Loading…
Loading…
586 results • Best match
Construction of Pedestrian track and storm water drainage system from Mirmir charali to Medical Charali near Riba canteen Pasighat, East Siang, Arunachal Pradesh(SH - Storm water drain, pedestrian track, Urban forestry and allied work) Phase-1
C/o Storm Water Drainage in Dirang West kameng District.
Construction of storm water drainage system in Changlang township area.
CONSTRUCTION OF STORM WATER DRAINAGE AT NAMSAI UNDER RIDF, PHASE-I
CONSTRUCTION OF STORM WATER DRAINAGE AT NAMSAI UNDER RIDF, PHASE-I.
Storm Water Drain in Itanagar Capital Region
Const. of RCC Storm Water Drainage System at Market area of Boleng township
I). C/o Protection wall and storm water drainage at Donyi Polo Colony,Itanagar
Const. of Storm Water Drainage System at back side of main market line at Pangin
Up gradation of internal service road with CC Road along with storm water drainage system at FSD Banderdewa.
1. Bore well at C-sector school. 2. 4 nos. of Ring well at various location under ward no.10 Itanagar. 3. wall with storm water drainage. 4. storm water drainage near primary school. 5. Ring well at C-sector, ward no.10, Itanagar.
1.Desiltation of storm water drainage from satyam steel factory to NH-415 upto Police Station Naka Banderderwa under ward No.20.
1.Upkeepment of storm water Drainage system at D-Sector, ward No. 14, 2.Co Protection wall at C Sector Ward No. 14.
i)Co RCC wall and Drainage system at Forest Corporation near Arunachal Dawn Hills School under Ward No1 ii)RCC wall and Storm water drainage system at RWD road near Tapak Raji Resident Chimpu under
RFP for Construction of MSW Plant at Karsingsa Survey Design and Drawing site development work RCC Storm Water Drainage with RCC Slab Cover RCC Protection Wall on EPC Contract mode
1 Improvement of approach road SH CO culvert and drain 2 CO storm water drain at polo colony from apex bank to cooperative bridge point
Const. of Retaining wall and Storm Water Drain to protect DC Bungalow near Tabom Laigi residential area at Post Office Colony, Daporijo
i. Development of infra-structures, roads, bridges, culverts, parks, including market sheds, acquiring of land field sites, storm water drainage works, retrofitting works on existing assets, procurement of sanitation vehicles, community assets etc. u
i. Development of infra-structures, roads, bridges, culverts, parks, including market sheds, acquiring of land field sites, storm water drainage works, retrofitting works on existing assets, procurement of sanitation vehicles, community assets etc un
Re-carpeting and Upgradation of District Headquarters Township roads at Yupia under CMCSRDPII. (SH CC Pavement, Road side CC Drain, Storm Water Drain, Construction of Divider with Grill and Box Culverts)
C/o.RCC Retaining wall at Segment -III, Karsingsa to prevent land slide and to protect the BSNL MICRO Tower ward No.20, 2. C/o Storm Water Drainage System and RCC Retaining wall near DFO Office, 3. C/o CC Pavement Road with CC drain at Karsingsa (Taw
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE KOPU.
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE TASHIGAON
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE KUGGING.
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE BISHING.
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE MANKOTA
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE MAYUNG
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE Mayung
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE Kugging
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE Pekong
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE Lali
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE BISHING.
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE KOPU
C/o RCC Storm Drainage at P Sector,Nirjuli,ward No.19,RCC Drain with cover section,C/o RCC Retaining Wall at D-Sector, Nirjuli,C/o CC drainage work at kappa colony Nirjuli,ward no.19,RCC Drainage at Hr. Sec. School via E-Sector Area, Nirju
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE RISHING ONGKONG
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE Rishing Ongkong
C/o Storm Water Drainage with slab cover at Niya Colony, ward No.19,C/o Ringwell near Ratan Tamo,Emi Village Nirjuli,C/o Ringwell near Laurel Class, niya Colony,Nirjuli,4.C/o Ringwell near Residence of Shri Techi Lana,Niya Colony,Nirjuli
1C/o.Retaining wall below water treatment plant,Rakapcolony,ward No.18,Naharlagun, 2.C/o toilet and Bathroom with overhead water tank at Banderdewa check gate, 3.C/o storm water drainage at Banderdewa/Karsingsa under ward No.20, 4.C/o Retaining wall
C/o RCC drainage along with the natural Nallah from Medical College Campus to River Dikrong at Naharlagun.
CONSTRUCTION OF BARBED WIRE FENCING AT UNE-NALLAH BOP OF 61 BN ITBP PASIGHAT (AR)
Integrated Development Works including Cleaning Desiltation of Drains at Sekey Nallah Construction of Borewells at Narba Colony and Development of Roads Culverts and Streetlights at Sekey Narba Abotani Colonies under IMC Jurisdiction Itanagar
GSB, WBM, MSS,pucca drain, cc Pavement etc
BT, GSB,WBM, PMC and pucca drain etc
RCC Hume pipe drains
Paver Block , GSB,WBM, PMC and pucca drain etc
Paver Block , GSB,WBM, PMC and pucca drain etc
Paver Block , GSB,WBM, PMC and pucca drain etc
C/o CC Pavement Road and CC Drain with One no. Slab Culvert from Jully Road Korjil Bridge Point to MT Colony at Papu Nallah.
Paver Block GSB,WBM, Protection wall and pucca drain etc