Loading…
Loading…
586 results • Best match
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture NFSSB, CSB, prime coat, tack coat 40 mm bituminous concrete etc
GSB WBM PMC with seal coat CD Protection work and side drain etc
Earth work, Shoulder, GSB, WBM-II, WBM-III, MSS, Cross Drain and etc.
1.RCC Drain 2.Box Culvert 3.Scarifying 4.Subgrade 5.CC pavement
Earth work GSB CTB MSS Protection Work CDs Side Drain and road furniture
GSB CTB PMC with seal coat CD Protection work and Side drain etc
Formation cutting, GSB, WBM, MSS, RCC slab culvert , Protection wall and CC drain
Earth Work GSB CTB MSS Protection Work CDs Side Drain and road furniture
Formation cutting, GSB, WBM, MSS, RCC slab culvert , Protection wall and CC drain
FC, ,Sub-grade, Sub-Base, Base Course, BT, CD, protection Wall and Drain
FC, RCC Slab Culvert Pucca Side Drain, Earthen Side Drain R B Wall Sub Grade preparation Shoulder Setting Out Road Furniture, WBM-I, II, III , prime coat, tack coat 20 mm bituminous concrete etc
Jungle clearance, FC, CDs, Protection Work, NFSSB, CSB, GSB, WBM, BT, CC Drain etc
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
Dismantling, GSB for additional width ,WBMIII , PMC with seal coat and CC drain etc.
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
FULL DEPTH RECLAMATION WORKS (FDR)
PROVN OF STREET LIGHT AT BOMDILA AND COVERING OF FIRE FIGHTING TANK WITH IRON GRILL/ WIRE MESH NEAR SMB PH-II OF JAT AND HARD STANDING FOR WASHING UTENSILS AND COVERED DRAIN NEAR BLDG NO CH-35 OF SIKH LI OF AGE B/R AND E/M UNDER GE TENGA
Earth work, GSB, CTB, MSS, RCC Culverts, CD, CC Side Drain, Road Furniture and etc.
Earth work, CD, CC Drain, GSB, WBM III, MSS BT, Protection works Road furniture etc
Jungle clearance, Earth Work, Excavation for CD, 15m Minor bridge, protection works, side drain etc.
Earth work, GSB, CTB, MSS, RCC Slab Culvert, Protection wall, CC Drain, Road Furniture and etc.
Formation cutting, GSB, WBM 2, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
FC, GSB, WBM, CDs, R/B Walls, Prime Coat, Track Coat, CC Drain, Road Furniture etc
FC, GSB, WBM, CDs, R/B Walls, Prime Coat, Track Coat, CC Drain, Road Furniture etc
Foundation, Sub-Structure, Super Structure, Wing Wall, Retaining Wall, Protection Work, Approach road, CC Drain etc
Earth work, CD, CC Drain, GSB, WBM-II, III, MSS (BT), Protection works Road furniture etc
Formation cutting, GSB, WBM 2, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
Formation cutting, GSB, WBM 2, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, R/B wall, Side Drain, Nano Tech, PMC with Seal Coat and Road inventories
Jungle Clearance, FC, CDs, R/B Walls, NFSSB, CSB, BC, Prime Coat, Track Coat, CC Drain, Road Furniture etc
Earthen Shoulder, FC, CDs, RB wall, Side Drain, Nano Tech, CC paved, PMC with Seal Coat and Road inventories
Earthen Shoulder, FC, CDs, RB wall, Side Drain, Nano Tech, CC paved, PMC with Seal Coat and Road inventories
Jungle Clearance, FC, CDs, R/B Walls, GSB, WBM-III, Prime Coat, Track Coat, MSS, CC Drain, Road Furniture etc
Jungle Clearance, FC, CDs, R/B Walls, Gravel/Soil Aggregate, WBM-III, Prime Coat, Tack Coat, MSS, CC Drain, Road Furniture etc
Formation widening, RCC culvert, Pucca side drain, Protection wall, Sub Grade preparation, Shoulder, GSB, WBM III, PMC, Setting out, Road Furniture etc.
SPL REP TO BLDG NO. T-79, SPL REP TO BLDG NO. T-33, SPL REP TO BDLG NO. T-43 AND T-88, SPL REP TO BLDG NO. T-70, T-72, T-76, T-77, T-78, T-64, SPL REP TO BLDG NO. T-15, SPL REP TO COVERED DRAIN IN COOK HOUSE AND OR BATHROOM AND SPL REP TO BLDG NO. T
Oil Filter, Fuel Filter, Engine Mtg Pad, Oil Seal Front Axle, Control Cable, Ram Service Kit, Rear Brake Shoe, Fog Light, Plug Oil Drain Rear
Formation Cutting, RCC Slab Culvert, Pucca Side Drain, Protection Works, Sub Grade Preparation, Shoulder, CSB, Prime Coat, Tack Coat, BC, Setting Out, Road Furniture etc
Formation Cutting, RCC Slab Culvert, Pucca Side Drain, Protection Works, Sub Grade Preparation, Shoulder, CSB, Prime Coat, Tack Coat, BC, Setting Out, Road Furniture etc