 516E in the State of Andhra Pradesh
Consultancy services for preparation of Detailed Project Report for widening and strengthening to 2-lane with paved shoulder from intermediate lane of NH-516E from km 16.000 to 28.800 of Rajamahendravaram to Rampachodavaram in the State of Andhra Pradesh on EPC mode
Main work:- Construction of High Level Bridge across Gogullanka Branch of Vrudha Gowthami River at Km 1/10 of Guthenadeevi to Bhiravalanka road in East Godavari District. Sub Work:- Construction services for survery, Investigation and preparation of ... of Detailed project report including ...
Preparation of detailed project report for Construction of ROB atNowpada gate between Kotabommali - Nowpada station in lieu of LC No.393 at Railway km.702/31-33 ie road chainage at km.2/6-8 of Nowpada - Meliaputti road in Srikakulam District.
Consultancy services for Preparation of Detailed Project Reports for Sewage Treatment Plants (STPs) including Geotechnical Investigation, Structural Designs, Engineering Drawings, Detailed Estimates for the entire proposed STP and other appurtenant works (Interception and Diversion works) and O and M satisfying deliverables in various ULBs under swachha Andhra Corporation
Preparation of Detailed project reports for Road Bridge works in respect of Rural connectivity of PVTG habitations under PM-JANMAN Programme PMGSY-IV of G.Madugula, Munchingput, Araku, Hukumpeta and Paderu Mandals in Alluri Seetharamaraju District consisting of 65 Road works with a length of about 153.60kms Est.Cost.Rs.46.08 Lakhs
Preparation of Detailed project reports for Road Bridge works in respect of Rural connectivity of PVTG habitations under PM-JANMAN Programme PMGSY-IV of G.Madugula, Munchingput, Araku, Hukumpeta and Paderu Mandals in Alluri Seetharamaraju District consisting of 65 Road works with a length of about 153.60kms Est.Cost.Rs.46.08 Lakhs
Preparation of Detailed project reports for Bridge works in respect of Rural connectivity of PVTG habitations under PM-JANMAN Programme of Pedabayalu and Munchingput Mandals, consists of 07 number of Bridge works with a length of about 350 Rmt. in Alluri Seetharamaraju District Est. Amount Rs. 33.00 Lakhs (Tentative)
Consultancy services for Preparation of Detailed Project Reports for Sewage Treatment Plants (STPs) including Geotechnical Investigation, Structural Designs, Engineering Drawings, Detailed Estimates for the entire proposed STP and other appurtenant works (Interception and Diversion works) and O and M satisfying deliverables in various ULBs under swachha Andhra Corporation
Name of work : Construction of New Residential Quarters Block for three Senior Civil Judges and four Junior Civil Judges in District Court Complex premises in Vizianagaram. Sub Work : Presurvey estimate for consultancy charges for Preparation of DPR for the work of "Construction of New Residential Quarters Block for three Senior Civil Judges and four Junior Civil Judges in District Court Complex premises in Vizianagaram.
Formation of BT Road for 100'-0" wide Master Plan Road from Law College Road (Panorama Hills) to Rushikonda Layout (Phase-II).
Supply, Delivery and Fixing of RCC Pre-Cast Slabs for Demarcation of the Master Plan Roads in Renigunta Mandal and Vadamalapeta Mandal
Formation of Master Plan Road and approach Road to Open Space and construction of CC drains in IP, Peddapuram Ph-III E.G.Dist
Hire charges for providing JCB, Proclainer, Compressor, and Tractor for dismantling the structures (houses/shops/lodges) in view of the Master Plan
Preparation of Detailed Master Plan and Preliminary Design report for Roads & Services / Utilities for Nakkapalli Industrial Area at Visakhapatnam in Andhra Pradesh
Construction of Retaining Wall Opp. Sun Beach Campus at Sagar Nagar along Master plan Road in Ward No. 08 of Madhurawada Zone.
Formation of quarry rubbish road for 100 ft wide Master Plan Road Connecting Duvvada Station Road and Lankelapalem Asakapalli Road at Pedamushidiwada
RFP for Engagement of Consultant for Integrated Master Plan including Infrastructure, Financial Plan and Detailed Land Pooling Area Plan in APCRDA Region
RFP for Engagement of Consultant for Integrated Master Plan including Infrastructure, Financial Plan and Detailed Land Pooling Area Plan in APCRDA Region
Appointment of Consultant for comprehensive services for Preparation of Master Plan and Cost estimate for Proposed Permanent campus of Central University of Andhra Pradesh at Anantapur Andhra Pradesh
APCRDA - Extension of Raw Water Supply Pipe Line from E6 Master Plan road to Gazetted Officers Quarters Site in Amaravathi Government Complex Area
Formation of BT road for 100 Feet wide Master Plan road from Yendada to Rushikonda Jn., via GITAm College Chainage 2100.00M to 2800.00M
Demolition of building and carting of demolished materials form site for widening of master plan road from Nehru Street to Head Post Office.
