Loading…
Loading…
21,735 results • Best match
Improvement of Inner Roads by Pgl. RMC, Construction of drain and pgl. Chamfered edge paver blocks in Mohan Singh market, INA in Ward No. 147, Kotla Mubarakpur, Central Zone
Construction of drain from Nirankari Satsang to CC Parallel Road at Main Burari Road under Sub Division-1 C and ND-R Road during 2024-25. Recall of Tender
Re-construction of drain and improvement lane by providing RMC from shop No. 5105 to shop no. 5149 in Subzi Bazar Ghanta Ghar in Malka Ganj Ward No.12.
Desilting of drains in the area of Ward No. 59E/244 Nehru Vihar in AC-69 under the jurisdiction of EE M-II/Shah(N) Zone
De-silting of all drains under the jurisdiction of EE M-II/KPZ.
Construction of Room near Daryai Nalla Chander Shekhar Azad Colony in Ward No. 81N City-SPZ
Excavation of Silt/waste material and removal of excavated malba/waste material etc from Pankha road drain from RD. 0 to RD. 3600m and its disposal at depression area near downstream of Amberhai Bridge of Najafgarh drain
Anti Erosion work at Embankement between Hathi Ghat to Drain No.12 Regulator along with strengthening of approach road.
Demolishing and reconstruction of boundary wall on right side of Pankha road drain from RD 2100m to RD 1500m.
Demolishing of RCC Slab, for Desilting at Samta Sthal stretch of Delhi Gate Drain along with other allied works
Repairing and Renovation of Boundary Wall from RD 0m to RD 1465m at Right Bank of Palam Link Drain.
Demolishing of RCC Slab, for Desilting at Samta Sthal stretch of Delhi Gate Drain along with other allied works
Construction and Renovation of Boundary Wall from RD 0m to RD 420m at Right Bank of Pankha Road Drain.
Demolishing and reconstruction of boundary wall on right side of Pankha road drain from RD 2100m to RD 1500m.
Repairing and Renovation of Boundary Wall from RD 0m to RD 422m at Left Bank of Pankha Road Drain.
Construction of RCC Retaining Wall on the right side along embankment from Hathi Ghat to Drain No. 12 regulator.
Providing and fixing steel grill on existing boundary wall from RD 3550m to RD 2100m at Pankha road drain.
Repair and renovation of boundary wall from RD 810 to RD 1350 at right bank of Palam Link Drain.
Demolishing and reconstruction of boundary wall on right side of Pankha road drain from RD 2100m to RD 1500m.
Demolishing and reconstruction of boundary wall on right side of Pankha road drain from RD 2100m to RD 1500m.
Repair and Maintenance of Infrastructure assets in R-IV Division During 2024-25. Sub Head- Improvement of Open Drains, Covering of Drain with SFRC and Repair of C.C Roads etc. in Sanjay Camp, Chanakya puri.
De-silting of Pusta road Nalla from 28 ft road to Mariginal bandh road both side SH-1 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2026 to 15.06.2026 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2026 to 15.01.2027 in
Desilting of Vijay Park Nalla from Red Light Vijay Park to Gali No. 16 Adarsh Mohalla SH-1 Ist, 60 percent of Desilting of drain in 1st Phase on 16.01.2026 to 15.06.26 SH2- 40 percent of Desilting of drain 2nd Phase from 16.06.2026 to 15.01.27 in War
De-silting of Pusta road Nalla from 28 ft road to Mariginal bandh road both side SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.2026 in
Desilting of Fruit market Nalla from Main Road Seelampur to Chauhan Bangar Culvert both side Ward No.225 Seelampur Shah(N) Zone. SH-1 60 percent of Desilting of drain in 1st Phase from 15.01.2024 to 15.06.24 SH-2 40 percent of Desilting of drain in 2
De-silting of Vijay park Nalla from Red light vijay park to Gali No-16 adarsh mohalla SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.20
Technical and maintenance of Storm Water Drainage system in R-IV Division during 2026-27 . SH- Repairs infrastructure assets like GT, Bell mouth, Manholes etc. during monsoon season under jurisdiction of R-IV division.
