Loading…
Loading…
22,049 results • Best match
Improvement of streets pavement and side drains at Mustafabad Extension in Mustafabad Constituency.(AC-69) (Regn. No.995/895) (Balance Work) including Maintenance for 5 years.
Desilting of R and S block nallah(including removal of floating material) from outer ring road to S-363 to B-272 and Ajit Arcade Nallah near LSR college from Lala Lajpat Rai Marg to Kalka Devi Marg and Sant Nagar Covered drain and B block drain from
Desilting of GK-I Nallah from Link road (Hansraj Gupta Marg to BRT ) to Lala Lajpat Rai Marg Culvert near Central School in ward No. 173 (Greater Kailash-I) South Zone.
S/R OF ROADS IN NDMC AREA DURING 2025-26. SUB HEAD-RECTIFICATION OF WATER LOGGING AT VINAY MARG BY REPLACING DRAINAGE PIPE LINE THROUGH TRENCHLESS TECHNOLOGY.
Improvement of streets pavement and side drains at Brijpuri (Part-2) in Mustafabad Constituency (AC-69) (Regn. No.736/895) including Maintenance for 5 years.
Construction of 62103 Sq feet area food grain godowns along with office block, boundary wall, Roads, Drains and electrification works at CW Kolathur, Kasargod, Kerala.
Construction of 1 Conventional Godown and 1 No of PEB Godown _for Industrial Storage_ with internal roads, drains, electrification works, etc. at CW, Waluj _Mah_
Construction of 75121 Sqft area capacity food grain godowns in two no. units along with Internal Roads, Drains and electrical Installation at CW, Sohela, Odisha.
Improvement of Link Road and side drains at Ganga Vihar H-Block,Bhim Wali GaliJohripur and Meet Nagar( Along ShamshanGhat) inGokalpur Constituency (AC-68).
Laying drain line from 5 TPD Bio Methanation Punjabi Bagh plant to flood drain in west Zone under the Jurisdiction of SDMC
Upgradation of infrastructure in existing running room & lobbies of Delhi Main Station and Shakurbasti and Repair to Boundary wall 1st and 2nd Entry side, Repair to Manhole Chamber on PF and Yard, Repair to Signal and Yard master Hut and offices at ... of drain from ... of Drain , ... and Construction of Drain from ...
Hiring of tractor and Supplying of Earth at inlets of various Drains outfalling in River Yamuna for flood like situation during 2025 26
Construction Of Drain By Providing Brickwork From Paryavaran Complex B block To Drain Near Mandir Marg in Saidulajab Village, Ward No. 160, Saidulajab, M IV/SZ.
a
Providing and fixing steel wire mesh on bridges / culverts at RD 1230 m, RD 2315 m, RD 2365 m, RD 2600 m, RD 2975 m, RD 5000 m, RD 5520 m, RD 6600 m, RD 9650 m, RD 11020 m and RD 13025 m on Drain No.6 to protect direct thrown malba/ household waste i
Maintenance of Burari Creek drain from RD 0 m to RD 6500 m, RD 6900 m to RD 8863 m and New Course from RD 0 m to RD 600 m including supply and installation / fixing of floating trash barrier near RD 450 m, RD 900 m, RD 1100 m, RD 1400 m, RD 1770 m, R
Desilting of Gokalpur drain from DJB pump house to E-184 2nd pusta Usmanpur in Ward No. 229, Brahmpuri (Part-3) in AC-66 under the Jurisdiction of EE M-II/Shah(N)
a
Pdg. and fixing of SFRC slab 100mm on drain at main Karawal Nagar Road in Dayalpur and Nehru Vihar Ward No. 244 in M-II Shah (N)
Cleaning and removal of Malba Waste Material from Bankner Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 02 Months for flood season 2021
Cleaning and removal of Malba Waste Material from Naya Bans Drain and disposal of same to MCD approved SLF including its maintenance for a period of 02 Months for flood season-2021
Cleaning and removal of Malba/Waste Material from Bankner Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 03 Months for flood season 2022
Cleaning and removal of Malba/Waste Material from Sanoth Link Drain and disposal of same to MCD approved SLF including its maintenance for the period of 3 months for flood season 2022
Cleaning and removal of Malba Waste Material from Alipur Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 02 months for flood season 2021
Cleaning and removal of Malba Waste Material from Sanoth Link Drain and disposal of same to MCD approved SLF including its maintenance for the period of 2 months for flood season 2021
Cleaning and removal of Malba/Waste Material from Bankner Link Drain and Disposal of same to MCD approved SLF including its maintenance for a period of 10 Months for Flood Season 2025
Cleaning and removal of Malba/Waste Material from Alipur Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 03 months for flood season 2022
Cleaning and removal of Malba/Waste Material from Bankner Link Drain and Disposal of same to MCD approved SLF including its maintenance for a period of 04 Months for Flood Season 2024
Deployment of tractor trolley, JCB machine, labour for miscellaneous work supply of earth and filling of EC bags at Bawana Escape Drain RD - 0 M to 19700 M during Flood Season 2024
Construction of PEB Godown of 119402 sqft area Capacity with internal roads, drains, Boundary wall, electrification works, firefighting works and ancillaries buildings, etc. for CWC at Gorakhpur, Uttar Pradesh.
