Loading…
Loading…
7,299 live4,053 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,299 results • Best match
Modernization of various Link Roads Compaction of earth work Preparation of Sub Grade to premix carpet including const of culverts drain providing fixing of roads structure road safety measure in MC Killianwali Malout G No 1 Work Code 26-060.
Modernization of various Link Roads Compaction of earth work Preparation of Sub Grade to premix carpet including const of culverts drain providing fixing of roads structure road safety measure in MC Killianwali Malout G No 2 work code 26-061
Fitting Fixing Openable Gril Frame Structure over Drain from (i) Infront of Dharam tola (L-24.200m) (ii) infront of Joka sakho club (L-51.500m) (iii) infront of Biloda Chanachur Factory (L-13.800m) in ward no-22,Kalikapur Under Bolpur Municipality
Construction of Soak Pit (2.0 nos) and Drain for receiving of IEP backwash water and OHR overflow water of Ranghat Piped Water Supply Scheme at Chanchal-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. (2nd Call)
Construction of CC Road cum one side drain from Pathuru-03 sachivalayam to Sai Samskruthi apartment and Culvert at Chilakala Veeranjaneulu house (D.No.3-6-32/3) in Rice mill bazar in 31st ward of Narasaraopet Municipality. Short tender - 1st call.
Request For Proposal (RFP) “Selection of Agency for Undertaking GIS and GPS-Based Road Sweeping, Public Place Cleaning, Drain Cleaning, Transportation of Sanitation Waste and Integrated Sanitation Services in North Cluster of Raipur Municipal Corporation for next 5 years, extendable thereafter”
Request For Proposal (RFP) “Selection of Agency for Undertaking GIS and GPS-Based Road Sweeping, Public Place Cleaning, Drain Cleaning, Transportation of Sanitation Waste and Integrated Sanitation Services in RURAL Cluster of Raipur Municipal Corporation for next 5 years, extendable thereafter”
Request For Proposal (RFP) “Selection of Agency for Undertaking GIS and GPS-Based Road Sweeping, Public Place Cleaning, Drain Cleaning, Transportation of Sanitation Waste and Integrated Sanitation Services in WEST Cluster of Raipur Municipal Corporation for next 5 years, extendable thereafter”
Request For Proposal (RFP) “Selection of Agency for Undertaking GIS and GPS-Based Road Sweeping, Public Place Cleaning, Drain Cleaning, Transportation of Sanitation Waste and Integrated Sanitation Services in SOUTH Cluster of Raipur Municipal Corporation for next 5 years, extendable thereafter”
Construction of concrete road and massonary box drain at Gobinda nagar from Purbasha Youbak Sangha to h/o. Swapan Sikder via h/o. Mamal Mallick, h/o. Dinesh Yadav ---- under ward no. 22 Within BMC. (Fund- U.D. and M.A Fund)
Development and upgradation of cover Drain from 36 no Ward office to Arabindra Club (Baghaban Mudi Shop Side), Shiv Durga Sporting Club to Rani Bhawan (Both Side) at Nowbhanga , ---- within Ward no- 36 under BMC. (Fund- U.D. and M.A Fund)
Repairing of road stretches near Central Bus Stand including repairing of drain and maintenance of road shoulder and flank in between 0.00 Km to 1.30 Km of NL Khan Link Road under Midnapur Division, PWD in the District of Paschim Midnapur.
Remodeling of SW drain from H.No13-1-1234/22/A/6,13-1-1234/22/A/7 to 13-1-1234/22/8/A at Sarvar nagar in 64-DAttatreya nagar,under div 14, KZ, GHMC. (Rs. 6.40 Lakhs) (2nd Recall)
Construction of concrete road and massonary box drain at Rabindrapally Kamal Park from BC-93 to BD-159 via BD-167/1, BD-19 with link BC-85 under ward no. 24 Within Bidhannagar Municipal Corporation. (Fund- U.D. and M.A Fund)
Old GT Rd (Budbud),0kmp (Durgapur End) to 3.58km (Bardhaman End) for the work of Widening (Carriageway 7m to 10m) and Strengthening including recon. of culverts, protective work and drain in the Dist. of Paschim Bardhaman, under Asansol Hwy Divn PWRD
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5230G (TMD-II) IN- SITU repairing overhauling of High energy drain valve and other Low-Medium-High pressure and temperature Valves Installed In Unit No-3 to 6 (TMD) of..