General fund - 2021-22 - Structural valuation from sadbhavan circle to upto 100 feet master plan road near ZPH School, muddireddypalli in hindupur municipality.
Construction of SW Drains and CD works to 100 ft wide master plan road from MSME Park to Pydiwada Agraharam Jn Anakapalli District
Detailed investigation, HP's Designs & Drawings and preparation of detailed project report for excavation feeder channel from KM 0.000 to 17.000 including CM & CD works to feed water to pedderu project, taking off from KM 29.425 of Thamballapalle branch canal in Thamballapalle mandal of Chittoor District.
Consultancy Services for Preparation of Detailed Project Report for Upgradation of existying Road to Two lane with paved shoulder configuration for NH 167B of Mydukur - Singarayakonda Via Porumamilla & SeethaRamapuram roadfrom Km 0/0 to 43/097 in Kadapa District of State of Andhra Pradesh.
Conducting presurvey investigation and preparation of Detailed Project Report of Construction of 4 lane road from NH.67 to APHSL Steel Plant near Sunnapurallapalli village in YSR District JK Road to Kanyatheertham road from Km 0.000 to 10.000 and 1.50 KM inside the factory
Main Work : Construction of Four Court building complex at Bobbili in Vizianagaram District. Sub work : Consultancy Services for Preparation of Detailed Project Report including supply of Architectural Plans and Structural Designs for the work "Construction of Four Court Building Complex at Bobbili in Vizianagaram District".
Request for Proposal for Appointment of Consultant for Preparation of Detailed Project Report to connect the Krishna River Right Bank Bund Road (from the existing Flood Pumping Station near Undavalli) to the Downstream of the Right Bank Bund Road (up to Varadhi) in Andhra Pradesh.
Consultancy services for preparation of detailed project report for forming and upgradation of Byepass road to Adoni town to a length of 5.74 Kms connecting N.H-167(Hagari-jadcherla road) from 62/700 to 70/0 in Kurnool district in the state of AP.
Request for Engaging the DPR Consultant for Preparation of Detailed Project Report for (A) Present Ground Status Assessment of the implemented works (B) Preparation of BOQs and Cost Estimation of the balance works duly incorporating rehabilitation and Retrofitting Works, Bid Preparation, for LPS Zones-1,2,3,4,5(A,B,C & D), 6,7, 9,9A, 12, 12A & AGC Infrastructure of Amaravathi Capital City (C) Detailed Design and Project Report, Preparation of BOQs and Cost Estimates and Bid Preparation for LPS Zone8 & Zone-11
Formation of Gravel Road for 60' MP Road from Srinivasam Compound Wall (North-East Corner) to 80' North-South Master Plan Road in Tirupati
Crda-Formation of road for 60 wide master plan road connecting puttathota road to Amaravati road adjucent to tank at Yerrabalem(V) Mangalagiri(M)
Construction of CD works and formation with available earth for 100 feet wide Master plan road via GITAM College Chainage from 2100.00M to 2800.00M
Providing B.T. Road to 60 Feet Master Plan at Vasavi Nagar Main Road from Guntur-Vijayawada Road to NH-16 in Div. No.01
Construction of CD works and formation with available earth for 100 feet wide Master plan road via GITAM College Chainage from 2100.00M to 2800.00M
Fixing of RCC Pols for master plan at Postal Colony, Koramenugunta Pragathi Nagar area in 3rd and 4th Ward (Reserved for ST/ST Waddera).
Formation of 80 wide Master Plan Road connecting NH 16 to Sakshi Press via Nagarampalem Village Visakhapatnam balance 40ft wide road via Vambay Colony
Providing central lighting with 9.0 mtr Decorative poles along with LED street lights to Master plan Road from Adivaram Junction to Sontyam Junction (8.0Km)
Investigation & Design for construction of Pressure main (Extension of CBR to Erraballi Tank Lift Scheme upto Giddangivaripalli New Reservoir) and Investigation & Design for Construction of New Reservoir near Giddangivaripalli Village in Vempalli ... and preparation of DPR for ...
Investigation & Design for construction of Pressure main (Extension of CBR to Erraballi Tank Lift Scheme upto Giddangivaripalli New Reservoir) and Investigation & Design for Construction of New Reservoir near Giddangivaripalli Village in Vempalli ... and preparation of DPR for ...
Sub work Pre-Survey estimate for conducting Total Station Survey Alignement Fixation L/S and C/S of River and Road Sections, Sub Soil Exploration Sub Soil Investigation Report Design of Bridge Road CD works including Preparation of DPR with all relevant Drawings under the main work of Reconstruction of HLB across River Suvarnamukhi at km 19/4-6 of Saluru Dalaivalasa road via Dandigam and Kurukutti in Vizianagaram Distrct