Loading…
Loading…
418 results • Best match
Construction of 6 lane two way Flyover in the direction of Kondapur side towards ORR at second level at Gachibowli Junction and formation of 120' wide road from Shilpa Layout, Gachibowli via Gas Company to Gachibowli Junction including construction ... per master plan under ...
POWER EVACUATION FACILITATES FROM UPCOMING EHT SUB-STATION (132/33KV) MANIKONDA, ERECTION OF 1NO 33KV FEEDER WITH 400SQ.MM XLPE UG CABLE (2 RUNS) FOR 33/11KV SS LANCO HILLS (FOR DISTANCE OF 1.325KM) PERTAINS TO OPERATION GACHIBOWLI DIVISION IN ... IN MASTER PLAN WCGH ...
Providing of electrical points, power points, ceiling fans, and LED well glass fittings in newly constructed/ Extension of Poultry Shed at New Campus at DPR, Rajendranagar, Hyderabad.
Whole Genome Sequencing of Duck
FKM Tight Joint for DPR CHP BP1, FKM Tight Joint for DPR CHP BP2, FKM Tight Joint for DPR CHP BP3, FKM Tight Joint for DPR VIZAG BP, FKM Tight Joint for DPR VIJ BP
CONSULTANCY SERVICE FOR PREPARATION OF CPR AND DPR INCLUDING ARCH AND STRUCTURAL DRAWINGS, MEP, COSTED SCHEDULE, TENDER DOCUMENTS FOR RE-LOCATION OF CAW AT AF STN HAKIMPET
Preparation of Bridge DPR for Construction of HLB across local stream at km 4/850 & at km 5/340 of Dimda to Chittam road in Kumrambheem Asifabad Dist.
EVACUATION OF 33KV IBRAHIMBAGH FEEDER & 33KV KISMATHPUR (REV) FEEDER WITH 33KV 400SQ.MM XLPE UG CABLE FOR 33/11KV IBRAHIMBAGH SS & 33/11KV KISMATHPURA SS RESPECTIVELY FROM UPCOMING 132/33 KV MANIKONDA SUB-STATION PERTAINS TO OPERATION IBRAHIMBAGH ... IN MASTER PLAN ECGH ...
Improvements of Radial Road No.7 Extn i.e., Edulanagulapally to Kondakal Road from Km.0/0 to 5/7 (LHS) and from Km.0/0 to 2/3(RHS) and from Kondakal to Mokhila Village (Master Plan Road) from Km. 5/7 to 10/2 in Hyderabad. SUB WORK: Reconstruction of ZPH School Building at Kondakal Village.
Construction of Committee Hall (200 persons) at DPR, Rajendranagar, Hyderabad, Telangana. SH: Balance work such as brick work, flooring, finishing, water supply, sanitary installations and internal electrical installations etc.
Repair, renovation and upgradation of 2 nos. Type-IV quarters, providing new light point including laying of cable in parking shed at Old Campus, DPR, Rajendranagar, Hyderabad (Civil & Electrical).
PROVIDING OF 33KV OTHER SOURCE TO 33/11 KV PRASHASAN NAGAR SS BY LAYING OF 3*400SQMM XLPE UG CABLE FROM 132/33KV JUBILEE HILLS SS TO 33/11 KV PRASHASAN NAGAR SS BY INTER LINKING ON 33 KV HUSSAIN SAGAR FEEDER AT 132/33KV JUBILEE HILLS SS IN ... SUBDIVISION-IV, MASTERPLAN -I, ...
Restoration for proposed road cutting done by the TGSPDCL for laying of 33/11KV lines from Westin Hotel, Raheja mind space gate building no.9 gate to Gowra Fountain head building and to Ankapur village hotel, opp to Durgam cheruvu GHMC Park, Raheja ... to Master plan SD-IV ...
Providing entrance gate and strengthening of compound wall from main road (approx. 270 meters) & construction of damaged compound wall (20 m) at rear side of the New Campus, DPR, Rajendranagar, Hyderabad.