Supply Steel body wood wool pads Evapor [ Supply Steel body wood wool pads Evaporative Desert Cooler Normal Air delivery - 3000 cubic per hours power consumption - 250W, Tank Capacity - 60 Ltr. Drain Plug, sheet thinness 0.8mm, Sump Tank Thickness 1.0mm. Fan speed 3 steps. type of blade plastic (HIP) Floor standing without caster wheels, Filter pad wood wool pads, Min length of ISI Connecting cable with 3 pin modular . plug top 5/6 Amp 2.5 mtr. Weight 17 kg , Operating Volt 240 volt AC, 50 Hz, warranty One year, Size 802x863x685 mm. Make Crompton, Symphony, Champion, Havells and similar]
Part A)-Guna-Gwalior section- Rehabilitation and improvement of bridges condition by repairing of RCC Slabs Pier/Abutments/Toe wall/wing wall/Return wall, inspection steps, flooring and bank pitching (Total 18 bridges) Bridges no 1098/2, 1101/1, ... Cross drain , ...
All as per BOQ
REMODELLING AND LINING OF MAIN CANAL RD-7050 M TO RD-8150 M, KUNJARA MINOR RD 0 M TO 2240 M AND KUNJARA SUB MINOR RD 0 M TO 990 M WITH REPAIR OF 55 NOS., CANAL STRUCTURES (2 NOS. HEAD SLUICE, 2 NOS. DRAINAGE CULVERT, 1 NO. SUPER PASSAGE, 1 NO. CLOSED DUCT, 7 NOS. FALLS, 41 NOS. FIXING OUTLETS,) AND CONSTRUCTION OF 2 NO. HUME PIPE VRB, OF KHAMHARPAKUT TANK SCHEME, BLOCK-LAILUNGA, DISTT. - RAIGARH.
Estimate of Balance Work for Road Works, Laying of Balance Sewerage Network, Construction of Manholes, Laying of HDPE Pipe from IPS to MPS and Rising Main from CCT to Saraswati Drain for 4.50 MLD Sewerage Treatment Plant in Village Siwan Tehsil Siwan
Remodelling of SWD by construction of Box drain from ICE Magic Cafe, near Shaikpet Flyover to Brindavan Colony Gate No. 2 for removal of Water stagnation at Shaikper Flyover in Ward No. 223, Shaikpet, Circle 32, Golconda, GZ, GHMC. (Rs. 165.00 Lakhs)
providing water supply distribution pipelines from a near dhobhi Ghat Strom Water Drain Culvert in Ward No28 to near Donka Road culvert in Ward No27b to Makkina Samson Raju housein Lenin Nagar WardNo2 under 15th FCADP Tied Grant of 2025to26 1st instalment
Remodelling of SWD by construction of Box drain from Brindavan Colony Gate No. 2, near Shaikpet Flyover to MF Function hall for removal of Water Stagnation at Shaikpet Flyover in Ward No. 223, Shaikpet, Circle 32, Golconda, GZ, GHMC. (Rs. 190.00 Lakhs)
Construction of concrete road and massonary box drain Ananda Pally in verious locations such as from Sitala Mandir to h/o. Suren Basu, h/o. Sushen Biswas to main road of Irrigation--- under ward no. 22 Within BMC. (Fund- U.D. and M.A Fund)
Construction of concrete road and massonary box drain Rabindarpally Manasha goli and Sitala Temple goli from AE-213 to opposite of AE-190 and AF-50 to Sitala Temple on thakdaro road under ward no. 23 Within BMC. (Fund- U.D. and M.A Fund)
Construction/Imp. and Dev. of road and drain by pdg. RMC from H. No. S-242 B to Primary School Village and H. No. S-219 to H. No. S-213 in School Block in Shakarpur Ward No. 202 AC-58 SSZ
C/o R/walls, B/walls at different RDs, Toe walls, wing wall and catch pit of HPC at R.D. 0/365, 0/540, 1/495, 2/710 and C/o V-shape drain in between km. 0/0 to 3/0
Custom Bid for Services - ETP CLEANING WORK, Custom Bid for Services - CLEANING OF SULPHATE PLANT, Custom Bid for Services - CLEANING SPRAY POND, Custom Bid for Services - CLEANING OF DRAIN Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based Cleaning, Sanitation and Disinfection Service - Outcome Based
Removal of Accumulated Mud from the Side Drain of Flank including Scarification of Mud from road surface From Junction of St No 878 St No 3333 for 600 m length towards 3rd Rotary 100 m length along St No 878 in AA IIIG Newtown Kolkata
Upgradation of cement concrete drain from the (i) Hunuman mandir to Anup Patra (ii) H/o Gopal Birbanshi to Babu Birbanshi (iii) H/O Dabu Kabiraj to Babu Kabiraj (iv) H/o Bhalu Birbanshi to Sujit Rakshit in ward no-12 Under Bolpur Municipality
Upgradation of cement concrete drain from the (I) H/O Biru Mukherjee to Prahallad Dutta (ii)H/O Partho Saha to Babu Sona Sarnokar (iii) H/O Sanju Archya to Buro Bhandari (iv) Krishna Mondal to Babusuna in ward no-12 Under Bolpur Municipality.
