Loading…
Loading…
11,292 results • Best match
Preparation of Detailed Project Report DPR for Widening and Strengthening of Plassey Betai Road MDR from 1.00 Kmp. to 9.00 Kmp. under Nadia Highway Division No.-I, P.W. Roads Directorate in the District Nadia during the year 2026-27
Repair of Boosting Station and Laying of DI Line in village Khanpur.
AS PER NIT
Preparation of Detailed Project Reportincluding survey, investigation, design, drawing, preparation of estimates and BOQ etc. complete work for Single village Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functio
AS PER NIT
CHARKHI DPR FOR AUGMENTATION OF WATER SUPPLY SCHEME OF VILLAGE CHARKHI BY RENOVATION OF EXISTING STRUCTURES CONSTRUCTION OF 1 B STATIONS LAYING THE DI PIPE LINES DISTRICT CHARKHI DADRI Estimate DNIT (UNDER CM ANNOUNCEMENT)
Preparation of preliminary project report (PPR) cum feasibility report of proposed township in Rampur. (Area 60 Hectare)
Consultancy Service to CMPDIL for preparation of Conceptual Note, MiningPlan and Feasibility Report of Talaipalli Coal Block
Empanelment of Consultant under category B for preparation of project report masterplan providing transaction advisory services and project management support for various tourism infrastructure projects in goa Cat A project value of less thanRs10cr
GENERAL - KIIFB - Masterplan Project MCH - OT Block - Demolishing of ward 16 17 18 19 24 25 BICU - Cable relocation - Phase - 1-Cable relocation from demolished building in Medical College Hospital, Thiruvananthapuram - General Electrical Work
Investigation Estimate for DPR Preparation Alignment Drawing for Keezhallur Panayathamparambu Road at Kuthuparamba Section in Kannur district Investigation Work
Hiring of Consultants - Milestone/Deliverable Based - Soil investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil investgation; DPR, RFP Preparation & Bid Process Management, Building and Construction; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - topo survey; DPR, RFP Preparation & Bid Process Management, Building and Construction; Yes; Onsite
Consultancy work for Preparation of DPR (Design, Drawing, BOQ) for Firefighting system in connection to the proposed Construction of G5 storied Hospital Building within the campus of Mahesh Bhttacharya Homoeopathic Medical College and Hospital
Appointment of Technical Consultant for comprehensive design and implementation services proposal preparation of DPR with details of qualitities of each item of work and preparation of detailed interior and exterior design electrical HVAC Plumbing
The Appointment Of Technical Consultant For Executing The Work Of Bio-Metric Survey, Preparation Of DPR, Plan Of Action And Project Management Consultancy Work For Housing For All Mission Under Prime Minister Awas Yojana.
Preparation of DPR including Soil Investigation and Determination of field data for Kuli-Moregram road from 24.45 Km to 36.45 Km under Kandi Highway Sub-Division under Murshidabad Highway Division No.II during 2022-23
Detailed Survey, Soil Investigation, Design, Drawing, preparation of land acquisition plan/proposal, Preparation of DPR of ROB construction work, Liosining with railway department and obtaining necessary approval, Vetting of final design from any IIT
The Appointment Of Technical Consultant For Executing The Work Of Bio-Metric Survey, Preparation Of DPR, Plan Of Action And Project Management Consultancy Work For Housing For All Mission Under Prime Minister Awas Yojana
Preparation of DPR for Augmentation of Indpur Piped Water Supply Scheme. Block- Bankura I, District- Bankura under Jal Jeevan Mission (JJM) Project of Bankura Sadar Sub - Division under Bankura Division, PHE Dte.(SM/18036)
Preparation of DPR for surveying, planning, designing, drawing etc. for the construction of RCC bridge over river Kumlai including approach road on both the sides at Demkujhora Thapa Busty under Mal Block, Dist. Jalpaiguri.
Preparation of DPR of works under RIDF XXX for Barrackpore I, Barrackpore II, Barasat I, Barasat II, Rajarhat, Amdanga, Bagdah, Bangaon, Gaighata, Deganaga, Habra I and Habra II Blocks under North 24 Parganas District
Engagement of Architectural- Engineering consultancy firms for Preparation of DPR (including Vetting) including Architectural, Structural and Electrical Design and Preparation of BOQ and Estimate of Amusement Park of Kalyani Lake Park at Kalyani, N
Appointment of Technical Consultant for Preparation of DPR with detail of quantities of each item of work (HSR based 2023/NS items) for Construction of Extension/Additional building in Community Centre Sec-65 Fbd.
Hiring of Consultancy Services - Percentage based - Subject Matter Experts, Consultancy for Preparation of DPR for Flood/River Protection Works at Lohit River, 25 BN ITBP, Tezu, Project Management, Engineering Design, Building and Construction; Yes;..
Selection of Consultant for the preparation of PFR/DPR
Conducting Reconnaissance & Detailed Survey at the Project Site taking L/s, C/s of River/ Stream/ Halla at 100 m intervals both on U/s and D/s side for a distance of 500 m. The index map showing the location and indicating the project site on a topo ... of DPR /DTS.
