Loading…
Loading…
17,508 results • Best match
For desilting of drain nala in rainy season for three months by man power and silt disposal by Tractor Trolly in MC Kundli
Repair of street and drain type-I,type -II, nala ,R.C.C. Slab, Culvert ,M.S Jaal andpatch work etc. in M.C Limit Ismailabad (Recall)
const. of rcc nala (1.5x1.5)
Construction of waste water Nala
NALA SAFAI WORK AT GLF
CONST. OF RCC NALA 2X2
VILLAGE JOGNA KHERA CONST. NALA
SHIFTING OF EXISTING STORM WATER DRAIN BY DI PIPE LINE ALONG 45 MTR WIDE SECTOR-14 and SECTOR-33 DIVIDING ROAD REQUIRED DUE TO LAND ACQUISITION BY HSVP HISAR AT EXISTING SITE OF STORM WATER DRAIN IN SECTOR-33 HISAR,CONSTRUCTION OF COVERED BOX TYPE S
SHIFTING OF EXISTING STORM WATER DRAIN BY DI PIPE LINE ALONG 45 MTR WIDE SECTOR-14 and SECTOR-33 DIVIDING ROAD REQUIRED DUE TO LAND ACQUISITION BY HSVP HISAR AT EXISTING SITE OF STORM WATER DRAIN IN SECTOR-33 HISAR,CONSTRUCTION OF COVERED BOX TYPE S
Sealed Chest Drainage Bag - Pleural Cavity Drainage Units or Containers (Q3)
De- silting of nallah at 2K/42BP to Hardware Chowk (outer road nallah) and Masjid to 3 no. Pulia, 3 no. Pulia towards 17 no. chungi on Dabua -Pali Road nallah in Ward No.12 (New Ward), Faridabad (2026).
Casting and placement of RCC cover at storm water drain covers of various Sizes in Sector-08 at IMT Manesar
Construction and Repair of storm water drain at various places in ward no 1 IN Municipal Council Thanesar. (1st Time)
Cleaning of existing storm water drain using bucket type de-silting machine complete in all respect, HSIIDC, MIE part-B,
Construction and Repair of storm water drain at various places in ward no 4 IN Municipal Council Thanesar.(1st Time)
Hiring of High-Power Super Sucker Machine for day to day maintenance / removing of blockage from master Storm Water Drain
Estimate for De silting of Storm Water Drain of 300mm dia by Super Sucker Machine, Udyog Vihar, Phase IV, Gurugram
Cleaning and upgradation of storm water Drain on both side of Hisar-Tohana Road in Barwala in the IandD activities.
Dismantling of old damaged existing drain and Re- Construction of 2feet wide RCC Nallah from Sukhraj Pradhan Awana House to Basantpur main Road Ward No. 25 Faridabad.
Estimate for Cost. of Remaining portion RCC Nallah from H. No.489 up to Gaunchi drain at Vaidh road Parartiya Colony in ward no.-05 NIT. Faridabad.
Constructing pipeline drain for dewatering of flood water of village Meond Khurd from RD 2120 to 0 outfalling into Rangoi Nallah at RD 0.50 KM left side
De-silting/Cleaning of Storm Water Drainage line from Node no-2 to 19 and from Node no-19 to 20 in Sector-34-35, Udyog Vihar, Phase-VII, Gurugram
Providing of infrastructure facilities like roads, water supply, sewerage, Storm water drainage and street lights in balance area of RandR Pockets in sector-53, Phase-V at Industrial Estate Kundli.
Construction of nallah from America walo ki Kothi to main road kotla chownk in Ward No 06 MC Sadhaura.
Construction of nallah near Torawala pond and from wine shop to Kotla Chownk in Ward No. 06 MC Sadhaura.
Construction of nallah from in front of Ravidass Mandir to thana wala chownk in Ward No. 06 MC Sadhaura.
Providing External Storm water drainage scheme for Sector-1,3,4 and 5 MGA and adjoining area at Hisar. Construction of RCC surface drain along NH-10 from proposed Disposal site to Barwala chowk at Hisar and all other works contingent thereto includ
Thoracic Drainage Catheter
Rough Cost Estimate for Development of Sheeta Ram Mandir to Khajan House Cement Concrete Road, Culvert and Construction of Drain in Village Chandawali (Recently added village).
31/mcb/2020 Construction of drain type II both side from H/o Gulzar singh to H/o Pankaj Chauhan in ward no 3 MC Barara
construction of gali from number dar house to varidhasarm and construction of drain on the phirni in village meoka ward no 4 MC Manesar. REcall I
Widening of road, construction of drain and footpath on master road of sector 7/8 dividing road (Asset ID 1073) and all other works contingent thereto.
Relaying of street and Construction of Drain type II from JR public school to House of Monty Ex. MC and Modarn school Front Street in ward No. 04, Municipal Committee Barara.
Construction of RCC drain for Drainage of Rain Water
A. Construction of nallah From H/o yusuf to puliya village chanchak gp naneri B. Construction of retaining well is harijan mandir GP bholiwala C. Madrasa B/wall village tewar GP Islam nagar D. NALLAH FROM DERA RAHNIYATO PANCHAYAT BHUMI
CONSTRUCTION OF NEW NALA AND REPAIR OF EXISTING NALA ON GUGAHERI RD. AT VILLAGE -BAINSI , BLOCK- LAKHANMAJRA
Providing Service of JCB machine and other equipments with manpower as per DNIT for cleaning of Nala /Drains etc on lump Sum basis about 1 to 2 months in the limit of Municipal Committee Nilokheri.
CONST OF NALA AND LAYING OF RCC PIPE LINE FROM H/O DARSHAN S/O GYAN CHAND TO TOWARDS DRAIN AT VILLAGE KALAMPURA BLOCK KARNAL
Construction of RMC road along nala to shamshan ghat Ashok Vihar-II,ward no 9,Div-II, Zone-II, under MCG
construction of rcc nala at villlage Birohar
Cleaning of various Nala in Mc Narnaund
Const. of RCC Nala at village humayunpur
CONST. OF WASTE WATER NALA Guashala Dighal
A/mtc of L/s work in Sector-4 Nallah Area Panchkula. (Mtc. of grassy lawn of Nallah Area and all other works contingent thereto).
Repair of Nala from Shop of Parmod to Jagdamba factory and with attached Nala in ward no.13
BARGAT THALIPUR RE CONSTRUCTION OF NALA
widening of nala at village gadaipur
Cleaning of Nala in MC Kharkhdoa.
KUMHARIA CONST. OF WASTE WATER NALA