Km 0.00 to 1.30 Providing widening with 150mm GSB and Stg with 100mm thick DLC plus 280mm thick PQC in 7.00 M Cw. and providing CCB over 150mm thick GSB in 4.59 M (Along both side of Cw) plus Provision for Side Drain (Both side)
Construction of paver block road 1) sf. from soni mandirm to MD hakim House and Shivaji Mahato (Pinky Jadav to Mahananda River) at Maharaja Colony, 2) Construction of paver block road both side drain sf. from sagar jadav to Namita Sahani house...W-4
1) construction of paver block road and one side drain s/f Prakash das house to Jitendar das house santoshi nagar road no 2, 2) s/f Binod kr singh house to Mahadeb Jaiswal house santoshi nagar , 3) construction of paver block road ..W-5
Construction/Imp and Dev. of road and Drain by Pdg. RMC from H.no. S-192A to H.no. S-197 and H.no. S-198B to H.no. S-193 and Link Near H.no. S-203 in School Block in Shakarpur ward no. 202, AC-58, SSZ
Construction of Balance Multi Storey building including Internal Water supply, Sanitary and Internal Electrification For 174 Nos. (G+3) of DUs by Monolithic Technology with Infrastructure (road, drain, water supply, sewerage, rain water harvesting etc.) under HFA Scheme AHP Project at Near Recando Slum Chingrajpara
Maintaining, Cleaning & Repairing of Gravity & Pumping pipeline of Under Ground Sewage Project for works site of DAKOR Nagarpalika including all pumping station with repairing of motor and starter panel board,all sewer network,all house connection ... with drainage chambers ...
OIL PUMP BELT SPZ 875, TOROIDAL GASKET 52X25, LIPPED GASKET PAULSTRA, TOROIDAL GASKET R 17, TOROIDAL GASKET R 21, TOROIDAL GASKET R 23, TOROIDAL GASKET R 27, TOROIDAL GASKET R 28, 1ST STAGE SUCTION DISCHARGE, 3RD STAGE SUCTION, 3RD STAGE DISCHARGE, ... STAGE DRAINAGE HOSE, ... STAGES DRAINAGE HOSE, ...
OIL PUMP BELT SPZ 875, COMPRESSOR BELT VSX 2096 L10, ELASTIC RING 39I, ELASTIC RING 47I, ELASTIC RING 92I, TOROIDAL GASKET R 21, TOROIDAL GASKET R 23, TOROIDAL GASKET R 27, TOROIDAL GASKET R 28, TOROIDAL GASKET F48X2, TOROIDAL GASKET R 22, SPARE ... STAGE DRAINAGE HOSE, ... STAGES DRAINAGE HOSE
Construction of Cement Concrete Drain (i) H/O jibon das to Bam chakraborty (25.0) (ii)H/O Kalyani to Basu Mukherjee (26.0 m) (iii) H/O Puja Hotel to Anima mirdha (33.0m) (iv) H/O Nandan Bhakat to Sridhar house (48.0m) (v) ifo Mirdah house(40.0m) at
C/O R/wall at Rd. 0/803 to 0/813, B/wall in G.I wire crate at Rd. 0/836 to 0/870, B/wall at Rd. 1/795 to 1/805, drain at Various Rds and M/T at Rd. 1/800 to 2/00
R/R damages on Nahan Dadahu Haripurdhar road km.55/0 to 87/0 (SH C/O 900mm dia RCC hume Pipe culvert at RD 74/580,75/210,76/355,76/460,77/900, 78/520 and Unlined drain from Km. 71/00 to 79/00 in essential reaches)
R/R damages on Shihardi Musalmana to Shihardi Chamara road in Km. 0/00 to 1/200.(SH C/O U-Shape drain between Km. 0/00 to 0/666 and P/L 30mm thick Bituminous Concrete between Km. 0/00 to 0/915)Under PDNA-2023