Construction and repairing of existing CC pavement and SW drains (Nali) in JJC, Sonia Gandhi Camp near Petrol Pump, Samalka Phase-II of Bijwasan AC-36
Construction and repairing of existing CC pavement and SW drains (Nali) in JJC, behind Police Station, Vasant Kunj, Sector-C, Pocket-9 of Bijwasan AC-36
DESILTING OF NALLA DRAIN (Phase-I and Phase-II ) Radha Sawami Satsang Bhawan Durga Vihar FROM Transforme TO PWD ROAD , Dinpur Extension Pirl Hospital FORM VIJAY PAL HS TO PWD ROAD AND REWLA KHANPUR NALLA FORM PHIRNI ROAD TO JHATIKARA ROAD IN WARD NO
Disposal of Garbage, C and D waste from Mungeshpur Drain between RD RD. 0m to 10362m upto MCD Processing plant at Burari, Khampur, Bakkarwala
Name of work , E.I.U.S.Revenue Sub Head , Construction of drain and C C Pavement in J J Cluster Kohat Enclave.
Desilting of drains of Un authorized area Rama Park Road Drain Pipal Road Drain D K Road Drain Gurudwara Road Drain Kabari Road Drain in Ward No 114 Nawada under jurisdiction of EE M-II WZ
Technical Maintenance of SW Drainage System in R-II Division during 2026-27. SH - Providing and laying 450mm dia NP2 RCC Pipe for drainage system front of G and H Block (B K Dutt Colony), Jor Bagh Lane area under Sub Division-III(R-II Division).
Reconstruction of road from Baba Haridas Temple, Jharoda Phirni to Mungeshpur Drain in Najafgarh Drain, AC-35
Providing and Placing of Precast RCC Drain Cover at Various Drain in Model Town AC Balance Work
De-silting of Drain from Tanga Stand Moti Nagar to Nazafgarh Drain in ward No. 90/KBZ.
Providing and Fixing of Porta Cabins for site office use at Bijwasan Drain and Bijwasan Bund Drain.
.
Imp. Dev. of drainage system at AP-Block, BP-Block, WP-Block, VP-Block and H. No. 1 to 100 Vaishali at Pitampura, C-64/KPZ
Providing and Fixing hard drawn steel wire mesh fencing on parapet wall of bridge and protection work on both side of bridge at RD 16635 M of Bawana Escape drain in Dist. North
Cleaning and removal of Malba Waste Material from Khera Kalan Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 02 months for flood season 2021
Cleaning and removal of Malba/Waste Material from Naya Bans Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 03 Months for flood season 2022
Cleaning and removal of Malba/Waste Material from Khera Kalan Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 03 months for flood season 2022
Cleaning and removal of Malba Waste Material from Tikri Khurd Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 02 months for flood season 2021
Cleaning and removal of Malba/Waste Material from Tikri Khurd Link Drain and disposal of same to MCD approved SLF including its maintenance for a period of 03 months for flood season 2022
Comprehensive Annual Maintenance of Outer Ring Road (From District Centre to Keshopur Nala) under Division West Road-1, Sub Division WR-13 during 2022-23.