Microprocessor based Numerical Integrated Feeder Protection Module comprising DPR, OCR, WPC, PTFF & Auto Reclosure Relay for 25 kV AC Single phase 50 Hz Traction Substation per RDSO Specn. No: TI/SPC
Supply of Micro Processor Based Numerical Integrated Feeder Protection Module Comprising DPR, OCR, WPC,PTFE & Auto Reclosure Relay for 25KV AC Single Phase 50HZ Traction Substation as per RDSO Spec. N
Providing of 4th alternate source to 33/11kV Asifnagar SS from 132KV Seetarambagh SS by laying of 2.37KM of 3X400Sq.mm. XLPE UG Cable (Single Run) from the EHT SS and extending upt the now proposed 4-pole structure at near Gowtham Model School duly ... by Master plan SD-VI ... Hyderabad Master plan Circle ...
Pre Survey and DPR preparation work to 1 Improvements to PWD Road to Bomraspet Road from Km 0/0 to 2/0 from 2 Lane to 4 Lane in Vikarabad District Package
Providing of 33KV dedicated feeder to 33/11KV Thorrur SS from 132/33kV EHT Thurkayamjal SS in Ibrahimpatnam Division of Saroornagar Circle and work executed by the Master plan wing ECGH Sub-Division -1 of Master plan RR Circle under T and D Improvement to original works (Summer Action Plan-2026)
Improvements to Duddeda-Mundrai Road from Km 6/600-9/700 in Siddipet District. Sub-Work:Preparation of DPR for improveements to Duddeda-Mundrai Road from Km 6/600-9/700 in Siddipet District.
Restoration for proposed road cutting done by the TGSPDCL for laying of 33/11KV lines from Westin Hotel, Raheja mind space gate building no.9 gate to Gowra Fountain head building and to Ankapur village hotel, opp to Durgam cheruvu GHMC Park, Raheja ... to Master plan SD-IV ...
SHIFTING OF 7NOS RMUS, 4 NOS DTRS, 2 NOS 33KV FEEDERS, 1 NO. 11KV FEEDER(DOUBLE RUN UG CABLE) FROM 33/11KV SS BAIRAMALGUDA NEAR BAIRAMALGUDA JUNCTION TO SV COLONY KAMAN (BESIDE KALYANI MOTORS MARUTHI TRUE VALUE SHOWROOM) TO THE BOUNDARY OF THE ROAD ... IN MASTER PLAN /RANGAREDDY ...
Power evacuation facilities of 2nos. 33kV feeders from EHT Bowrampet Sub-Station to Pragathinagar Khamaan with M+9 towers DC line with 100Sqmm AAAC for tapping to existing 33/11kV Bachupally SS and for tapping to existing 33/11kV HMT hills SS and ... in Masterplan Sub-division-2 ...
ERECTION, TESTING AND COMMISSIONING OF 33/11KV INDOOR SUB STATION WITH 2X 8MVA PTRS ALONG WITH CONSTRUCTION OF CONTROL ROOM, COMPOUND WALL ALONG WITH MS GATE AND BOREWELL, CABLE TRENCHES, POWER TRANSFORMER PLINTHS, TOILET BLOCK, ELECTRIFICATION, ... IN MASTERPLAN ,
Micro processor based numerical integrated feeder protection module comprising DPR,OCR,WPC,PTFF, and auto recloser relay for 25kv AC single phase 50Hz TSS/SP/SSP as per RDSO spec no TI/SPC/PROTCT/5070
Pre Survey and DPR preparation work to 1 Improvements to existing 2 Lane with paved shoulders on Tunkimetla -Narayanpet Road from Km 11/0-19/2 23/0-43/4 4 5/0-65/2 Pacakge
Laying of CC Road from plot no: 17-1-380/96 to opposite dpr clinic( is sadana x road ) ,in DS nagar road in 38-IS Sadan, Santosh Nagar, Circle-7 CRZ GHMC Rs. 7.44 Lakhs
Project Management Consultancy Services for Proof Checking, Construction Supervision, Quality Assurance , Quality Control and Quality Audit for the work of "Construction of 6 lane two way Flyover in the direction of Kondapur side towards ORR at ... per master plan under ...
