Loading…
Loading…
22,099 results • Best match
Construction of Drain by pdg Brick Work and Precast RCC Slab from H.No. B80 to B124 (Laxmi Narayan Mandir lane) in Dayanand Colony In Ward No. 146 (Amar Colony) / Central Zone
Remodeling and Construction of Drain from H No. B-2/19 near Raghunath Mandir to Pump House E Block, Krishna Nagar in Ward No. 211 in AC- 60 Shah. South Zone
a
a
a
a
Repair and Maintenance Infrastructure assets in R-IV Division during 2017-18. SH- Extension of existing 450mm dia stone water RCC drainage system with silt type chamber to prevent this surface rain water flow toward Africa avenue under bridge
Cleaning and removal of Malba Waste Material from Tikri Khurd Drain and disposal of same to approved dumping point and its maintenance for a period of 02 months
Cleaning and removal of Malba Waste Material from Khera Kalan Drain and disposal of same to approved dumping point and its maintenance for a period of 02 months
Cleaning and removal of Malba Waste Material from Naya Bans Drain and disposal of same to approved dumping point including its maintenance for a period of 02 Months
Construction of Boundary Wall on left side of Naya Bans link drain near Holambi Khurd Metro Vihar resettlement Colony to prevent the illegal dumping of municipal solid waste
Cleaning and removal of Malba Waste Material from Bankner Link Drain and disposal of same to approved dumping point including its maintenance for a period of 02 Months
Cleaning and removal of Malba Waste Material from Alipur Link Drain and disposal of same to approved dumping point and its maintenance for a period of 02 months.
Plantation of trees on both banks of Supplementary Drain from RD 16436m to RD 22471m in scattered patches and its Maintenance upto 05 Five years
Demolishing and Reconstruction of damaged RCC retaining wall on left Bank of Supplementary Drain Down Stream of Bridge at RD 21740M Emergent Work 2nd Call
Anti-Pollution measures by providing services of hydraulic operated sprinklers Truck Mounted System and Hiring of JCB from 0m to RD 8000m of Supplementary Drain
T M of SW Drain line in NDMC area during 2025-26.
Removal of Obstructions under Railway Bridge (Right most water bay) at Barapullah Drain.
Supply and installation fixing of floating trash barrier at US RD 25700m and US RD 22471m of Supplementary Drain for preventing entry of floating materials hyacinth etc. into Us of temporary wiers
Plantation of plants Shrubs and Hurbs along boundary wall Vacant space available on Supplementary Drain between RD 22471m Left bank side and RD 34500m Left bank side including maintenance of 1 year
Cleaning/De-silting of Nauroji Nagar Nallah from Bhikaji Cama Place to Ring Road and KP Block SDA drain from Saint Paul School to Narender Kumar Pandey Marg in Ward No. 150/SZ G
A/R & M/O to Dholpur House UPSC at Shahjahn Road, New Delhi dg. 2025-26 SH- Upgradation of drainage system and structural repairs & other misc works in UPSC Campus Subwork/Packages: CIVIL WORK
Special Repair to 2115 Type-II Qtrs. at Lodhi Road Complex New Delhi (SH: Improvement in drainage, repair of footpath and resurfacing of existing road in Pocket 3 and 4) Subwork/Packages: Civil Work
1. EOR to Central Jail, Tihar Jail, New Delhi. SH Providing and laying NP2 (RCC) Pipe line from court complex at nallah at PHQ for emergency work to pass overflow sewerage due to blockage of DJB main sewer line). 2. EOR to Central Jail, Tihar Jail, N
EOR to Central Jail, Tihar Jail, New Delhi. SH Providing and laying NP2 RCC Pipe line from court complex at nallah at PHQ for emergency work to pass overflow sewerage due to blockage of DJB main sewer line 2. EOR to Central Jail, Tihar Jail, New Delh
Road restoration work for BSES road cutting ,A-C,C-E Road Restoration work for 33 KV Infeeds to CPWD Kasturba Nagar by LILO of 33 Ckt from 220KV Lodhi Road DTL to Kushak Nallah (ES24GS4021), New Delhi, under Division SER-1, Sub-Division SER-14...
Engaging of labour, back hoe loader and tipper truck for improvement of drainage system in following drains i.e from Hanuman Mandir to Police Station Mehrauli, Dargah to jamali Kamali, Aam Bagh DDA park to Shamshi Talab, Sector A Pocket
Imp./Dev. of lane and drainage system by Pdg. RMC, B/W, CP etc. from H.no. C-96 to C-115 in C-Block Ashok Vihar Ph-1 under ward 64/KPZ.