Conducting Reconnaissance & Detailed Survey at the Project Site taking L/s, C/s of River/ Stream/ Halla at 100 m intervals both on U/s and D/s side for a distance of 500 m. The index map showing the location and indicating the project site on a topo ... of DPR /DTS.
Conducting Reconnaissance & Detailed Survey at the Project Site taking L/s, C/s of River/ Stream/ Halla at 100 m intervals both on U/s and D/s side for a distance of 500 m. The index map showing the location and indicating the project site on a topo ... of DPR /DTS.
Conducting Reconnaissance & Detailed Survey at the Project Site taking L/s, C/s of River/ Stream/ Halla at 100 m intervals both on U/s and D/s side for a distance of 500 m. The index map showing the location and indicating the project site on a topo ... of DPR /DTS.
Selection of Consultant for Preparation of Feasibility Study Report for Introducing a Mass Rapid Transit System in Tiruchirappalli_Tirunelveli _Salem City
Integrated Infrastructural Development Works for laid-down Scheme Area at both side inclusive 45 M. Wide Master Plan Road of Villages Misrod, Jatkhedi, Bagli, Katara, Barrai under scheme No. 201/2020. (Sector -3, Barrai Area).
Consultancy Services for Sub-Scheme on Formulation of GIS based CDP / Master Plan for Class-II Seven towns with Population of 50,000 - 99,999 under AMRUT 2.0 under Three Packages in Odisha State Package-3
Consultancy Services for Sub-Scheme on Formulation of GIS based CDP / Master Plan for Class-II Seven towns with Population of 50,000 - 99,999 under AMRUT 2.0 under Three Packages in Odisha State, Package-1
Consultancy Services for Sub-Scheme on Formulation of GIS based CDP / Master Plan for Class-II Seven towns with Population of 50,000 - 99,999 under AMRUT 2.0 under Three Packages in Odisha State Package-2
Patch work for master plan road Bag Seveniya Gate No 04, to saket nagar Via pipliya pende khan Along the boundary of AIIMS Bhopal. and Roads under Construction Sub Div. No. 03, Bhopal.
Survey mapping, DGPS survey, zonal plan/master plan overlay, cadastral map overlay, Google Earth overlay, and RERA registration related work for developing new residential and commercial projects in the Bundi Municipal Council area.
CONSTRUCTION OF FOOTPATH ON V5 ROAD SECTOR 51,CHANDIGARH AS PER CHANDIGARH MASTER PLAN 2031 and REPAIR OF EXISTING FOOTPATH, KERB CHANNEL AND UPLIFTING OF CHANNEL OF V-4 ROAD, SECTOR 51, CHD
Formulation of Rehabilitation and Resettlement Master Plan at proposed site situated at Listrabad Grant and Rainapur Grant Pargana Paravadun Tehsil Rishikesh Distt Dehradun for Project affected Families of Song Dam Drinking Water Project
CONSTRUCTION OF FOOTPATH ON V5 ROAD SECTOR 51,CHANDIGARH AS PER CHANDIGARH MASTER PLAN 2031 and REPAIR OF EXISTING FOOTPATH, KERB CHANNEL AND UPLIFTING OF CHANNEL OF V-4 ROAD, SECTOR 51, CHD
Selection of Principal Project Consultant comprising of well experienced team of renowned Architects Exhibition Designer and Archaeologist for preparing Master Plan and requisite Design Engineering Documents for inviting EPC Tender and Expert Superv
Supply and delivery of 90W LED Street Lighting fixtures to central divider lighting to 100 wide new Master Plan road from NH-16 Road to Rushikonda Layout Phase-II via Panorama Hills Visakhapatnam
PROVIDING OF 33 KV DEDICATED FEEDER TO 33/11 KV MADHAPUR SS FROM 132/33 KV JUBILEE HILLS SS UNDER T & D IMPROVEMENT WORKS, IN SUB-DIVISION-IV, MASTER PLAN-I, HYDERABAD CIRCLE.
Engage of (1)no JCB for dismantel works for democration road from 15'-00 to 40'-00 wide master plan road widening from newmarket to nawabpet(TS 357370) Under GENERAL FUNDS 2017-18
Jungle cleance, fixing of RCC Poles and Refilling of formation of master plan roads at 1) Hero Show room in Renigunta Raod from LC No. 107 to LC No. 108 (100 feet Road).
Rampur Development Authority is inviting request for proposal Request For Proposal (RFP) from date 04.02.2025 for formulation of GIS based Master Plan for newly added 39 villages in Rampur Development Authority (RDA) Area.
Request for Proposals for the Work of Formulation of GIS based Master Plan and Property Mapping for improving tax collection in 3 three towns namely Ambassa Amarpur and Sabroom in Tripura 2ND Call
Execution of Projects related to Making Auroville city as per the chartered & Gazetted Master Plan and the Original vision at Puducherry. SH: Providing LED lighting for visitors parking area at Auroville, Tamil Nadu.