Loading…
Loading…
60 results • Best match
APPOINTMENT OF CONSULTANT FOR PREPARATION OF DPR, DER, ARCHITECTURAL DESIGN, MASTER PLAN AND ENGINEERING SERVICES FOR ICP BHITTAMORE ON INDO NEPAL BORDER
(a) Feasibility study and detailed project report for elimination of level crossing with road over bridge at Railway crossing of Katihar Division.(38 L-Xing). (b) Feasibility study and detailed project report for elimination of level crossing with road over bridge at Railway crossing of Katihar Division.(55 L-Xing).
Consultancy Services for preparation of DPR cum feasibility report for construction of 4 lane of the existing 2 lane road from Parsarma to Araria NH327E in the state of Bihar.
Consultancy services for Preparation of Feasibility study and Preparation of Detailed Project Report including LA and Other clearances for construction of DPR work for Bypass/Realignment of Spur to Balia of NH-120 in the State of Bihar.
CS for Preparation of Feasibility Study for Development of MMLP and Detailed Project Report for external trunk connectivity infrastructure to the MMLP Site at Nashik and Patna
Feasibility study Land Acquisition and preparation of DPR for i Construction of Bypass in south east Direction of Darbhanga. ii Baheri Spur of NH 527E iii km 104 Bhitha More to KM 217 Naraharia of NH104
Engagement of Consultant for Providing Consultancy Services for Feasibility Study Detailed Master Planning Urban Designing Engineering And Preparation of Detailed Project Report DPR for Integrated Re Development of Bhagalpur Railway Stations of Malda Division Eastern Railway
Preparation of Feasibility study and Detailed Project Report for Construction of Two lane with paved shoulder Through Green Field From Vishwanathpur to Kharkabasant New NH122A of Sitamarhi District in Bihar
Consultancy services for Feasibility study and Preparation of detailed project report including LA and other clearances for construction of Jehanabad Bypass connecting NH33 and NH 83 in the State of Bihar
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of 4-laning in Km 0 to 141 (Bariarpur to Bishunpur) of NH-333 with land acquisition in the State of Bihar
CS for Feasibility study and Preparation of DPR including LA and Other Clearance for 4 Laning of Kujapi(Gaya) to Panchanpur(Gaya) from Km 103.865 to Km 118 of NH120 and Dobhi to Gosaidih from Km 0.00 to Km 13.00 of NH99(New NH22)in the State of Bihar
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 2 Laning from Mishraulia to Bhengari (UP_Bihar Border) of newly declared NH 727B for Year 2024_25 in the State of Bihar.
Consultancy Services for preparation of feasibility study and detailed project report including land aquisition and other statutory clearances for construction of ROB and its approaches at km 8 on NH527A in the state of Bihar for the year 2024-25
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 4 Laning of Arwal to Biharsharif from km 0.00 to km 89.00 of NH 110(New NH 33) in the State of Bihar.
Consultancy Services for preparation of DPR for Construction of Buxar Bhagalpur High speed Corridor Expressway in the state of Bihar
Consultancy Services for Preparation of DPR for Construction of Moregram Kishanganj High Speed Corridor in the State of West Bengal
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for Construction of W and S to 2 Lane with paved shoulder from Km 41 to Km 92 of NH 2C (New NH-119) in the State of Bihar.
Consultancy Services for Preparation of Feasibility Report (FR) and Detailed Feasibility Report (DFR) for Laying of Railway Siding for Manual RPC (Refinery Pet Coke) Rack Loading at IOCL, Barauni Refinery.
Consultancy Services for preparation of DPR for 4laning of Masrakh Rajapatti Fazillahpur Kesariya Chakia Sitamarhi Bhitha More (150 km.) sec of Ram Janki Marg in Bihar.
Consultancy Services for Preparation of Detailed Project Report for the work of 4 (Four) laning of Buxar-Varanasi Road. (Total Length 108 Km).
Consultancy Services for preparation of DPR for development of Greenfield Access Controlled Highway from Patna to Purnia in the State of Bihar under Bharatmala Pariyojana Phase-II
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED MASTER PLANNING, URBAN DESIGNING, ENGINEERING AND PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING ALL OTHER DOCUMENTS REQUIRED FOR MAJOR UPGRADATION OF SITAMARHI RAILWAY STATION
Consultancy Services for Preparation of Feasibility study and DPR for Construction of Elevated corridor Anishabad Patna Phulwari AIIMS 7.00 Km on Anishabad Aurangabad Hariharganj Road NH98 New NH139 in the state of Bihar.
