Loading…
Loading…
21,735 results • Best match
Abdominal Drainage Kit (V2)
Thoracic Drainage Catheter (V2)
Pigtail Drainage Catheters (Q3)
STERIMED THORACIC DRAINAGE CATHETER
Thoracic Drainage Catheter (V2)
Thoracic Drainage Catheter (V2)
Thoracic Drainage Catheter (V2)
Thoracic Drainage Catheter (V2)
Thoracic Drainage Catheter (V2)
STERIMED THORACIC DRAINAGE CATHETER
Pigtail Drainage Catheter-14Fr
Pigtail Drainage Catheter (16Fr)
Abdominal Drainage Kit (V2)
External Ventricular drainage System
External Ventricular Drainage System
EXTERNAL VENTRICULAR DRAINAGE SYSTEM
EXTERNAL VENTRICULAR DRAINAGE SYSTEM
Hiring of Tipper Trucks, Backhoe Loader, Tractor Trolley for Desilting of CPJ Drain and K Block Nalla Ward No. 42E/225 Shah(N) Zone. SH1- 60 percentage of Desilting of drain in 1st Phase from 15.01.2023 to 31.05.23 SH2- 40 percentage of Desilting of
De-silting of Karawal Nagar Nalla from Sadatpur gali no-6 to mukhiya market chowk L.H.S SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2026 to 15.06.2026 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2026 to 15.01.
Hiring or Tipper Trucks Backhoe Loader Tractor Trolley for Desilting of Rajendra Parsad Nalla Ward No.42E-225 Shah(N) Zone SH1- 60 percentage of Desilting of drain in 1st Phase from 15.01.2023 to 31.05.23 SH2- 40 percentage of Desilting of drain in 2
De-silting of Karawal Nagar Nalla from Sadatpur gali no-6 to mukhiya market chowk L.H.S SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.
Construction of road and side drains from RD. 9980m Badli Bridge to RD. 10540m Near Pancham Sweet Chowk on the left bank of Supplementary drain in Distt. North.
Construction of road and side drains from RD 9980m Badli Bridge to RD 10540m Near Pancham Sweet Chowk on the left bank of Supplementary drain in Distt. North.
Construction of drain on Mathura Road at following locations (i) Jasola Apollo Metro Station area including connecting to existing drain (RHS).(ii) Near Sukhdev Vihar RD 400 to 1070 (LHS).(iii) Priyanka camp to infront of CRRI (RHS).
De-silting of Nallah/drains (1) Captain Rishal Singh Marg from Old Pavement Road to Chhawla Road (2) Gurudwara Road Nallah from Chhawla Road to Dharampura Drain (3) Old Kakrola Road Nallah from Dabas Medical Store to F.C. Drain to back side of Ro
Re-Construction of drain and improvement lane by providing RMC from shop No. 5105 to shop 5149 in Subzi Bazar Ghanta Ghar in Malka Ganj Ward No.12.
Construction of drain from SBI Bank towards Chaudhary Farm on Mandi Road under Sub-Division SR-13/Division South Road-1, PWD GNCTD, New Delhi during 2025-26.
Construction of drain by pdg. B/w, 12mm cement plaster, Precast Slab etc.from Harizan Chaupal No. 2 to Post office Khyalla in Ward No. 95/WZ Vishnu Garden
Construction of drain at Road from B-8 to corner of DJB booster pump (From B-8 road to Divya Jyoti Appt.) Rohini Sector-19 dg. 2021-22.
Construction of drain of rectangular cross section with RCC covering from Hno 1 to Hno 173 along church road in sukhdev vihar in ward no 174, central zone
Construction of drain at Road from B-8 to corner of DJB booster pump (From B-8 road to Divya Jyoti Appt.) Rohini Sector-19 dg. 2021-22.
Desliting of Gaffar Manzil Nallah in W.No.189, Zakir Nagar, CNZ.
Desilting of Jheel park nallah at Ward No. 61 Kohat Enclave.
Desilting, disposal and maintenance of Nallah No.15 for Six months
Desilting of Nai Basti Nallah in W.No.102-S(Okhla), CNZ.
Desilting of Jagdamba Road Nallah in Tughlakabad Extension, W.No. 170/CNZ.
Maintenance of Pankha Road drain from RD. 0 to RD. 3600m for a period of 180 days.
Maintenance of Palam link drain from RD 0m to RD 1465m for a period of 180 days.
Maintenance of Palam link drain from RD 0m to RD 1465m for a period of 180 days.
Construction of boundary wall between RD 1350m to RD 1465m on left bank of Palam Link Drain.
Removal of obstruction and floating material from Shahbad Mohammadpur drain from RD 0m to RD 225 m.
Removal of obstruction and floating material from Shahbad Mohammadpur drain from RD 0m to RD 225 m.
Removal of obstructions from the bed of SaritaVihar drain D/S of Mathura Road to Agra Canal.
Maintenance of Pankha Road drain from RD. 0 to RD. 3600m for a period of 180 days.
Repair of inspection path on left bank of pankha Road Drain from RD 2100m to RD 2715m.
Maintenance of NG Pond drain from RD 0m to RD 1942m for a period of 180 days.
Maintenance of Pankha Road drain from RD. 0 to RD. 3600m for a period of 180 days.