Loading…
Loading…
72 live36 closing this weekmost from SUNDARBAN AFFAIRS DEPARTMENT and KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
72 results • Best match
Detailed Project Report in connection with Construction of 30 m. length of Concrete Bridge connecting Nataberia of Nalua G.P. to Nalpukur
MISCELLANEOUS WORKS
Preparation of detailed project report for Bishnupur Sonamukhi Rangamati Road from Ch 8.00 km to Ch 28.00 km, Widening and Strengthening work under Bankura Highway Division in the district of Bankura.
Structural evaluation, widening and strengthening of flexible road pavements using Falling Weight Deflectometer (FWD), Technique for preparation of Detailed Project Report of Kashemnagar-Natunhat-Srikhanda Road (MDR) from 0.00 Km to 28.50 Km.........
Structural evaluation, widening and strengthening of flexible road pavements using Falling Weight Deflectometer (FWD), Technique for preparation of Detailed Project Report of Ramjibanpur-Ketugram-Katwa (RKK) Road (SH-6) from 76.00 Km to 102.00 Km....
Preparation of detailed project report for Khatra Ranibandh Road, from 0.000 kmp to 7.400 km SH-4 widening an strengthening excluding Kechendaghat bridge portation and strengthening from 7.400 km to 15.300 km MDR in the district of Bankura
PREPARATION OF A DPR INCLUDING ARCHITECTURAL DESIGN OF A DIGITAL EXPERIENCE CENTRE, LIGHT and SOUND SHOW, AN EXPERIENCE CENTRE ALONG DEVELOPMENT OF ALLIED INFRASTRUCTURE WITH PROJECT MANAGEMENT SERVICES FOR THE BIRTHPLACE OF SHAHID KHUDIRAM BOSE
Preparation of Master Plan, Detailed Layout Plan, Detailed Architectural Design, Urban Design Guidelines, ... for College Street and College Square area including the adjoining books streets under Kolkata Municipal Corporation, West Bengal (2nd call)
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Konnagar Hooghly District
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Chandannagar, Hooghly District
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bansberia, Hooghly District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bhadreswar , Hooghly District.
Preparation of detail project report (DPR) with architectural drawings and structural drawing and detailing (Reinforcement detailing) inconsideration with demolition of the existing hostel building and construction of the new hostel building.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Uttarpara Kotrang, Hooghly District
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Halisahar, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP oror new proposed STP site for treatment at Baranagar, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Titagarh , North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Garulia, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Naihati, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Kamarhati, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bhatpara, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Panihati , North 24 Parganas District.