Consultancy Services for preparation of DPR for Construction of Spur from Amas- Darbhanga Corridor of NH-119D to Bodhgaya Rajgir Vaishali and Darbhanga in the state of Bihar (2nd Call)
ENGAGEMENT CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED MASTER PLANNING, URBAN DESIGNING, ENGINEERING AND PREPARATION OF DETAILED PROJECT REPORT FOR INTEGRATED RE-DEVELOPMENT OF DARBHANGA AND BAPUDHAM MOTIHARI RAILWAY STATIONS OF SAMASTIPUR DIVISION, EAST CENTRAL RAILWAY
Consultancy Services for preparation of DPR for development of Northern part of Patna Ring Road from Bidupur Kalyanpur-Sarai-Astipur-ending at Nayagaon (Shittalpur bypass of NH-19) in the state of Bihar
Comprehensive Integrated Consultancy Services for : Preparation of Detailed Project Report (DPR) including external development works, surrounding roads/paths, Entrances, Gates, Parking, surrounding landscaping and preparation of detailed ... stability/ feasibility report (Copy ...
Engagement of Consultancy Services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering and Preparation of Detailed Project Report DPR for Integrated Re-Development of MUZAFFARPUR AND BEGUSARAI Railway Stations of E.C. Railway
Consultancy Services for Preparation of Feasibility study and DPR for Construction of 4laning of Masrakh to Chakia Km 86 to Km 143 of NH227A and Chakia to Bhitha more Km 0 to 104 of old NH104 NewNH227 of RamJanki Marg in the State of Bihar.
Consultancy for Feasibility study and DPR of 4 Laning from Km 0 Paswan Chowk to Km 58.450 Mushrigharari except Km 11.00 to Km 13.05 4Lane ROB Portion and Km30 to Km35 Proposed 2 Lane with PS Jandaha Bazar Bypass of existing section of NH322 in Bihar.
Engagement of Architect Cum Design Consultant for Surveying, Soil Investigation, Carrying out all related Design and drawing, Detailed Estimate, Preparation and Submission of Master Plan, Architectural Drawing, DPR with detailed BOQ
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Khagaria - Purnia Section of NH -31 (Total Length - 80 Km).
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Mokama - Munger Section of NH -80 (Total Length - 70 Km).
Preparation of DPR for New Alignment for 2lanes with PS configuration of stretch from km 95.200 near SSB Camp Ausani village to near UP Border on NH727 in the boundary zone of Valmiki wildlife Sanctuary along Gandak river bank in Bihar State
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Muzaffarpur - Sitamarhi - Sonbarsa Section of NH -77 (Total Length - 84 Km).
Comprehensive integrated consultancy services for : Preparation of Master plan & Detailed Project Report(DPR) including external development works, Roads, Entrances, Gates, parking, Maintenance workshop, Nursery and landscaping of entire campus with green buildings provision and GRIHA rating and preparation of conceptual Architectural drawings including services drawings for Internal Water Supply, External Water Supply, Sanitary Installation, Sewerage, Drainage, other E and M services, Internal and External Electrical Installation, HVAC, Firefighting, Lift. Interior designing etc, for Mahatma Gandhi Central University, Motihari (MGCU) located at Bankat, Fursatpur and Bairiya Motihari, Bihar.
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH 131 106 in the State of Bihar.
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Supaul Bypass on NH-327(E) in the State of Bihar
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Khagaria - Purnia Section of NH -31 (Total Length - 140 Km) 2nd Call.
Preparation of DPR for installation of Solar Power Plant at RTC Supaul
APPOINTMENT OF A CONSULTANT TO PREPARE A DETAIL FEASIBILITY REPORT (DFR) FOR ESTABLISHING AMMONIUM SULPHATE ALONG WITH SULPHURIC ACID MANUFACTURING PLANT AT THE AMMONIA / UREA FERTILIZER COMPLEX IN BARAUNI UNIT.
Preparation of DPR a.Const. of ROB in km55 of NH33 at Rly underpass Bridge No 69 Near Arwal More at Jehanabad b.Const. of ROB in km 200.650 of NH120 at Rly LC No 46B T Near Bikramganj c.Const of ROB in km 243.900 of NH120 at Rly Dumrown Near Dumrown
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race and canal on NH131 106 in the State of Bihar.
Consultancy Services for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shambo Village in Begusarai District in the state of Bihar.
Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package for Detailed Feasibility Study (FSR/FR) for Augmentation of Railway siding Infrastructure & Systems including Over Head Electrification and S&T for Bara..
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROBs at Km 43.961 and 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar.
Consultancy Services for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shambo Village in Begusarai District in the state of Bihar. (Total Length 22 Km)
Preparation of Detailed Project report for 4 laning from km. 25.00 (Bettiah) to km. 94.00 (Mangalpur) with Flyover at Station Chowk Bettiah in km. 25.600 of NH 727 for the year 2023_24 in the State of Bihar.)
Rendering services for Conducting Aerial Topographical Survey using DGPS based integrated Drone, traffic studies, calculation of EIRR & FIRR, preparation of revised L-section, preparation of DPR,ESP, SIP & GAD, soil exploration, preparation of report & bill of quantity and EPC tender documents and other ancillary works in connection with Sitamarhi-Jaynagar-Nirmali via Sursand New Line project under Samastipur Division of E.C.Railway.
DPR Pathu Barpa Road to Masir Bigha (Block Rafiganj)