Preperation of DPR for Construction of By Pass Road from km 0/0 to 8/8 connecting Wanaparthy - Atmakur road (at km 4/6-80 and Wanaparthy - Kollapur road (at km 5/2-4) in Wanaparthy District
Consultancy Services for Preparation of detailed project report and Survey for Designs, drawings, structural details, estimate and site inspection, SBC Calculation for the work of Construction of High-Level Bridge across Stream at Sardar Nagar to Raviryala in Thukkuguda Municipality in Thukkuguda Ward-66 Shamshabad Circle-18 GHMC
Project Management Consultancy Services for Preparation of Detailed Project Report, Pre-Construction Activity and Project Supervision for Construction of Major bridge for the service road on either sides of ORR and Formation of new Service road from ORR Exit No.18A interchange upto Narsingi Ring along Musi River
POWER EVACUATION FACILITATES FROM UPCOMING EHT SUB-STATION (132/33KV) GANDI MAISAMMA, ERECTION OF 5NOS FOLLOWING 33KV FEEDERS (I)DP PALLY SS-II, (II)BAHADURPALLY, (III)AFA-I, (IV)AFA-II & (V)SATYAM-1 FEEDERS USING 100SQ.MM AAA CONDUCTOR OVER M+ TYPE ... IN MASTER PLAN SD-1 ...
Improvement to Radial Road N.7 Extn i.e from Edulanagulapally to Kondakal Road from Km 0.0 to Km 5.7 LHS and from Km 0.0 to Km 2.3 RHS and from Kondakal to Mokhila Village Master Plan Road from Km 5.7 to Km 10.2 in Hyderabad Conducting Survey Investigation designs and drawings of road and structures from Km 5.700 to Km 10.200 on LHS and from Km 0.0 to Km 2.3 on RHS road.(2nd Call)
Shifting of 33kV, 11kV and LT UG Cables and OH Lines from Ali Cafe, Amberpet to Spice Restaurant, Moosarambagh by laying of 33kV 3X400Sq.mm XLPE UG cable, 11kV 3X300Sq.mm XLPE UG cable on temporary basis as per the request of Executive Engineer, PD ... in Master Plan Sub ...
Re-Construction of Minor Bridge at Km 11/6-8 on Majeedpally-Thunkibollaram Road in Siddipet District. Sub-Work:Preparation of DPR for Re-Construction of Minor Bridge at Km 11/6-8 on Majeedpally-Thunkibollaram Road in Siddipet District.
Consultancy services for rectification measures on Mahadevpur to Bhupalapally Section 2LPS of NH 353C from Km 25.0 to 59.2 Design Ch. Km.25.467 to 59.200 and DPR for Parkal Bypass, Bhupalapally Bypass on Sironcha Atmakur Section of NH 353C
Consultancy Services for DPR of 1. Widening to 2L PS of balance reaches from Km 184.840 to190.00,194.840 to198.800 of NH-63 2. Construction of additional vent to existing Major Bridge at Km 210.0-2 of NH-63 in Telangana 4th Call
Estimate for Consultancy Services for the Detailed Survey and Investigation of DPR for the proposed Barrage at Thummidihetti V Kowtala M Kumram Bheem Asifabad District and for the Gravity Canal and Tunnel from Km 71 500 to linking the Sundilla Barrage
Preparation of Detailed Project report for the roads Paidigudem to CRPF camp from 0/0 to 3/2, Kothuru to Pedda Arlagadda, via Pedda Amalapuram upto CG border from Km 0/0-6/0, Peddnallaballi to Sugunapuram from 0/0-10/0, Chinanallaballi to Jinnelagudem road Km 0/0 to 6/0, Paidagudem to Kothuru from Km 0/0 to 9/0, Kurnapalli to Nemaliguda up to CG border from Km 0/0 to 3/0, Bathenappalli to Kurnapalli from 0/0 to 6/0, Bodanepalli to Dokupadu upto CG border from Km 0/0 to 4/0, Mulakanapalli to Arlapenta upto CG border from 0/0- 4/0 and Pusuguppa to Chattisgarh border from Km.0/0-4/0 in Bhadradri Kothagudem District.