Technical and maintenance of Storm Water Drainage system in R-IV Division during 2025-26. Sub Head- REPAIRS/CONSTRUCTION OF GT, BELL MOUTH, MANHOLES ETC. DURING MONSOON SEASON UNDER JURISDICTION OF R-IV DIVISION
Desilting/removal of silt from SSBL drain from nathu colony railway crossing to Hanuman phatak and nathu colony nalla in ward no.222 Ram nagar East under jurisdiction of EE(M-III) Shah(N)zone.
Desilting/cleaning of Club Nallah Friends Colony West/Maharani bagh Nallah from Railway Line to C.V.Raman Marg Culvert in Ward no .89-S, Central Zone.
Desilting of Ratiya Marg Nalla both for phase I and amp II under jurisdiction of Division M-III Central Zone. (Phase I from 15.01.2023 to 18.05.2023 and phase II from 01.08.2023 to 15.01.2024) in Sangam Vihar - B, W.No. 169
Remodeling of drains based on Delhi Master Drainage Plan-2025 from Sanjay Gandhi Transport Nagar (GTK NH 44) to Samaypur Badli Underpass at Bawana Road under Sub Division NR-14 of North Roads Division, PWD, Delhi
Repair of Potholes and drainage system after monsoon season for the year 2026-27 in Ward No. 245, Brijpuri Shah (N) Zone
Repair of Potholes and drainage system after monsoon season for the year 2026-27 in Ward No. 243, Mustafabad Shah (N) Zone
Construction of Drain from I.P. Estate DTC Depot to SDMC Drain and Making Slip Road near New Railway Bridge at Ring Road between Bhairon Marg T-Junction and Entry Tunnel Ring Road under Division C and ND- Roads, New Delhi.
Construction of drain AN Repair of drain by providing Brick work, Plaster, RCC, pre-cast RCC Slab etc from near mangal dass mandir dass mandir to deepak wali gali to Bidhuri Dharamkanta to dev building material shop Bazar muhalla tughlakabad village
Construction of drain at Swaroop Nagar-Burari Road from Sub-Registrar Office to Vijay Chowk and Remodelling of existing drain at Libaspur Siraspur Road from Gali No. 16 to Community Centre , Railway Road from NH-44 to Railway Station Badli) .........
(A) Construction of RCC Structure of Steel Gate Regulator Across Nalla No. 12(A) and (B) Fabrication, Erection and commissioning of complete M.S. Gate Hoisting Bridge, M.S. Staircase etc. i/c automation of Gate at Nalla No. 12A.
Desilting of Abul Fazal Enclave Nallah in W.No.102-S(Okhla), CNZ.
Desilting of Z-Block nallah in W.No.92-S(Harkesh Nagar),CNZ.
Desilting of Pocket-12 Nallah in Kalkaji Extn. Ward No. 178/CNZ.
Desilting of TATA steel nallah in W.No.92-S(Harkesh Nagar), CNZ.
Desilting of Gola Kuan Nallah in Tughlakabad Village Ward No. 178/CNZ
Desilting of DDA Park Nallah at Pul Pehladpur, Ward No. 179/CNZ.
Trapping of partially Trapped and Un-trapped Sub-drains Falling in to Trunk drain 1 in Gokalpur AC-68 under EE( C)-08
Providing and laying Ready Mix Concrete for Road Work on Left bank of Pankha Road Drain from RD 2100m to RD 3050m.
Removal of excavated malba/waste material etc from Nasirpur drain RD 0m to RD 3000m and its disposal at SDMC, C and D waste site at Bakkarwala and its maintenance for a period of 210 days for the year 2021-22.
Removal of excavated malba/waste material etc from Nasirpur drain RD 0m to RD 3000m and its disposal at SDMC, C and D waste site at Bakkarwala and its maintenance for a period of 210 days for the year 2021-22.
T/M of SW Drains in R-I Division during 2022-23. SH Repair and construction of Manholes. G.T.S and De-silting of existing Drainage System at Atul Grover Road DMS side
Desilting of drains / nallah from DPS school Pushp vihar to press enclave road, D/S Virat drain from BRT corridor to main nallah Pushp vihar sec-4 and Central mkt nallah from BRT to main Pushp vihar nallah in Pushp vihar in ward no-166 /SZ