Imp./Dev. of Road and drainage system from H.No. C-1/1 to H.No. C-1/3D-1 by Pdg. RMC in Model town-III in Ward No. 68/KPZ, Model Town.
1. REPAIR AND MAINTENANCE OF INFRASTRUCTUIRE ASSETS IN R-II DIVISION DURING 2022-23. SH - DE-SILTING OF DRAINAGE SYSTEM AT UPSC LANE UNDER THE AREA OF SUB DIVISION-II(R-II).
A/R and M/O to various roads under Sub-Division SER-13 of Division SER-1 during 2025-26. (SH - Provision of Cross drainage at Maharani Bagh on Ring Road)_Recall
Improvement to drainage system and pdg. C. Conc. from Rajesh plot to Bijender house, balak Ram house lane and Atru house to Rajender Singh house in village Molarband W.No. 96-S CNZ.
Urinal Block-Imp. Dev. of road by pdg RMC and Drainage system from H.No.-10668 to H.No.-5898 and Link lanes at Shankar Piao to Urinal Block in Ward No.-80/CSPZ.
Imp. Dev. of lanes by pdg. RMC and drainage system from H.No. 1 to 59 in HD Block and H. No. 3 to 64 in GD Block, Pitampura, Ward No. 57/KPZ
Improvement to road and drainage system from vinod chokan house to Gyani Ram House, Amit House to Pritam house and improvement of culverts near Shani Mandir in Molarband Village W.No. 181, CNZ
Improvement of Road by pdg and laying RMC and drainage system from H.No. WZ-46 in Mukherjee Park to H-18 in Sant Nagar Extn. in ward no. 97/WZ Choukhandi Nagar.
Imp./Dev. Of lane and drainage system from F-159 to F-180 by pdg. RMC, Brick work etc. in F-Block J.J. Colony Madipur Ward No.93/WZ Madipur AC-26
IMP./DEV OF LANES BY PDG RMC AND DRAINAGE SYSTEM FROM H.NO. 4A/1 TO 4A/8 IN 4A-BLOCK ,OLD RAJINDER NAGAR WARD NO.102-N/KBZ (AC-39,RAJINDER NAGAR)
Improvement of Existing Toilet blocks, Drainage System, Water supply System, Water Proofing of the terrace, and Special repair of Rooms, Mumty, Shafts, etc of the Emergency/Casualty Block of Hindu Rao Hospital.
Imp Dev of Road by providing RMC and Drainage System from P. No. 453 to P. No. 463 and adjoining lanes in Shehzada Bagh Phase -I in Ward No. -71/CSPZ, Kishanganj.
REPAIR AND MAINTENANCE INFRASTRUCTURE ASSETS IN R-II DIVISION DURING 2022-23. SH - REPAIR OF FOOTPATH AND DRAINAGE NEAR TO 140 JOR BAGH, IN THE JURISDICTION OF SUB DIVISION-III(R-II)
Patch repair Work - Imp. and Dev. Of Paan Mandi Road by Patch Repair at various Locations by P-L RMC and Drainage System in Ward No.-89N CSPZ New Ward No.-81
EIUS (Revenue) SH, Improvement of existing lanes by providing and laying cement concrete pavement and drainage system in JJ cluster, C-Block, Budh Nagar, Inderpuri in AC-39, Rajinder Nagar (PID 15425)
Maintenance of desilting drainage and monsoon works management under Sub Division - III of Division South Road-II, PWD during 2024-25. (SH_ Providing, running and maintaining Water lifting pump for monsoon season).
AMC for controlling Leakage and Seepage in Metro stations and its ancillary structures, tunnels and maintenance of drainage system of viaduct from UDB to HCC section of L-2South. (For 03 Years).
Imp/Dev. of lane and drainage system from F-369 to F-418 by pdg. RMC brick Work etc. in F-Block JJ Colony Madipur Ward No.93/WZ Madipur AC-26
Making good the deficiency of 2016 ORT houses at Sector-4 Extn. Rohini by pdg. RMC and drainage in Ward No. 26-N, M-I/RZ Scheme Code No.RZ-16-1-005.
Imp. Dev. of Road by Providing RMC and Drainage System from P. No. 130 to P. No. 123 and adjoining lanes in Shahzada Bagh Phase-2 in Ward No. -71/CSPZ, Kishanganj.
Imp./Dev. Of lane and drainage system from E-181 to E-203 by pdg. RMC, Brick work etc. in E-Block J.J. Colony Madipur Ward No.93/WZ Madipur AC-26
Improvement of Drainage System along the main carriageway (Culvert) Near NH-8 Sanjay Point on Ullan Battar Marg Under PWD Division South West Road-I During 2020-21 Under Sub Division-I