Consultancy Services for Preparation of detailed project report which includes hydrological study, hydraulic Design, LS and alignment drawings (Topographical survey), structural design details, and estimate for the work of Construction of RCC box drain from Chaitanyapuri Culvert on NH-65 to Shivaganga Theatre Culvert in Ward No.32, Gaddiannaram of Saroornagar Circle -12 GHMC (Recall)
Consultancy services for Survey, Investigation and preparation of designs and drawings and detailed estimates along with DPR and tender document for Construction of ROBs and RUBs including Approaches, Service Roads, Storm Water Drains along Foothpath, Median, Kerd, Street Light Works for seven (7) locations.
Sub work for Conducting Pre-Survey and DPR preparation work Widening and Strengthening from Single Lane to Double Lane carriageway of Tatpally linking Singitam to Kodur road ( Km 0/0 to 9/4) to Makthakesaram road (Km 0/0 to 10/5) in Sangareddy District
Consultancy services for Survey, Investigation and preparation of designs including architectural designs & drawings and detailed estimates along with DPR and tender document for Construction of High Level Bridges including Approaches, Service Roads, Drains and ducts along Footpath, Median, Kerb, Street Light Works for four (4) locations
Construction of Phase -I of permanent campus of Sammakka Sarakka Central Tribal University (SSCTU) Mulugu Telangana. SH:- Providing comprehensive consultancy services for the work involving preparation of master plan for 287.14 acres land detailed architectural drawings structural drawings mechanical electrical and plumbing drawings interior design and drawings landscaping BIM modelling for works under Phase-I obtaining all required local body and statutory approvals of the works under Phase -I SSCTU Mulugu and also periodic supervison during execution stage of work till completion of works.
PROVIDING ELECTRICAL AND PLUMBING WORK IN THE OLD AND NEW CAMPUS OF DPR.
Consultancy services for Survey, Investigation and preparation of designs & drawings and detailed estimates along with DPR and tender document for Construction of ROBs and RUBs including Approaches, Service Roads, Storm Water Drains along Footpath, Medins and ducts along Footpath, Median, Kerb, Street Light Works for four (4) locations
Erection of new 33/11 kV indoor SS with 2x8 MVA Power Transformers, 1 Nos. 33/11 kV indoor switchgear with 8 Nos. feeders, 33 kV &11 kV lines along with the control room at Janachaitanya Housing Society (P) Ltd.,Sy.No.92(P), 94 (P), 95 (P), 101 (P), ... under Master Plan SD-1 ...
Laying of CC Road from Bhupalpally Main Road to Sri Kolluguri VenkatRao H.No. 9-12/1 & from Sri Kokkirala Aravind H.No. 9-10/2 to Open Plot of Jangili Rajamouli , New DPR Function Hall, Ward No.3, Parkal Nagarapanchayath (RESERVED FOR SC AND ST'S INDIVIDUALS AND WADDERA LABOUR CO-OPERATIVE SOCITIES
Consultancy Services for identifying the inlet origin of drain detailed survey and preparation of detailed Engineering drawings Plans Investigation Report Project Preparatory Report(PPR) DPR and tender documents for the work of Taking up permanent measures to avoid inundation of Nampally Railway Station Yard by Diverting and Constructing SW Drain
Consultancy Services for Detailed Survey and Preparation of Detailed Drawings Plans Investigation Report Project Preparatory Report (PPR) DPR and Tender documents for the work of Widening of Storm Water Drain from (1) Kajani Medical Hall Nampally Station Road to Netaji Nagar X Roads (2) MLA Quarters to Basheerbagh Main Road Adarsh Nagar