Loading…
Loading…
78,438 results • Best match
Construction of storm water drain in Rajendra Nagar (Dr. Padmanabham Hospital to Ravi Babu House) in reach No.1 (left side) ward No.2 in Gudivada Municipality
Providing Storm water Drain from Phiroze mandir to East side gospel Church at Nandigama Donka road in 6th ward in Sattenapalle Municipality under SCSP 2016-17 grant
Construction of Storm Water Drain from Pamur Road Junction to HP Petrol Bunk along the Machavaram Road and Widening of existing CC Road near Pamur Road Junction
Proddatur Municipality - Removal of Silt in Madur Storm water Drain from Jammulamma Temple to Vazpayee Nagar and Disposal to Compost Yard at Pottipadu Road under DTCP Funds
Construction of Balance Storm Water Drain From Market Yard to Zion Luthern Church (North Side of GNT MCL Main Road) in Ward No.10 of Sattenapalle Municipality
Operation and Maintenance of Storm Water Drain from Gnanapuram BRTS Road to R&D Yard at Yerrigedda in Ward No: 41 for a period of 07 months.
Provdiing of Storm Water Drain from D.No. 6-2-382 opp to 6-2-299 Near Sai Baba Temple at Kovvur Nagar of 38th Division 55 Secretarait
Construction of Storm Water Drain from Anantha Law College to Kesavayanagunta 7th Cross (Majjigakaluva) in Ward No. 14 Under 15th Finance-2023-24 (Ist Installment) Untied Grant.
GGMP Funds-Construction of Storm Water Drain from Culvert at D.No.34-454 to D.No.34-910, GK Nagar in Division No.1 of Chittoor Municipal Corporation.
Re-Construction of Storm water Drain to West side of Basivi reddy Peta Main Road from D.No.14-13-1 to 14-10-1 in 12th Ward
Proddatur Municipality - Engaging Tractor for Silt Removal in Madur Storm Water Drain from Jammulamma Temple to Vajpayee Nagar and Disposal Point at Compost Yard in Pottipadu Road
Replacement of damaged distribution pipe lines from Gujjarlapudi Sundara Rao house to Storm water drain culvert in 6th ward in Sattenapalle Municipality Under SCSP 2018-19 Grant
Construction of Storm Water Drain at 1st reach from Adithya College to towards Eastern side in ward No.21 in Narsapur Municipality under 4th Finance Commission Grant
Construction of RCC Storm Water Drain STV nagar Entrance (Near Influence shop) to 19-M10-16/G at New Indira nagar in Ward No. 13 and 14.
Kanigiri Nagara Panchayat - 14TH FC Basic Grant 2017-18 (RADP) - Construction of Storm water Drainage system from Basavaiah Center (D. No. 8-58-59) to Papireddy Chowk (D.No.8-86-A/28), in MSR road Ward No.15.
Kanigiri Nagara Panchayat - 14TH FC Basic Grant 2017-18 (RADP) - Construction of Storm water Drainage system from Ongole Bus Stand (D.No.2-204A) to Basavaiah Center via Boddu Chavidi (D.No.7-210) in Ward No.19 (2ND CALL)
Construction of Storm water drain from Paper mill Puntha Road to Disposal drain at FRU Unit via Tummalava and Reconstruction of culvert at Devi Chowk.(under 14th Finance Commission Grant Work )(5th Call)
Construction of 900mm storm water Drain from D.No.9/274 to D.No.9/A-4 main road and 300mm Drain from D.No.9/1-A-12 at S.T Colony, in Ward No.25
Construction of Storm Water Drain form D.No. 1/456 to 1/463 Opp to Murali theater and Construction of CC Drain from 1/546 to 1/595 (Near Rajiv Nagar) in 21st Division.
Construction of Storm water drain from Paper mill Puntha Road to Disposal drain at FRU Unit via Tummalava and Reconstruction of culvert at Devi Chowk.(under 14th Finance Commission Grant Work )(5th Call)
Construction of 900mm storm water Drain from D.No.9/274 to D.No.9/A-4 main road and 300mm Drain from D.No.9/1-A-12 at S.T Colony, in Ward No.25
Construction of CC Drain from (Tompala Lakshmi house) to existing storm water drain connecting (Both Sides of the Road) towards west side in SC Chinna Veedhi, in Ward No.20 of Rajam Municipality.
