Loading…
Loading…
11,292 results • Best match
Supply, Installation, Testing and Commissioning of 12.0 Mtr High Mast Lighting Systems complete with 200W LED Flood Light Luminaires at 8nos of Islands / Junctions at Master plan roads within the jurisdiction of VMRDA
Supply and delivery of 90W LED Street Lighting fixtures to central divider lighting to 100 wide new Master Plan road from NH-16 Road to Rushikonda Layout Phase-II via Panorama Hills Visakhapatnam
Jungle cleance, fixing of RCC Poles and Refilling of formation of master plan roads at 1) Hero Show room in Renigunta Raod from LC No. 107 to LC No. 108 (100 feet Road).
Shifting of existing33KV/11KV Lines in favour of The CME Port Trust Complex, due to as per GVMC master plan 2041, in Akkayyapalem section of Dondaparthy Sub-division in Zone-I Division, Visakhapatnam
REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR SUB SCHEME ON FORMULATION OF GIS BASED MASTER PLAN CLASS II TOWNS WITH POPULATION OF 50,000 to 99,999 UNDER AMRUT 2 FOR KUPPAM MUNICIPALITY In AP
BT Road for 60' wide Master Plan Road From Jagannatha Puram Jn" in Gollalapalem(V) To NH 16 in IRUWADA (V), (Length of the proposed road: 2.125 KM ). (Phase-2 Two lane road )
Tender Inviting for Designing, Structural Drawing and Preparing for DPR in New Construct for Bus stand in Alangulam town panchayat
Preparation of Detailed Project Report including Survey, Soil, Design for Construction of Fishing Harbour at Namkhana, South 24 Parganas.
Preparation and submission of Revised Detailed Project Report for Retrofitting to accommodate FHTC under JJM in CHATA PADAMPUR PWSS
Survey, Investigation and Detailed Gugul Gravity Diversion Scheme and Detailed Project Report for Charanwadi (Gugul) Tal. Dindori, Dist. Nashik
Consultancy Services for Preparation of Detailed Project Report for Vindhya Kshetra Multi Village Schemes Distt Rewa Sidhi and Satna
SADALPUR Raw Water Pumping station DETAILED PROJECT REPORT FOR AUGMENTATION OF WATER SUPPLY SCHEME OF VILLAGE SADALPUR DISTRICT HISAR
Kalayat Town Detailed project report for construction of effluent pumping station alongwith rising main for carrying treated effluent from
Consultancy services for preparing DPR for Revival CompletionConstruction of Lamochan Youlboo Irrigation Canal.
Engagement of Consultant for Prepration of DPR for new project re- examination existing DPR, Review of existing drawing and design and supervision AND construction management of various allotted works at Singrauli Development authority
Refer to BOQ
Preparation of Detailed Project Report (DPR) for the work of Panskura Durgachak Road (SH4) from Ch. 29.90 Km to 66.70 Km Widening and Strengthening for 2 lane with paved shoulder under Tamluk Highway Division, P.W. (Roads) Dte in the district of
Preparation of Detailed Project Report (DPR) of the New Generation Watershed Development Project under Bankura WDC2.0/03/21- 22 within 52no Mouza of Dhaban,Jirrah,Jhunjka, Susunia,Chhatna-I,Chhatna-II GP under Chhatna Block in the district of Bankura
Preparation of Detailed Project Report (DPR) for Diversion of State Highway No. 9 (Bankura-Durgapur Road) From KM 35.740 To KM 38.540 stretching about 2.8 km within the Mine Boundary of Trans Damodar Coal Mine vested to the Durgapur Projects Ltd.
Pavement condition Survey (FWD)and Preparation of Detailed Project Report (DPR) for Strengthening of Nanoor Basapara Road from 0.00 to 16.500 km, under Birbhum Highway Division No-II, in the district of Birbhum in the year 2026-2027. (2nd Call)
Preparation of Detailed Project Report DPR with necessary allied work for the work of Damdim Bazar to Guabari road via Baintgoorie Tea Garden Factory MDR from 0.00 Kmp to 8.50 Kmp Strengthening Work under Mal Sub Division of Jalpaiguri Division
Traffic survey, topographical survey, Pavement condition Survey(FWD)and Preparation of Detailed Project Report (DPR) for Suri Rajnagar Road (SH-6), Strengthening work from 0.0 to 4.0 km and Widening, Strengthening work from 4.0 to 9.0 km and 14.0 to
Preparation of Detailed Project Report DPR for the work Strengthening of Saptagram Tribeni Kalna Katawa Road S.T.K.K. SH-6 from 0.460 kmp to 1.833 kmp and 3.415 kmp to 33.880 kmp, provisions of drain and ICPB, slope Pitching at requi
Preparation of Detailed Project Report DPR for Strengthening of Badkulla to Kulgachi Road via chittasali MDR from 0.00 Kmp. to 4.00 Kmp. under Nadia Highway Division No.-I, P.W. Roads Directorate in the District Nadia during the year 2026-27.
DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT MUNAK DPR FOR AUGMENTATION OF W/S SCHEME MUNAK BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE MUNAK DISTRICT KARNAL UNDER SWARAN JAYANTI MAH
Integrated Infrastructural Development Works for laid-down Scheme Area at both side inclusive 45 M. Wide Master Plan Road of Villages Misrod, Jatkhedi, Bagli, Katara, Barrai under scheme No. 201/2020. (Sector -2, Bagli and KataraArea)
SLTF Investigation And DPR preparation work
Preparation of DPR for the work of Construction of Road over bridge at KM 4/2 Of Thittai-Dharasuram Road (MDR 720) AT Railway Km 344/800-900 in between Thittai and Papanasam Railway stations.
Preparation of DPR consisting of Detailed Design and Project Management works of modification and renovation of SANSKRITI LOKOMANCHA (having 1400 capacity Auditorium and 125 capacity Movie Hall) at Burdwan under Bardhaman Zilla Parishad, WB_2nd Call.
Construction of Foot Over Bridge at Paltan Bazar, near ASTC campus, G.S. Road, Guwahati under SOPD (G) for the year 2021-22 (Consultancy service for preparation of DPR, submission of detail drawing and Design etc )
Construction of Foot Over Bridge at Fancy Bazar, M.G. Road near SS Road Guwahati under SOPD (G) for the year 2021-22 (Consultancy service for preparation of DPR, submission of detail drawing and Design etc )
Design of distribution network, detailed household survey, foundation design of zonal ohrs alongwith preparation of DPR etc. for proposed surface water based piped water supply scheme for Pingla, Panskura-I blocks District-Paschim , Purba Medinipur.
Preparation of DPR for firefighting system with arrangement network at existing G_1 storied OPD and Administrative building G_2 storied Main building G_1 storied Emergency building, Single Storied child OPD building and G_1 storied Matrimangal build
Consultancy work for preparation of DPR for installation of Fire Hydrant and Fire Sprinkler system including supervision at different buildings of Siliguri District Hospital in the district of Darjeeling under North Bengal Construction Division, PWD
Construction of boundary wall & Entry Gate and other associated work i.e. Soil Testing, Topographically Survey, Preparation of architectural and structural drawings, Vetting of Drawings from IIT/NIT, Preparation of DPR etc. at Tanda, Hoshiarpur, Punjab.
Hiring of Consultants - Milestone/Deliverable Based - Soil investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, Soil investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, Soil Investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, Soil Investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation: DPR, RFP preparation & bid process management; Building and Construction, Soil Investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - soil investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, soil investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, Soil Investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, soil investigation; Yes; Onsite
Hiring of Consultants - Milestone/Deliverable Based - soil investigation; DPR, RFP Preparation & Bid Process Management, Building and Construction, soil investigation; Yes; Onsite
Data Collection and Associated Survey Work for DPR of Various HSR Corridors (Approx. 2365 kms long)
Feasibility study and detailed project report for elimination of Level Crossings with Road Over Bridge at L-xing No. NJ/25(Km29/3-4) (NCBD-JDGP) & NN/104 (Km.164/5-6, SMTA-KAMG), NN/110 (Km.173/3-4, JOQ-SRPB) & SK/141 (Km.134/0- 1, HAS-KCF), SK/162 (Km.93/1-2, CRX-BNQ), SK/196(Km39/5-6, SVQ-BRQ), AB/1(Km.2/6-7, APDJ-APD), AB/3(Km.4/9-5/0, APDC-APD), AB/13(Km.14/1-2, APD- BSW), AB/22(Km.26/1-2, NCB-COB) AB/26(A) Km.30/0-1,COB-DWT), AB/32(Km.37/5-6,DWT-VTG)and L-xing No. AB/47(Km.49/5-6, VTG-DHH), (Total 13 Nos.) under the jurisdiction of ADEN/II/NCB, ADEN/East/APDJ, ADEN/West/APDJ, ADEN/MBZ & ADEN/HQ/APDJ of APDJ Division.
SELECTION OF CONSULTANT FOR PREPARATION OF MASTER PLAN, PROVIDING DESIGN CUM PROJECT MANAGEMENT CONSULTANCY SERVICES FOR THE RESETTLEMENT SITES OF PROJECT-AFFECTED FAMILIES FOR THE DEVELOPMENT OF THE CHENNAI GREENFIELD AIRPORT AT PARANDUR
Strenghtening of civil structure , raising of central verge, hard shoulder, surface drain etc., and painting work various Master Plan Road under construction Sub dn. No.09 cap.dn.no.02, Capital Project circle M.P. PWD., Bhopal
Construction of surface drain, central verge, face wall and other Misc work for Master Plan road D.K.Cottage and Danapani Danish bridge to Indus upto appolo hospital under Constn Sub Divn No.3, CPA, Bhopal
Allotment of Plot No.78 with existing construction (Commercial) Use (Area Based Development Plan of North and South TT Nagar) under Bhopal Smart City Mission dated 15.06.2018 Master Plan) on Joint venture/Joint Development
PROVIDING OF ALTERNATE SOURCE TO NANAKRAMGUDA SWITCHING STATION FROM 132/33 KV DONTHANPALLY EHT SS WITH 100 SQ MM AAA CONDUCTOR" IN ECGH DIVISION OF MASTER PLAN/RANGAREDDY CIRCLE UNDER T&D IMPROVEMENT WORKS