O and M to Desilting of Bandirevucodu Medium drain and its minor drains in the jurisdiction of Drainage section 2 Challapalli
Modernisation of Bhattiprolu main drain from km 8.00 to Km 16.600 including Medium and Minor drains in Bhattiprolu Main drainage basin
O and M to Desilting of Bandirevucodu Medium drain and its minor drains in the jurisdiction of Drainage section 2 Challapalli
providing cc drain at nalla vari street in 28th division.
Construction of CC Road at Vivekananda Nagar from Door No. 15-2-120 to Storm water drain, Ward No.21 of Palasa- Kasibugga Municipality Under Municipal General Funds
Construction of 450 mm storm water drain from door No. 20-5-20 to 12-1-142 in golla veedhi in ward No. 20 in Palakonda Nagar Panchayat.
Construction of RCC Storm water drain at RTC WorkShop road from Seetharamayya Street to Lorry Stand cross road in 40th Division. (General Funds) Rc.E6 -117450/2022 5th Call
Construction of Storm Water Drain from D.no.14-3-15 to 14-3-2 at Battilapeta Nidadavole Municipality under 15th Finance Commission Untied Grant 2020-21 (2nd Installment)
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)6th Call GGMP Funds
Construction of CC Road at Vivekananda Nagar from Door No. 15-2-120 to Storm water drain, Ward No.21 of Palasa- Kasibugga Municipality Under Municipal General Funds
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)10th Call GGMP Funds
Badvel Municipality - 14th FCG 2016-17 - Construction of 600mm size Storm Water Drain from D. No. 6-2-365 to 6-2-735 Medhara Veedi in 12th Ward.
Construction of Storm water Drain from D.no.49/7-1542 to Opp.D.No.49/5-809 and D.No.49/7-1542-1 at Lakshmi nagar in ward no.23.
Providing Storm Water Drain from Transformer to Kannali Kaluva in Nakka Harijana Wada Reach-3 in Srikalhasti Municipality (D. No. 12-172 to Opp P No. 4/59)
Providing Chainlink fencing to storm water drain from opp. D.No. 20-1-415/C1/B1 to Karakambadi Main Road and Navodaya Colony in Ward No. 6 and 8.
14th Finance Commission Grant - 2017-2018 - Construction of Storm Water Drain at Kotha Thimmapuram from D.No: 37-5-131/B to KKRK Puram Cheruvu in Ward No. 01.
Construction of Storm water drain from TTD Kalyanamandapam (C-Camp Circle) to via R&B Quarters to D.E.E. R&B office in Maddur nagar in ward no.23.
Construction of 300mm Size Minor Storm water drain from D.No.28/1052-88-2C to 28/1052-88-1A at Deva Nagar ward No.25 under SCSP Grant
Construction of Storm water drain works for the balance length of road (700m) 100 feet wide Master plan road from Rushikonda Beach road Jn. to GITAM Medical College
Construction of Perimeter road, Emergency Access road, RCC Storm water drain, Security Watch Towers , Boundary wall for part of newly acquired land at Runway 29 at Kadapa Airport
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)2nd Call GGMP Funds
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)10th Call GGMP Funds
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)10th Call GGMP Funds
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)3rd Call GGMP Funds
Construction of RCC Storm Water drain to Krishnaveni Road W/S from Fish Market to Avanigadda vari Street in 9th Division. (MAUD-10733-29052)10th Call GGMP Funds
Construction of CC Road at Vivekananda Nagar from Door No. 15-2-120 to Storm water drain, Ward No.21 of Palasa- Kasibugga Municipality Under Municipal General Funds
Construction of RCC Storm water drain with cover slabs and providing footpath tiles at koppisetti vari street near vivekananda junction at kambala park in 5th division.(Re-Call)
Construction of RCC Storm water drain at RTC WorkShop road from Seetharamayya Street to Lorry Stand cross road in 40th Division. (General Funds) Rc.E6 -117450/2022 3rd Call